19.145.430 Development within wetlands.
(1) Generally. No development or improvement may be located within a wetland except as provided in this section. (2) Development within wetlands. The specific location and extent of development within a wetland must constitute the minimum necessary encroachment as determined through application of mitigation sequencing set forth in FWRC 19.145.130. The city will review and decide upon development within a wetland using process IV in Chapter 19.70 FWRC, based on the following criteria: (a) It will not adversely affect drainage or stormwater retention capabilities; (b) It will not lead to unstable earth conditions nor create erosion hazards; (c) It will not be materially detrimental to any other property in the area of the subject property nor to the city as a whole, including the loss of open space; (d) It will result in no net loss of wetland area, function or value upon completion of compensatory mitigation; (e) The project is in the best interest of the public health, safety or welfare; (f) The applicant has demonstrated sufficient scientific expertise and supervisory capability to carry out the project; and (g) The applicant is committed to monitoring the project and to making corrections if the project fails to meet projected goals. (3) Requirements for compensatory mitigation. Compensatory mitigation shall be used only for impacts that cannot be avoided or minimized and shall achieve equivalent or greater biologic functions. Compensatory mitigation plans shall be consistent with Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans – Version 1 (Ecology Publication No. 06-06-011b or as revised), and Selecting Wetland Mitigation Sites Using a Watershed Approach (Western Washington) (Ecology Publication No. 09-06-32). (4) Mitigation. Acceptable methods to mitigate wetland impacts include creation, re-establishment, rehabilitation, and enhancement of in-kind wetland types within the same drainage basin that results in no net loss of wetland area, function, or value. If approved by the city, the applicant may locate a portion or all of the compensatory mitigation using alternative mitigation including, but not limited to, an approved and certified in-lieu fee program or mitigation bank, and/or advanced mitigation if it is determined that off-site, out-of-basin, and/or out-of-kind mitigation would provide a greater overall benefit to the watershed and not result in adverse impacts to the city’s stormwater management system and/or wildlife habitat. Alternative mitigation methods are discretionary and may become an option following an operating agreement between the city and mitigation receiving area. (a) In-lieu fee. Credits from an in-lieu fee program approved under state and federal rules may be used at the discretion of the city and when all of the following are met: (i) The city determines that it would provide environmentally appropriate compensation for the proposed impacts; (ii) The proposed use of credits is consistent with the terms and conditions of the approved in-lieu fee program instrument; and (iii) The compensatory mitigation agreement occurs in advance of the authorized impacts. (b) Mitigation bank. Credits from a wetland mitigation bank that is certified under state rules may be used at the discretion of the city and when all of the following are met: (i) The city determines that it would provide environmentally appropriate compensation for the proposed impacts; (ii) The proposed use of credits and replacement ratios are consistent with the terms and conditions of the certified bank instrument; and (iii) The compensatory mitigation agreement occurs in advance of the authorized impacts. (c) Advance mitigation. Mitigation for projects with pre-identified impacts to wetlands may be constructed in advance of the impacts at the discretion of the city and if the mitigation is implemented according to federal rules, state policy on advance mitigation, and state water quality regulations. (5) Wetland mitigation ratios. The following are ratios for providing creation, re-establishment, rehabilitation, or enhancement of impacted wetlands. Ratios for rehabilitation and enhancement may be reduced when combined with 1:1 replacement through creation or re-establishment pursuant to Table 1a, Wetland Mitigation in Washington State – Part 1: Agency Policies and Guidance –Version 1 (Ecology Publication No. 06-06-011a, or as revised). Creation, re-establishment, rehabilitation, and enhancement definitions and intent shall be pursuant to Ecology Publication No. 06-06-011a, or as revised. | Category and Type of Wetland | Creation or Re-establishment | Rehabilitation | Enhancement | Category I: High conservation value and bogs | Not considered possible | Case-by-case | Case-by-case | Category I: Mature and old growth forests greater than one acre | 6:1 | 12:1 | 24:1 | Category I: Based on functions | 4:1 | 8:1 | 16:1 | Category II | 3:1 | 6:1 | 12:1 | Category