§ 12.06.090 — Connected load

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.06.090

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/5c77cd87-f48f-4a09-a323-917077385397

§ 12.06.090: Connected load.

When connected load is used in connection with any rate schedule, the estimated connected load as shown on customer's application shall be used for billing purposes until such time as the Department shall have made a load check. The Department may recheck a customer's connected load at any time it may deem desirable. A check of connected load will be made at the request of the customer providing six months have elapsed since the previous request for check was made. A change in billing demand, when a change is made in connected load will be made only after load check or inspection shall have been made of customer's equipment.

( Ord. 19320 § 2, 1971-04-06 )