§ 13.11.210: Activities allowed with staff review.
A. Purpose. The purpose of this section is to allow City staff review to determine whether potential impacts to a critical area, buffer, management area, or setback may occur, without requiring a critical area permit. The staff review will ensure the activity meets the specific criteria below. B. The following activities require review by City staff. Review and authorization may occur over-the-counter or staff may issue a letter of approval with conditions. Additional information and studies may be requested. Activities must comply with the protective standards of this chapter and provisions of other local, state, and federal laws. Any incidental damage to, or alteration of, a critical area shall be restored or replaced at the responsible party’s expense. 1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or welfare or pose an immediate risk of damage to private property and that require remedial or preventative action in a timeframe too short to allow for normal processing. Emergency actions that create an impact to a critical area or its buffer shall use best management practices to address the emergency and, in addition, the action must have the least possible impact to the critical area or its buffer. The person or agency undertaking such action shall notify the City within one (1) working day following the commencement of the emergency activity. The City shall determine if the action taken was within the scope of an emergency action and following that determination, may require the action to be processed in accordance with all provisions of this chapter including the application of appropriate permits within thirty (30) days of the impact. The emergency exemption may be rescinded at any time upon the determination by the City that the action was not, or is no longer necessary. After the emergency, the person or agency undertaking the action shall fully fund and conduct necessary mitigative actions including, but not limited to, restoration and rehabilitation or other appropriate mitigation for any impacts to the critical area and buffers resulting from the emergency action in accordance with an approved mitigation plan. All mitigation activities must take place within one (1) year following the emergency action and impact to the critical area, or within a timeframe approved by the City and reflected within an approved schedule. Monitoring will be required as specified in the General Mitigation Requirements (Section 13.11.270). 2. Maintenance and repair of legally existing utilities, roads, structures, or facilities used in the service of the public may occur following review where alteration of the critical area or buffer is unavoidable. All activities must be in compliance with the current City Stormwater Management Manual and Regional Road Maintenance Manual and provide all known and reasonable protection methods for the critical area and shall not expand further into the critical area. 3. Category IV wetlands that have been classified and identified as having a total cumulative area of less than 1,000 square feet, regardless of property lines, are not subject to the avoidance and minimization requirements of the mitigation sequence (TMC § 13.11.270), are exempt from the buffer requirements of the chapter, and they may be filled provided the following criteria are met: a. Are of low habitat function (habitat score less than six points using the wetland rating system per TMC § 13.11.310). b. Are not part of riparian areas or their buffers. c. Are not part of a mosaic wetland system (TMC § 13.01.110M), unless the entire mosaic wetland system meets the other criteria in this subsection. d. Are not associated with a shoreline of the state or their associated buffer. e. Are not associated with a FWHCA. f. Impacts from any fill are fully mitigated based on remaining actions in TMC § 13.11.270F.3 through F.6. and g. Any wetland fill would also require federal and/or state permits consistent with TMC § 13.11.140. 4. Geotechnical investigation activities may be performed, provided that an access plan, protection measures, best management practices, and restoration are utilized to protect and maintain the critical area where possible. These items must be included with the application. 5. Reconstruction or exterior remodeling, of existing structures and accessory structures provided that disturbance of native vegetation is kept to a minimum and any vegetation that is disturbed shall be replaced. This shall not apply to reconstruction which is proposed as a result of structural damage associated with a critical area, such as slope failure in a landslide hazard area or flooding in a flood hazard area. 6. One-time expansion of existing structures and accessory structures, provided that expansion of the developed footprint within the critical area or buffer does not increase by more than 25 percent and that the new construction or related use extends away from the critical area; keeps disturbance of native vegetation to a minimum; and replaces native vegetation that may be disturbed This expansion may also occur in a direction parallel to the critical area if the expansion takes place upon existing impervious surfaces. A Notice on Title must be recorded to be eligible for staff review and approval. 7. Maintenance and repair of existing retaining walls and bioengineered stabilization measures designed to protect property from erosion. 8. Interrupted buffers. a. Where a legally established, pre-existing use of the buffer of a wetland, stream, or FWHCA exists, those proposed activities that are within the buffer but are separated from the remaining critical area by a permanent substantial improvement, or are located in an existing permanent substantial improvement, may be allowed provided that the detrimental impact to the critical area does not increase. "Interrupted" means that the substantial improvement blocks the protective measures provided by a buffer. Substantial improvements may include developed public infrastructure (roads, railroads, dikes, and levees) and buildings. Substantial improvements may not include paved trails, sidewalks, parking areas, or bulkheads. The Director shall evaluate whether the interruption will affect the entirety of the buffer. Individual structures may not fully interrupt the buffer function. In such cases, the allowable buffer exclusion should be limited in scope to just the portion of the buffer that is affected. Review may require a functional analysis report for the type of critical area buffer that is affected. In determining whether a functional analysis is necessary, the City shall consider the hydrologic, geologic, and/or biological habitat connection potential and the extent and permanence of the interruption. 