For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19.240.095 — Emergency housing and shelter

Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.240.095

Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/108e43a5-b801-4145-8990-479867d4120e

19.240.095 Emergency housing and shelter.

The following uses shall be permitted in the commercial enterprise (CE) zone subject to the regulations and notes set forth in this section: | USE | REGULATIONS | USE ZONE CHART DIRECTIONS: FIRST, read down to find use . . . THEN, across for REGULATIONS | Required Review Process | Minimums | Maximum Height of Structure(s) | Required Parking Spaces | SPECIAL REGULATIONS AND NOTES | Lot Size | Required Yards | Front | Side (each) | Rear | ⇩ | ⇨ | Emergency housing and shelter | Process III See note 15 | None | 5 ft. | See notes 1 and 2 | 45 ft. above average building elevation (AABE) to 55 ft. AABE See notes 3 and 4 | See notes 10, 11 and 14 | 1. Minimum side and rear yards shall be 20 ft. adjacent to single-family residential zones and five ft. adjacent to all other zones. 2. The city may permit this use only if: a. The proposed emergency housing and shelter is distanced at least 1,000 ft. from: i. Any other emergency housing and shelter; or ii. Public schools; As measured from the nearest points of each such property. b. The facility and program secure and maintain all licenses and/or approvals as required by the state. c. The property is situated proximate to, and has convenient access to, public transportation, shopping, health care providers, and other services and facilities frequently utilized by the residents of the property. d. The facility will be operated under the authority of a reputable governing board, social service, or government agency, or proprietor, to whom staff are responsible and who will be available to city officials, if necessary, to resolve concerns pertaining to the facility. e. The facility will have staffing, supervision, and security arrangements appropriate to the number of residents and to its hours of operation. f. The facility will not create unreasonable impacts on traffic, public utilities and services or on nearby residences. g. The facility is in compliance with applicable health, fire, building, and safety requirements. h. The housing will operate under a written community engagement plan, approved by the governing agency, board, or official, which must address, at a minimum: (i) how the facility will engage with the community; (ii) how the facility will respond to community complaints or concerns; and (iii) who is the point of contact for the community. The plan shall be provided to the city prior to occupancy and shall be updated and provided to the city as substantive changes are made to the plan. (Continued on next page) | See note 3 | | | | | | | For other information about parking and parking areas, see Chapter 19.130 FWRC. For details of what may exceed this height limit, see FWRC 19.110.050 et seq. For details regarding required yards, see FWRC 19.125.160 et seq. | Process I, II, III and IV are described in Chapter 19.55 FWRC, Chapter 19.60 FWRC, Chapter 19.65 FWRC, Chapter 19.70 FWRC respectively. | | | | | | | | | | | | | | | | | | | | | USE | REGULATIONS | USE ZONE CHART DIRECTIONS: FIRST, read down to find use . . . THEN, across for REGULATIONS | Required Review Process | Minimums | Maximum Height of Structure(s) | Required Parking Spaces | SPECIAL REGULATIONS AND NOTES | Lot Size | Required Yards | Front | Side (each) | Rear | ⇩ | ⇨ | | | | | | | 3. If approved by the director, the height of a structure may exceed 40 ft. above average building elevation (AABE), to a maximum of 55 ft. AABE and four floors, if all of the following criteria are met: a. The increased height is necessary to accommodate the structural, equipment, or operational needs of the use conducted in the building, and/or all ground floor spaces have a minimum floor-to-ceiling height of 13 ft. and a minimum depth of 15 ft.; b. Height also complies with note 4; c. Height over 40 ft. is set back from nonresidential zones by one additional ft. for each one ft. of height over 40 ft.; and d. Rooflines are designed to avoid a predominantly flat and featureless appearance through variations in roof height, forms, angles, and materials. 