§ 19.145.340 — Requirements for clearing and grading
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.145.340
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/65d8156f-408e-4139-8b25-a03b69ce1a11
19.145.340 Requirements for clearing and grading.
Any permitted clearing and grading activities within a stream or stream buffer area shall also comply with following requirements of this section. (1) Grading is allowed only during the dry season (May 1st to October 1st). The director may extend or shorten the dry season on a case-by-case basis, determined on actual weather conditions. (2) The soil duff layer shall remain undisturbed to the maximum extent possible. Where feasible, any soil disturbed shall be redistributed to other areas of the project area. (3) The moisture-holding capacity of the topsoil layer shall be maintained by minimizing soil compaction or reestablishing natural soil structure and infiltrative capacity on all areas of the project area not covered by impervious surfaces. (4) Erosion and sediment control that meets requirements of FWRC Title 16. (5) All fill material used must be nondissolving and nondecomposing. The fill material must not contain organic or inorganic material that would be detrimental to water quality or the existing habitat. (6) The applicant may deposit dredge spoils on the subject property only if part of an approved development on the subject property. (7) The applicant shall stabilize all areas left exposed after clearing and grading activities with native vegetation normally associated with the stream or buffer area.
(Ord. No. 15-797, § 22, 6-16-15.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.