§ 19.145.270 — Stream buffers
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.145.270
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/9b670f05-a2bf-4627-81fa-46f1eedc11a4
19.145.270 Stream buffers.
(1) No development may take place within a stream or within the following buffer areas except as allowed within this chapter. Buffer widths shall be measured outward on a horizontal plane from the ordinary high water mark or top of bank if the ordinary high water mark cannot be identified: (a) Type F stream – 100 feet. (b) Type Np stream – 50 feet. (c) Type Ns stream – 35 feet. (2) The buffer areas established by this section do not apply to any segment of a stream that is presently within a culvert, unless that stream will be taken out of the culvert as part of development of the subject property. (3) Trails. The director may provide written approval for passive pedestrian recreation facilities designed in accordance with an approved critical area report and the following standards: (a) Trails are composed of pervious surfaces no more than five feet in width. Raised boardwalks and wildlife viewing structures composed of nontreated pilings may also be considered; (b) Trails are generally located within the outer 25 percent of the buffer; and (c) Trails shall avoid the removal of mature trees. (4) Permanently altered buffer. The director may provide written approval for a buffer reduction when existing conditions are such that portions of the required buffer exist in a permanently altered state (e.g., roadways, paved parking lots, and permanent structures) and do not provide any buffer function. The buffer may be reduced up to the area where the altered conditions exist. (5) The director may require increased buffer widths that are necessary to protect habitat, health, safety, and welfare on site specific areas as follows: (a) When the director determines that the buffer width is insufficient to prevent habitat degradation; (b) When a channel migration zone is present. The stream buffer width shall be measured from the outer edge of the channel migration zone; or (c) When the stream buffer area is within an erosion or landslide hazard area.
(Ord. No. 15-797, § 22, 6-16-15.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.
