§ 13.11.270 — General mitigation requirements

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 13.11.270

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/93ef6e95-52f1-431b-8ca4-ca8468a5df37

§ 13.11.270: General mitigation requirements.

A. Unless otherwise provided in this Title, all adverse impacts resulting from a development proposal or alteration shall be mitigated using the best available science, so as to result in no net loss of critical area functions and values and to ensure public health and safety. In making a determination as to whether such a requirement will be imposed, and if so, the degree to which it would be required, the Director may consider the following: 1. The long-term and short-term effects of the action and the reversible or irreversible nature of the impairment to or loss of the Critical Area; 2. The location, size, and type of and benefit provided by the original and altered Critical Area; 3. The effect the proposed work may have upon any remaining critical area or associated aquatic system; 4. The cost and likely success of the compensation measures in relation to the magnitude of the proposed project or violation; 5. The observed or predicted trend with regard to the gains or losses of the specific type of critical area; and 6. Mitigation planting, when applicable, must follow best practices for density and composition. B. Mitigation projects shall not result in adverse impacts to adjacent property owners. C. Unless it can be demonstrated that off-site in-kind mitigation is ecologically preferable, preference shall be given to mitigation that is in-kind and on-site, when possible, and sufficient to maintain the functions and values of the critical area. D. The Director may determine that higher mitigation ratios or mitigation performance standards may be required when the likely success of mitigation is low due to site conditions, difficulty of the type of mitigation, or sensitivity of the critical area. E. Mitigation shall not be implemented until after permit approval of the Director and shall be in accordance with all reports and representations made therein. F. Mitigation sequencing. When an alteration to a critical area or its buffer/management area/setback is proposed, such alteration shall be avoided, minimized, or compensated for in the following order of preference. 1. Avoiding the impact altogether by not taking a certain action or parts of an action. 2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts. 3. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment. 4. Reducing or eliminating the impact over time by preservation and maintenance operations. 5. Compensating for the impact by replacing, enhancing, or providing substitute resources or environments. 6. Monitoring the required mitigation and taking remedial action where necessary. G. Mitigation for lost or affected functions. Compensatory mitigation shall address the functions affected by the proposed project or alteration to achieve functional equivalency or improvement and shall provide similar critical area or buffer/management area/setback functions as those lost, except when: 1. The lost critical area or buffer/management area/setback provides minimal functions as determined by a site-specific functional assessment, and the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide functions shown to be limited within a watershed through an existing watershed plan or a local or regional study that characterizes watershed processes; or 2. Out of kind replacement of critical area type or functions will best meet watershed goals formally identified by the City, such as replacement of historically diminished critical areas. H. Type and location of mitigation. Unless it is demonstrated that a higher level of ecological functioning would result from an alternative approach, compensatory mitigation for ecological functions shall be either in-kind and on-site, or in-kind and within the same stream reach, subbasin, or drift cell (if estuarine wetlands are impacted). Mitigation action shall be conducted within the same sub-drainage basin and on the site of the alteration except when all of the following apply: 1. There are no reasonable on-site or in subdrainage basin opportunities (e.g. on-site options would require elimination of high functioning upland habitat), or on-site and in subdrainage basin opportunities do not have a high likelihood of success based on a determination of the natural capacity of the site to compensate for impacts. Considerations should include: anticipated critical area mitigation ratios, buffer conditions and proposed widths, available water to maintain anticipated hydrogeomorphic classes of wetlands, or streams when restored, proposed flood storage capacity, potential to mitigate riparian fish and wildlife impacts (such as connectivity); 2. Off-site mitigation has a greater likelihood of providing equal or improved critical area functions than the impacted critical area; and 3. Off-site locations shall be in the same sub-drainage basin unless established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland functions have been established by the City and strongly justify location of mitigation at another site. I. Mitigation and vegetation planting plans shall include a monitoring program. The monitoring period shall be a minimum of five to 10 years. Monitoring period length will be determined by the Director depending on the type and sensitivity of the mitigation action. A monitoring report shall be submitted as required to document milestones, successes, problems, and contingency actions of the compensation project relative to stated performance standards. The project shall be monitored for a period necessary to establish that performance standards have been met. J. Vegetated buffer standards. 