For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.06.040 — Application for service and contract

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.06.040

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/0baf7bff-8f29-4fa7-9274-0b72f9fcaab7

§ 12.06.040: Application for service and contract.

A. Any person desiring to purchase electric energy from Tacoma Power shall make such request of the Department. Such request shall contain a description of the premises where such electric energy is desired and shall state whether the electric energy is to be used for lighting, cooking, heating, or power and shall constitute a consent to accept this electric supply subject to the general provisions and service policies of Tacoma Power, in force or thereafter adopted. The purchase and connection of electric energy shall be subject to the residential building and/or commercial building (that is proposed to be connected) complying with the energy efficiency standards as referenced in subsection D below. The connection of the applicant's premises by Tacoma Power to its electrical distribution system shall constitute acceptance of the request for service and shall be regarded as establishing the contractual obligations between the applicant and Tacoma Power. B. The rate designation for the service applied for shall be made by the Department and such classification shall be governed by the provisions of this chapter. Where optional schedules are available for the service to be rendered, the customer shall designate in writing the desired available option. A change to a different method of billing shall not be made effective until the next regular billing day after notice has been received by the Department. The Department shall have the right to restrict service to the premises to only one single-phase service and one three-phase service. C. The requirements for electrical service equipment and the supply of electric power for service to large industrial users and the distributors of wholesale power to the ultimate consumer are such that special consideration must be given when the load is to be increased or a new demand for large use is in prospect. These services are offered at compatible rates under the terms of a written contract. D. The furnishing of electric energy for: (1) new residential buildings, proposed to use electrical space heating; (2) new commercial buildings that are proposed to use electric space conditioning and/or electric lighting; and (3) conversions of residential or commercial buildings to electric space heating or electric space conditioning and/or electric lighting, respectively, is contingent upon and subject to said residential and/or commercial building satisfying the energy efficiency standards established by the Washington State Energy Code WAC 51-11, as adopted and amended in Chapter 2.10 of the Tacoma Municipal Code as the Official Energy Code for the City of Tacoma, except for application to existing buildings undergoing conversion to provide for electric space heating or conditioning, the 1983 Northwest Conservation and Electrical Power Plan, Appendix L. Copies of said Plan and Code are on file with the City Clerk and are incorporated herein by this reference. Existing exterior building and area lighting and existing exterior sign lighting shall be required to meet the lighting control requirements of the Tacoma Energy Code within six months of notification by the City of Tacoma.

( Ord. 19320 § 2, 1971-04-06 ; Ord. 23166 § 1, 1984-05-22 ; Ord. 25523 § 1, 1994-06-14 ; Ord. 26795 § 5, 2001-04-03 ; Ord. 26848 § 2, 2001-09-18 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.