III | 2:1 | 4:1 | 8:1 | Category IV | 1.5:1 | 3:1 | 6:1 Mitigation requirements may also be determined using the credit/debit tool described in Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington: Final Report (Ecology Publication No. 10-06-011, or as revised) if approved by the director. (6) Compensatory mitigation plan. As part of any request under this section, the applicant shall submit a mitigation plan prepared by a qualified professional that includes the following minimum standards: (a) Contents of wetland delineation report identified in FWRC 19.145.410(2). (b) Compensatory mitigation written report and plan sheets. Full guidance on the following report requirements can be found in Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans (Version 1) (Ecology Publication No. 06-06-011b, or as revised): (i) Description of how the project design has been modified to avoid, minimize, or reduce adverse impacts to wetlands; (ii) Description of the existing wetland and buffer areas proposed to be altered. Include acreage, water regime, vegetation, soils, landscape position, surrounding land uses, and functions. Describe impacts in terms of acreage by Cowardin classification, hydrogeomorphic classification, and wetland rating; (iii) Description of the compensatory mitigation site, including location and rationale for selection. Include an assessment of existing condition: acreage of wetlands and uplands, water regime, sources of water, vegetation, soils, landscape position, surrounding land uses, and functions; (iv) Description of the proposed actions for compensation of wetland and upland areas affected by the project. Include overall goals of the proposed mitigation, including a description of the targeted functions, hydrogeomorphic classification, and categories of wetlands; (v) Description of the proposed mitigation construction activities and timing of activities; (vi) Discussion of ongoing management practices that will protect wetlands after the subject property has been developed, including proposed monitoring and maintenance programs; and (vii) Bond estimate for the entire compensatory mitigation project, including the following elements: site preparation, plant materials, construction materials, installation oversight, maintenance twice per year for up to five years, annual monitoring field work and reporting, and contingency action for a maximum of the total required number of years for monitoring. (c) Scaled plan sheets for the compensatory mitigation that contains the following contents: (i) Surveyed edges of the existing wetland and buffer, proposed areas of wetland impacts, location of proposed wetland compensation actions. (ii) Existing and proposed topography measured at two-foot intervals in the proposed compensation area. Existing and proposed cross sections of the proposed compensation area and impact area measured in one-foot intervals. (iii) Surface and subsurface hydrologic conditions, including an analysis of existing and proposed hydrologic regimes for enhanced, created, or restored compensatory mitigation areas. Illustrations of how data for existing hydrologic conditions were used to determine the estimates of future hydrologic conditions. (iv) Conditions expected from the proposed actions on site, including hydrogeomorphic types, vegetation community types by dominant species (wetland and upland), and future water regimes. (v) Required wetland buffers for existing wetlands and proposed compensation areas. (vi) Plant schedule for compensation area, including all species by proposed community type and water regime, size and type of plant material to be installed, spacing of plants, typical clustering patterns, total number of each species by community type, and timing of installation. (vii) Performance standards that provide measurable benchmarks reflective of years post-installation for upland and wetland communities, monitoring schedule, and maintenance schedule. (d) Alternative mitigation plans (in-lieu fee, mitigation banks, and advanced mitigation) shall provide items (6)(a), (b)(i) and (ii) from this section, responses to subsection (4)(a), (b), or (c) of this section, and any other information deemed necessary by the city to adequately consider the alternative mitigation proposal. (7) Monitoring. Mitigation monitoring shall be required for a minimum of five years to establish that performance standards have been met. The mitigation plan shall include monitoring elements that ensure certainty of success for the proposal’s natural resource values and functions. The applicant remains responsible for restoration of the natural resource values and functions if the mitigation goals are not obtained with the five-year monitoring period. Additional monitoring and corrective actions may be required by the director in order to meet goals within the approved mitigation plan.
(Ord. No. 15-797, § 22, 6-16-15.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.