§ 13.11.230 — Application submittal requirements
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 13.11.230
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/ef2b9b2e-f667-4d98-8641-ced371608d80
§ 13.11.230: Application submittal requirements.
A. The purpose of information submittal and review is to require a level of study sufficient to protect critical areas and/or the public from hazards. All information submitted shall be reviewed as to its validity and may be rejected as incomplete or incorrect. Additional information or electronic copies of all information may be requested for review and to ensure compliance. The Director may, at the applicant’s expense, obtain peer review services from a qualified professional. B. The following items are required for permit review and approval, where applicable depending upon the critical area, the project and permit type, and as determined necessary by City staff. 1. A Joint Aquatic Resource Permit Application and vicinity map for the project. 2. A surveyed site plan that includes the following: a. Parcel line(s), north arrow, scale and two foot contours. b. Location and square footage for existing and proposed site improvements including, utilities, stormwater and drainage facilities, construction and clearing limits, and off-site improvements. Include the amounts and specifications for all draining, excavation, filling, grading or dredging. c. The location and specifications of barrier fencing, silt fencing and other erosion control measures. d. Base flood elevation, floodplain type and boundary and floodways, if site is within a floodplain. e. Critical Areas including all surveyed, delineated wetland boundaries, and the ordinary high water mark of any stream and their buffers, and all Fish and Wildlife Conservation Areas (FWHCA), and any FWHCA Management Areas, as well as floodplain boundary, and top and toe of slopes related to geologically hazardous areas. Critical areas and buffers may be documented with a professional survey or an equivalent professional method using GPS with sub-meter accuracy. The allowance for the use of GPS in preliminary FWHCA, wetland, and stream delineations during the permit process does not preclude the City's ability to require the critical area to be documented with a professional survey for purposes of verifying buffer distances from structures and critical area boundaries associated with development approvals, or other applicable requirements such as Notice on Title. f. The square footage of the existing critical areas and buffers located on-site and the location and square footage of any impacted areas. g. Locations of all data collection points used for the field delineation and general location of off-site critical areas and any buffer that extends onto the project site. Include location and dominant species for significantly vegetated areas and general location for habitat types. h. The location and square footage of impact areas, mitigation areas and remaining critical areas and buffers, setbacks and/or management areas; including areas proposed for buffer modification. 3. Critical Areas report prepared by a qualified professional as defined in § 13.01.110Q. The analysis shall be commensurate with the sensitivity of the critical area, relative to the scale of potential impacts and consistent with best available science. Critical Areas reports are valid for no more than five years, unless verification by a qualified professional can demonstrate that no substantial changes have occurred to the critical area. The report must include the following where appropriate: a. Delineation, characterization and square footage for critical areas on or within 300 feet of the project area and proposed buffer(s). Delineation and characterization is based on the entire critical area. The review distance may be expanded for priority species. When a critical area is located or extends off-site and cannot be accessed, estimate off-site conditions using the best available information and appropriate methodologies. (1) Wetland Delineations will be conducted in accordance with the approved federal manual and applicable regional supplements. (2) The wetland characterization shall include physical, chemical, and biological processes performed as well as aesthetic, and economic values and must use a method recognized by local or state agencies. Include hydrogeomorphic and Cowardin wetland type. (3) Ordinary high water mark determination shall be in accordance with the National Ordinary High Water Mark Field Determination Manual for Rivers and Streams by the U.S. Army Engineer Research and Development Center (ERDC/CRREL TR-25-1), Determining the Ordinary High Water Mark for Shoreline Management Act Compliance in Washington State (Ecology Publication 16-06-029), or other agency approved methodology. (4) Priority species and habitat identification shall be prepared according to professional standards and guidance from the Washington Department of Fish and Wildlife. Depending on the type of priority species, the review area may extend beyond 300 feet. b. Field data sheets for all fieldwork performed on the site. The field assessment shall identify habitat elements, rare plant species, hydrologic information including inlet/outlets, water depths, and hydro-period patterns based on visual cues, and/or staff/crest gage data. c. Provide a detailed description of the project proposal