9. Construction of pedestrian trails within the buffer of a Critical Area, or within a Biodiversity Area or Habitat Corridor is permitted, subject to the following criteria: a. The trail is constructed of pervious material such as bark chip or equivalent. b. The trail and associated clearing shall be no more than the minimum width that complies with the Americans with Disabilities Act (ADA)[1]. c. The trail does not cross or alter any regulated drainage features or waters of the state. d. The trail shall be located within the outer quarter (1/4) edge of the buffer, where possible, with the exception for limited viewing platforms. e. The trail system discourages pedestrians from using informal trails that are not part of the designated trail system. f. The trail alignment and design minimize tree and vegetation removal and avoid disturbance to priority species and priority habitat. Trails constructed in Biodiversity Areas or Habitat Corridors shall avoid the most sensitive areas and species and must maintain a contiguous and unfragmented corridor for wildlife movement. Expansion of existing trail systems must demonstrate that the expansion will not result in additional disruption of wildlife movement and will avoid the most sensitive areas and species. g. Low impact trails shall not be later widened or upgraded to impervious trails that encourage activities with greater impacts without additional review and required permitting. h. Informational signs are required at trail heads, at a minimum, and are subject to City approval. i. Co-location of minor accessory utilities with pedestrian trails may be allowed so long as all other criteria of this section are met. 10. Voluntary enhancement or restoration of a critical area or buffer that exceeds the provisions above in § 13.11.200B.6, 7, or 8 may be allowed if the activity meets the requirements of this section. a. Individual projects. (1) Enhancement activities shall be limited to planting native vegetation, controlling noxious and invasive species and providing minor habitat structures such as nest boxes. (2) Activities shall not include grading or water control structures. (3) A planting plan containing information on vegetation species, quantities, and general location of planting areas including the identification of wetlands, streams, and their buffers, is required for review. (4) Proper erosion control measures are provided. (5) If equipment, other than hand-held equipment is utilized, list the type of equipment, methods and best management practices to prevent unnecessary impacts. b. Community projects. Multi-party projects are encouraged. These projects shall not include new destination facilities or high-intensity recreation facilities as described in § 13.06.080L. The applicants may propose a programmatic approach pertaining to multiple sites and on-going restoration and enhancement activities as well as maintenance. A City approved habitat management template or equivalent must be provided that has been reviewed and approved by all property owners. In addition, the project is subject to the following: (1) The primary focus is preservation and increase in biological functions through the preservation and improvement of habitat, species diversity and natural features. (2) Preserves and connects critical areas. (3) Includes goals, objectives, and measurable performance standards. (4) Includes a monitoring plan and contingency plan. (5) Trails shall comply with the provisions in § 13.11.210B.9. (6) Buildings and paved surfaces shall be located outside of wetlands and streams and their buffers. When located in a Biodiversity Area/Corridor, buildings or paved surfaces must be located in the least sensitive area and must maintain a contiguous and unfragmented corridor for wildlife passage. (7) Picnic tables, benches, and signage are allowed when they are located to avoid and minimize impacts. (8) A maintenance plan that describes the proper techniques and methods used for on-going maintenance and preservation. The plan should address maintenance of any buildings and improvements such as picnic areas, as well as restoration and enhancement areas. (9) The identification of a trained habitat steward who will be responsible for overseeing volunteers, employees, and/or contractors for all aspects of the project. 11. Hazard trees. The removal of hazard trees from the critical area or buffer/setback that are posing a threat to public safety, or posing an imminent risk of damage to an existing structure, public or private road or sidewalk, or other permanent improvement, may be allowed following City staff review, or provided that a report from a certified arborist, landscape architect or professional forester is submitted to the City for review and approval. The report must include an evaluation for tree stabilization potential and removal techniques for the hazard tree and procedures for protecting the surrounding critical area and replacement of native trees. Where possible, the hazard tree shall be left as a standing snag and the cut portions shall be left within the critical area as habitat unless removal is warranted due to fire hazard, disease, or pest control. 12. Tree pruning. Tree pruning may be allowed provided a report from a qualified professional(s) is submitted to the City for review and approval. The report must detail the proposed work, compliance with ANSI standards and best management practices, and include an analysis that concludes the pruning will not result in long-term damage or degradation of tree health. A functional impact analysis from a qualified professional evaluating the functions of the critical area as a result of the pruning may be required. No topping, complete removal or significant impacts to the health of the tree or to the critical area/buffer shall be allowed. 13. Watershed restoration projects that conform to the provisions of RCW 89.08.460 shall be reviewed without fee and approved within 45 days per RCW 89.08.490. 14. Fish habitat enhancement projects that conform to the provision of RCW 77.55.181 shall be reviewed without fee and comments provided as specified in RCW 77.55.181. 15. Demolition of structures. 16. Building setback reduction. A minor reduction of the standard building setback (TMC § 13.11.250B) to a minimum of five feet may be permitted if adequate protection of the buffer will be maintained as documented by a qualified professional in a critical areas report. 17. Buffer vegetation planting as required by TMC § 13.11.270J. 18. Individual Oregon white oak (OWO). Limited development within the critical root zone or drip line/extent of canopy of individually regulated Oregon white oak may be allowed when all of the following are met: a. Development consists of at-grade structures such as roads, sidewalks, walkways, driveways or parking areas. b. The development avoids and minimizes disturbance to the maximum extent feasible. c. Development and construction impacts are limited to the outer 25 percent of the critical root zone or extent of canopy, whichever is greater. d. A report by a qualified professional is provided that includes an analysis of the impacts the proposed development would have the OWO, best management practices to minimize impacts, and concludes that no significant impacts to OWO health would occur.
( Ord. 27294 § 2, 2004-11-16 ; Ord. 27431 § 23, 2005-11-15 ; Ord. 27728 Ex. A, 2008-07-01 ; Ord. 28070 Ex. B, 2012-05-08 ; Ord. 28230 Ex. F, 2014-07-22 ; Ord. 28335 Ex. A, 2015-12-01 ; Ord. 28336 Ex. C, 2015-12-01 ; Ord. 28376 Ex. E, 2016-08-16 ; Ord. 28518 Ex. 5, 2018-06-26 ; Ord. 28725 Ex. A, 2020-12-08 ; Ord. 29114 , 2026-07-14 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.