Chapter 12.06 — Electric Energy – Regulations and Rates
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)), Tacoma, WA · 40 sections. Independent public-information project, not the official City of Tacoma website.
- § 12.06.010 — General application
- § 12.06.020 — Definitions
- § 12.06.030 — Available voltages
- § 12.06.040 — Application for service and contract
- § 12.06.050 — Inspection
- § 12.06.060 — Equipment and wires
- § 12.06.070 — Rearranging lines or equipment
- § 12.06.080 — Metering
- § 12.06.090 — Connected load
- § 12.06.100 — Deposits and connection charges
- § 12.06.110 — Billing – Payment of bills and delinquency
- § 12.06.115 — Disconnection of electric service
- § 12.06.120 — Resale of electric energy prohibited
- § 12.06.130 — Diversion of current
- § 12.06.140 — Tampering and injury to City equipment
- § 12.06.150 — City not liable for damages
- § 12.06.160 — Residential service – Schedule A-1
- § 12.06.165 — Low-income senior and/or low-income disabled discount residential service – Schedule A-2
- § 12.06.166 — Prepaid residential service – Schedule PR
- § 12.06.170 — Small general service – Schedule B
- § 12.06.176 — Prepaid small general service – Schedule PB
- § 12.06.215 — General service – Schedule G
- § 12.06.225 — High voltage general service – Schedule HVG
- § 12.06.260 — Contract industrial service – Schedule CP
- § 12.06.265 — New large load service under 10 aMW – Schedule NLL
- § 12.06.266 — Very large load service of 10 aMW or more– Schedule VLL
- § 12.06.290 — Street lighting and traffic signal service – Schedule H-1
- § 12.06.295 — Street lighting service – Schedule H-3
- § 12.06.300 — Private off-street lighting service – Schedule H-2
- § 12.06.310 — Power factor provisions – Schedule P
- § 12.06.314 — Tax credit – Schedule TC
- § 12.06.320 — Additional rules may be made by director
- § 12.06.330 — Customer service policies – Additional rules and regulations
- § 12.06.340 — Violations – Penalties – Enforcement
- § 12.06.350 — Severability
- § 12.06.370 — Renewable energy program
- § 12.06.371 — Electric vehicle fast charge – Schedule FC. Effective, 2019-01-01 to 2031-12-31
- § 12.06.372 — Shore power – Schedule SP
- § 12.06.373 — Electrofuel service pilot – Schedule EF
- § 12.06.374 — Electric vehicle public charging provided by Tacoma Power – Schedule EVPC