including off-site improvements. Include alterations of ground or surface water flow, clearing and grading, construction techniques, materials and equipment, and best management practices to reduce temporary impacts. d. Assess potential direct and indirect physical, biological, and chemical impacts as a result of the proposal. Provide the square footage for the area of impact with the analysis. The evaluation must consider cumulative impacts. e. Identification of priority species/habitats and any potential impacts. Incorporate Washington State Department of Fish and Wildlife and/or US Department of Fish and Wildlife management recommendations where applicable. When required, plan shall include at a minimum the following: (1) Special management recommendations which have been incorporated and any other mitigation measures to minimize or avoid impacts, including design considerations such as reducing impacts from noise and light. (2) Ongoing management practices which will protect the priority species and/or habitat after development, including monitoring and maintenance programs. f. A hydrologic report or narrative demonstrating that pre and post development flows to wetlands and streams will be maintained. Demonstrating compliance with the City of Tacoma Stormwater Management Manual can be used to satisfy this requirement. g. Runoff from pollution generating surfaces proposed to be discharged to a critical area shall receive water quality treatment in accordance with the current City's Stormwater Management Manual, Wetland Protection Guidelines, where applicable. Water quality treatment and monitoring may be required irrespective of the thresholds established in the manual. Water quality treatment shall be required for pollution generating surfaces using all known, available and reasonable methods of prevention, control and treatment. h. Studies of potential flood, erosion, geological or any other hazards on the site and measures to eliminate or reduce the hazard. i. An assessment of native vegetation to include habitat types (i.e., coniferous forest, mixed coniferous-deciduous forest, scrub-shrub, meadow), species richness, and dominate species. Provide percent cover for ground, shrub, and tree canopy layers. Describe vertical structure. This can be done using a foliage height diversity index such as MacArthur and MacArthur (1961). Include an estimate for non-native species present at each layer. Include an assessment of existing vegetation in any on-site wetland or stream buffer consistent with the vegetative buffer standards in TMC § 13.11.270J.3. If vegetated buffer standards are not being met, include a vegetative buffer plan consistent with TMC § 13.11.270J.4 and J.5. j. Provide the species and size of trees. At a minimum the average diameter at breast height (DBH) for each species and the location of any madrone greater than 12 inches and conifers greater than 30 inches must be provided. Describe the coniferous component as dominant, codominant or sub-dominant. A tree survey may be required to identify the location of trees of local significance or significant tree groves. k. Describe habitat elements that are present such as duff layer, cliffs, downed wood, and snags. l. For Biodiversity Areas and Habitat Corridors provide the overall size of the Biodiversity Area including off-site vegetated areas. Provide the average width for Habitat Corridors, and map delineated Biodiversity Areas and Habitat Corridors. m. For Oregon white oak woodlands/stands and/or individual trees, provide information and a delineation consistent with the classification in TMC § 13.11.510B.1.b and protection standards in TMC § 13.11.520D. 4. A Compensatory mitigation plan shall be provided for all permanent impacts to critical areas and their buffers/management areas and will conform to the general mitigation requirements listed under § 13.11.270 and any specific requirements identified in this chapter for the critical area. The plan shall include the following: a. The applicant must demonstrate that they meet one of two legal tests provided in § 13.11.240. b. Mitigation sequencing. The applicant shall demonstrate that an alternative design could not avoid or reduce impacts and shall provide a description of the specific steps taken to minimize impacts. c. Assessment of impacts including the amount, existing condition and anticipated functional loss. Include probable cumulative impacts. d. The amount and type of mitigation. Include goals, objectives, and clearly defined and measurable performance standards. Include contingency plans that define the specific course of action if mitigation fails. The Director may waive the requirement that a mitigation plan be prepared by a qualified professional when mitigation is limited to standard planting or enhancement activities. The waiver shall not be granted for creation or restoration activities. e. A description of the existing conditions and anticipated future conditions for the proposed mitigation area(s) including future successional community types for years 1, 5, 10 and 25, future wildlife habitat potential, water quality and hydrologic conditions. Compare this to the future conditions if no mitigation actions are undertaken. f. Specifications of the mitigation design and installation including construction techniques, equipment, timing, sequencing, and best management practices to reduce temporary impacts. g. A