Chapter 12.06 — Electric Energy – Regulations and Rates

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)), Tacoma, WA · 40 sections. Independent public-information project, not the official City of Tacoma website.

  1. § 12.06.010 — General application
  2. § 12.06.020 — Definitions
  3. § 12.06.030 — Available voltages
  4. § 12.06.040 — Application for service and contract
  5. § 12.06.050 — Inspection
  6. § 12.06.060 — Equipment and wires
  7. § 12.06.070 — Rearranging lines or equipment
  8. § 12.06.080 — Metering
  9. § 12.06.090 — Connected load
  10. § 12.06.100 — Deposits and connection charges
  11. § 12.06.110 — Billing – Payment of bills and delinquency
  12. § 12.06.115 — Disconnection of electric service
  13. § 12.06.120 — Resale of electric energy prohibited
  14. § 12.06.130 — Diversion of current
  15. § 12.06.140 — Tampering and injury to City equipment
  16. § 12.06.150 — City not liable for damages
  17. § 12.06.160 — Residential service – Schedule A-1
  18. § 12.06.165 — Low-income senior and/or low-income disabled discount residential service – Schedule A-2
  19. § 12.06.166 — Prepaid residential service – Schedule PR
  20. § 12.06.170 — Small general service – Schedule B
  21. § 12.06.176 — Prepaid small general service – Schedule PB
  22. § 12.06.215 — General service – Schedule G
  23. § 12.06.225 — High voltage general service – Schedule HVG
  24. § 12.06.260 — Contract industrial service – Schedule CP
  25. § 12.06.265 — New large load service under 10 aMW – Schedule NLL
  26. § 12.06.266 — Very large load service of 10 aMW or more– Schedule VLL
  27. § 12.06.290 — Street lighting and traffic signal service – Schedule H-1
  28. § 12.06.295 — Street lighting service – Schedule H-3
  29. § 12.06.300 — Private off-street lighting service – Schedule H-2
  30. § 12.06.310 — Power factor provisions – Schedule P
  31. § 12.06.314 — Tax credit – Schedule TC
  32. § 12.06.320 — Additional rules may be made by director
  33. § 12.06.330 — Customer service policies – Additional rules and regulations
  34. § 12.06.340 — Violations – Penalties – Enforcement
  35. § 12.06.350 — Severability
  36. § 12.06.370 — Renewable energy program
  37. § 12.06.371 — Electric vehicle fast charge – Schedule FC. Effective, 2019-01-01 to 2031-12-31
  38. § 12.06.372 — Shore power – Schedule SP
  39. § 12.06.373 — Electrofuel service pilot – Schedule EF
  40. § 12.06.374 — Electric vehicle public charging provided by Tacoma Power – Schedule EVPC