§ 19.145.490 — Development within critical aquifer recharge areas
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.145.490
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/1b930f57-f6ca-4e0a-91be-2b1e6571da4d
19.145.490 Development within critical aquifer recharge areas.
(1) Any proposed development located in critical aquifer recharge areas shall submit a hazardous materials inventory statement with a permit, land use, or business license application. Ongoing operation and maintenance activities of public wells by public water providers are exempt from these requirements. (2) The city will review the hazardous materials inventory statement along with the permit, land use, or business license application to determine whether hazardous materials will be used, stored, transported or disposed of in connection with the proposed activity. The city shall make the following determinations and apply the appropriate capture zone protection measures: (a) No hazardous materials are involved; (b) Hazardous materials are involved; however, existing laws or regulations adequately mitigate any potential impact, and documentation is provided to demonstrate compliance; or (c) Hazardous materials are involved and the proposal has the potential to significantly impact critical aquifer recharge areas. The city may require a hydrogeologic assessment with a critical areas report to be prepared by a qualified professional in order to determine the potential impacts of contamination on the aquifer. The report shall include the following site and proposal-related information: (i) Information regarding geologic and hydrogeologic characteristics of the site, including the surface location of the capture zone in which it is located and the type of infiltration of the site. (ii) Groundwater depth, flow direction, and gradient. (iii) Location of other critical areas, including surface waters, within 200 feet of the site. (iv) Best management practices and integrated pest management proposed to be used, including: (A) Predictive evaluation of groundwater withdrawal effects on nearby wells and surface water features; (B) Predictive evaluation of contaminant transport based on potential releases to groundwater; and (C) Predictive evaluation of changes in the infiltration/recharge rate. (3) A spill containment and response plan may be required to identify equipment and/or structures that could fail, and shall include provisions for inspection as required by the applicable state regulations. (4) A groundwater monitoring plan may be required to monitor quality and quantity of groundwater, surface water runoff, and/or site soils. The city may require the owner of a facility to install one or more groundwater monitoring wells to accommodate the required groundwater monitoring. Criteria used to determine the need for site monitoring shall include, but not be limited to, the proximity of the facility to production or monitoring wells, the type and quantity of hazardous materials on site, and whether or not the hazardous materials are stored in underground vessels. (5) The city may employ an outside consultant at the applicant’s expense for third-party review of the critical areas report, hydrogeologic assessment, the spill containment and response plan, and the groundwater monitoring plan.
(Ord. No. 15-797, § 22, 6-16-15.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.