4. Building height may not exceed 30 ft. AABE when located within 100 ft. of a single-family residential zone. 5. No maximum lot coverage is established. Instead, the buildable area will be determined by other site development requirements, i.e., required buffers, parking lot landscaping, surface water facilities, etc. 6. For community design guidelines that apply to the project, see Chapter 19.115 FWRC. 7. For landscaping requirements that apply to the project, see Chapter 19.125 FWRC. 8. For sign requirements that apply to the project, see Chapter 19.140 FWRC. 9. Refer to Chapter 19.265 FWRC to determine what other provisions of this title may apply to the subject property. 10. Parking spaces shall be provided as follows: Efficiency units – 1.0 per unit + one per two employees Studio units – 1.25 per unit + one per two employees One bedroom units – 1.5 per unit + one per two employees Dwelling units with two bedrooms or more – 2.0 per unit + one per two employees 11. Alternatively, an applicant may choose to submit a parking study in accordance with FWRC 19.130.080(2). (Continued on next page) | | | | | | | For other information about parking and parking areas, see Chapter 19.130 FWRC. For details of what may exceed this height limit, see FWRC 19.110.050 et seq. For details regarding required yards, see FWRC 19.125.160 et seq. | Process I, II, III and IV are described in Chapter 19.55 FWRC, Chapter 19.60 FWRC, Chapter 19.65 FWRC, Chapter 19.70 FWRC respectively. | | | | | | | | | | | | | | | | | | | | | USE | REGULATIONS | USE ZONE CHART DIRECTIONS: FIRST, read down to find use . . . THEN, across for REGULATIONS | Required Review Process | Minimums | Maximum Height of Structure(s) | Required Parking Spaces | SPECIAL REGULATIONS AND NOTES | Lot Size | Required Yards | Front | Side (each) | Rear | ⇩ | ⇨ | | | | | | | 12. The housing will operate under a written operational plan that will include, at a minimum, the following: a. Residents must be referred by providers of housing and services for people experiencing homelessness. Direct intake of residents at the site, without prior referral, is not allowed. b. A description of transit, pedestrian and bicycle access from the subject site to services and schools must be provided to residents. c. An operations plan must be provided that addresses the following elements: i. Roles and responsibilities of key staff; ii. Site/facility management, including a security and emergency plan; iii. Site/facility maintenance; iv. Occupancy policies, consistent with Chapter 59.18 RCW, including resident responsibilities and a code of conduct that includes, at a minimum, a prohibition on threatening and unsafe behavior; and the on-site use and sale of illegal drugs; v. Access to human and social services, including a staffing plan and expected outcome measures; vi. Procedures for maintaining accurate and complete records. d. Providers and/or managing agencies shall have either a demonstrated experience providing similar services to people experiencing homelessness, and/or certifications or academic credentials in an applicable human service field, and/or applicable experience in a related program with people experiencing homelessness. e. For health and safety reasons, the sponsor and/or managing agency shall take all reasonable and legal steps to obtain verifiable identification information, including full name and date of birth, from current and prospective residents, and shall keep a log containing this information. f. Should the provider become aware of a current or prospective resident who has an active felony warrant, it shall follow a protocol to work with the participant to resolve any outstanding warrants with applicable legal authorities. 13. All facilities are required to be licensed pursuant to the provisions of Chapter 12.35 FWRC, unless operated as a result of inclement weather, natural disaster, or similar event. 14. Minimum residential parking requirements subject to FWRC 19.130.020. 15. Emergency housing and shelter that is operated as a result of inclement weather, natural disaster, or similar event is processed as a Class III temporary use pursuant to Chapter 19.275 FWRC. | | | | | | | For other information about parking and parking areas, see Chapter 19.130 FWRC. For details of what may exceed this height limit, see FWRC 19.110.050 et seq. For details regarding required yards, see FWRC 19.125.160 et seq. | Process I, II, III and IV are described in Chapter 19.55 FWRC, Chapter 19.60 FWRC, Chapter 19.65 FWRC, Chapter 19.70 FWRC respectively. | | | | | | | | | | | | | | | | | | | |

(Ord. No. 25-1008, § 22, 4-1-25; Ord. No. 23-949, § 37, 2-7-23; Ord. No. 22-929, § 14, 1-18-22; Ord. No. 21-921, § 28, 10-19-21.)

Ask a question about Federal Way law

Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.