For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.08C.420 — Industrial wastewater discharge permit modification

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.08C.420

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/054824ec-88fa-424c-b912-bb2a330f3031

§ 12.08C.420: Industrial wastewater discharge permit modification.

A. The Control Authority may amend any industrial wastewater discharge permit for good cause, including, but not limited to the following reasons: 1. To incorporate any new or revised federal, state, or local pretreatment standards or requirements; 2. To address significant alterations or additions to the industrial user’s operation, processes, or wastewater volume or character after the industrial user’s industrial wastewater discharge permit is issued; 3. To address a change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; 4. To respond to information indicating that a permitted discharge poses a threat to the health and safety of POTW personnel and the public, and/or receiving waters; 5. In response to a violation(s) of any term or condition of an industrial wastewater discharge permit; 6. When an industrial user misrepresents or fails to fully disclose all relevant facts in the industrial wastewater discharge permit application, or in any report required under this chapter; 7. When there is a revision of, or a variance is granted from, categorical pretreatment standards pursuant to 40 CFR 403.13; 8. When there has been a change in the legal or trade name of the industrial user, the duly authorized representative of the industrial user, or the name of the facility manager, and the permittee has submitted a request for a modification of the permit; 9. To correct typographical or other errors in the industrial wastewater discharge permit; and 10. To reflect an approved transfer of the facility ownership or operation to a new owner or operator. B. The industrial user shall file a written request for a modification of an industrial wastewater discharge permit whenever there has been a change in the legal name or trade name of the industrial user or a change in the name or mailing address of the duly authorized representative or the industrial user or facility manager. The request shall be submitted to the Control Authority as soon as practicable but no later than 60 days following implementation of the change. A permit will be non-transferable and subject to revocation if such request is not timely filed.

( Ord. 28761 Ex. C, 2021-05-25 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.