plant schedule including number, spacing, species, size and type, source of plant material, watering schedule and measures to protect plants from destruction. h. Monitoring methods and schedule for a minimum of five to 10 years as determined by the Director depending on the type and sensitivity of the mitigation action. i. A maintenance schedule to include ongoing maintenance and responsibility for removal of non-native, invasive vegetation and debris after monitoring is complete. j. A hydrologic report including any mitigative measures for alterations of the hydroperiod. The City may require additional pre- and post-development field studies and/or monitoring to establish water levels, hydroperiods, and water quality. Water quality shall be required for pollution generating surfaces using all known, available, and reasonable methods of prevention, control, and treatment. k. When mitigation includes creation or restoration of critical areas, paticularly wetlands or streams, surface and subsurface hydrologic conditions including existing and proposed hydrologic regimes shall be provided. Describe the anticipated hydrogeomorphic class and illustrate how data for existing hydrologic conditions were utilized to form the estimates of future hydrologic conditions. Future hydrologic conditions shall consider the effects of climate change to reduce risk to compensatory mitigation projects. l. Existing topography must be ground-proofed at two-foot contour intervals in the zone of any proposed wetland or stream creation or rehabilitation actions. Provide cross-sections of existing wetland and/or streams that are proposed to be impacted and cross-section(s) (estimated one-foot intervals) for the proposed areas of creation and/or rehabilitation. m. A bond estimate for required vegetation planting and/or mitigation using a bond quantity sheet provided by the City, or a minimum of three bond estimates per TMC § 13.11.290. n. An evaluation of potential adverse impacts on adjacent property owners resulting from the proposed mitigation and measures to address such impacts. 5. When the critical area is limited to a Geologically Hazardous Area described in TMC § 13.11.720, the purpose of the information submitted is to obtain a level of study sufficient to protect the public from hazards. The information and proposed mitigation will demonstrate that there is no significant risk to the public health and safety through compliance with the applicable standards of TMC § 13.11.730 and that any risk that cannot be effectively mitigated is avoided. 6. Programmatic development permit. In addition to the requirements above an application shall also include a Management Plan for the area using an approved template format or equivalent. The following information shall be included in the document; a. Explanation of the voluntary restoration and enhancement components including phasing. b. Identification of the qualified habitat steward, or other qualified professional, who will be responsible for overseeing restoration and enhancement activities. c. Explanation of training provided to individuals involved in activities to ensure an understanding of how to perform in accordance with the terms of the permit. 7. Reasonable use application. When an application is made utilizing the reasonable use legal test in TMC § 13.11.240B the application shall include the applicable items in TMC § 13.11.230B.1 through B.4, above and the following: a. A critical areas report pursuant to TMC § 13.11.230B, which shall include the following additional components: (1) An analysis of whether any other reasonable use with less impact on the critical area and critical area buffer is feasible. This may include: (a) A description of the restrictive regulation's economic impact on the property; (b) An explanation of how the regulations interfere with reasonable investment-backed expectations of the property; (c) Documentation of alternative development concepts (e.g., site layout, building footprint, development density or intensity, and access configuration) explored, including the reasons each alternative was determined to be infeasible or would result in equal or greater impacts to the critical area or critical area buffer; (2) Demonstration that site design and construction staging of the proposal shall have the least impact to the critical area and critical area buffer; (3) A description of protective measures that will be undertaken, such as siltation curtains, compost berms and other siltation prevention measures, and a schedule of the construction activity to avoid interference with wildlife and fisheries rearing, nesting or spawning activities; (4) An illustration of how the proposal minimizes to the greatest extent possible net loss of critical area functions; (5) An analysis of whether the improvement is located away from the critical area and the critical area buffer to the greatest extent possible; and (6) Such other information or studies as the Director may reasonably require.
( Ord. 27294 § 2, 2004-11-16 ; Ord. 27300 § 1, 2004-12-14 ; Ord. 27431 § 25, 2005-11-15 ; Ord. 27728 Ex. A, 2008-07-01 ; Ord. 27893 Ex. A, 2010-06-15 ; Ord. 28070 Ex. B, 2012-05-08 ; Ord. 28109 Ex. O, 2012-12-04 ; Ord. 28230 Ex. F, 2014-07-22 ; Ord. 28335 Ex. A, 2015-12-01 ; Ord. 28336 Ex C, 2015-12-01 ; Ord. 28518 Ex. 5, 2018-06-26 ; Ord. 29114 , 2026-07-14 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.