For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.08C.410 — Industrial wastewater discharge permit contents

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.08C.410

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/f0776b20-2e98-4e21-ac4b-60644165e622

§ 12.08C.410: Industrial wastewater discharge permit contents.

A. Industrial wastewater discharge permits shall include conditions deemed necessary by the Control Authority to prevent pass through or interference, protect the quality of the water body receiving the treatment plant’s effluent, protect worker health and safety, protect against damage to the POTW, and satisfy the requirements of this chapter. B. Industrial wastewater discharge permits issued to significant industrial users and categorical industrial users shall contain all the conditions and information set forth below in TMC §§ 12.08C.410B.1 through B.10; provided that, control mechanisms issued to other industrial users may contain some or all of the same conditions, as determined by the Control Authority to ensure compliance with this chapter: 1. The industrial wastewater discharge permit issuance date, expiration date, and effective date; 2. The legal name, and trade name if any, and address for corporate offices of the owner(s) and operator(s); 3. The name and contact information of the duly authorized representative of the industrial user, the mailing address at which such representative may receive notice(s) from the Control Authority, and the name and contact information for the facility manager, if different than the duly authorized representative of the industrial user; 4. A statement that the industrial wastewater discharge permit is nontransferable without prior notification to and approval by the Control Authority in accordance with TMC § 12.08C.430, and provisions for furnishing the new owner or operator with a copy of the existing industrial wastewater discharge permit; 5. A statement that the permittee facility is subject at reasonable times to inspections and gathering of samples by the Control Authority to determine whether an industrial user is complying with the requirements of this chapter and any industrial wastewater discharge permit or other control mechanism issued thereunder; 6. Effluent limits and best management practices based on applicable pretreatment standards and pretreatment requirements; 7. Self-monitoring, sampling, reporting, notification, and recordkeeping. These requirements shall, at a minimum include the pollutants to be monitored, sampling locations and sampling frequency, the sample type required to be monitored under this chapter, types of reports and when they are due, and the various notifications and when they are required; 8. A statement of applicable enforcement remedies for violating the conditions in the industrial wastewater discharge permit, including pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, and local law; 9. Requirements to control slug discharges, including developing, updating, and implementing slug discharge control plans if determined by the Control Authority to be necessary; and 10. Reapplication requirements. C. Industrial wastewater discharge permits may, as determined by the Control Authority, contain the following additional conditions: 1. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; 2. Requirements to install and maintain pretreatment facilities and technology, pollution control, including requirements to use best management practices to prevent accidental, unanticipated, or non-routine discharges, and construction of appropriate containment devices designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW; 3. Requirements to develop and implement waste minimization plans to reduce the amount of pollutants discharged to the POTW; 4. Requirements to pay rates and fees for wastewater discharged to, and managed and treated by the POTW; 5. Requirements to install and maintain inspection and sampling facilities and equipment, including flow measurement devices, and provide access to the Control Authority to conduct inspections and sampling at reasonable times; 6. A statement that compliance with the industrial wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, and local limits, including those which become effective during the term of the industrial wastewater discharge permit; and 7. Other conditions determined by the Control Authority to ensure compliance with this chapter, including regulations issued by the Control Authority pursuant to this chapter, and applicable requirements set forth in federal and state laws and regulations.

( Ord. 28761 Ex. C, 2021-05-25 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.