1. General. The entire wetland buffer width of TMC § 13.11.320 and stream buffer width of TMC § 13.11.420, referred to hereafter as the "buffer," located on a site proposed for any development shall be vegetated pursuant to the requirements of this section, or as required by a critical areas permit, whichever is greater. 2. When vegetative buffer standard applies. a. The complete vegetative buffer standard shall be installed either when: (1) The total new net impervious area on the entire subject property exceeds 1,000 square feet; or (2) The cost of new or replacement improvements exceeds 50 percent of the assessed or appraised value of the existing improvements on the entire subject property, whichever is greater. b. A partial vegetative buffer shall be installed when: (1) The total new net impervious area is between 50 square feet and 1,000 square feet on the subject property. (a) The buffer shall be vegetated at a minimum 1:1 ratio (new net impervious area is equal to the total square feet of buffer vegetation) meeting the vegetated buffer standard at the proportional rate of the standard; (b) The location of the vegetation planting in the buffer shall be in the area of most ecological benefit as approved by the Planning Director; (2) When a new net impervious surface on the subject property totals less than 50 square feet, no vegetation is required to be planted in the buffer; and c. For public parks and schools, for net new impervious improvements, the buffer shall be vegetated at a minimum 1:1 ratio (i.e., net square footage of vegetated buffer area must be planted to meet the standards to match the net new square footage of added impervious surfaces) meeting the vegetated buffer standard at the proportional rate of the standard, in a location and of dimensions approved by the Planning Director. An exemption from planting is allowed when the cumulative net new impervious surface on the subject property is equal to or less than 50 square feet within a 24-month period. d. For activities allowed with staff review, improvements and uses subject to development standards pursuant to TMC § 13.11.210, vegetative buffer requirements will be determined as part of the review. 3. Vegetative buffer standard. The following vegetative buffer standards shall be met: a. Native cover of at least 80 percent on average throughout the buffer area. Additionally, stratum of native plant species (trees, shrubs, groundcover) each must compose at least 20 percent areal cover: (1) Multi-age forest canopy (combination of existing and new vegetation); (2) Shrubs; and (3) Woody groundcover (such as kinnikinnick, salal and sword fern) or unmowed herbaceous groundcover; b. At least three native species, each making up a minimum of 10 percent coverage (for diversity); c. Less than 10 percent invasive weeds cover using Pierce County noxious weed list, State Noxious Weed List and Pierce County non-regulated species; and d. Removal of debris, lawn and any illegal fill placed after 1990, as determined by the City. 4. Additional standards. a. Except as allowed under § 13.11.200 and § 13.11.210, all existing improvements and structures in a buffer must be removed when the vegetative buffer installation is required pursuant to subsection J.2.a of this section; b. All activities in the buffer must cease, except those permitted under TMC § 13.11.200B.5 and TMC § 13.11.210B.1; c. Native vegetation appropriate for wetlands and streams shall be used based on Director approval. Other vegetation may be proposed if appropriate for the site and approved by the Director; d. Existing healthy native vegetation may count towards meeting the requirements if the overall standard is met; e. Installation shall be done by hand unless use of mechanical equipment is specifically authorized due to site conditions. By hand includes any handheld equipment that is gas or electric powered; and 5. Process. The Director shall determine whether an existing buffer meets the standards in subsection J.3 of this section as part of the critical area review of the required critical areas permit or development permit (if no critical areas permit is required) based on information in the critical areas report. 6. Submittal of vegetative buffer plan — Timing and contents. a. When an existing buffer does not meet the standards in subsection J.3 of this section, the applicant shall submit a vegetative buffer plan with the critical areas or development permit application; b. The vegetative buffer plan shall be prepared by a qualified critical area professional; c. The Director shall approve the plan only if it meets the vegetative buffer standard in this section; and d. If a modification is proposed to a wetland or stream (TMC § 13.11.330 or § 13.11.430) then a detailed final planting plan shall be submitted with the development permit application. 7. Maintenance, monitoring and sureties. A maintenance and monitoring program pursuant to TMC § 13.11.270 shall be submitted with the applicable critical areas application. The sureties pursuant to TMC § 13.11.290 for the vegetative buffer shall be submitted prior to issuance of a building or site development permit or before commencement of an activity. The maintenance/monitoring program shall be prepared by a qualified critical areas professional. 8. Protection and maintenance of vegetative buffer. Critical areas and buffers shall be placed in recorded critical area easements or tracts, or be noticed on title, pursuant to TMC § 13.11.280 and shall be maintained in perpetuity. K. Approved programmatic mitigation. Where the mitigation sequencing requirements of Subsections F.1. through F.6, above have been met and on-site mitigation has been demonstrated to be infeasible or in addition to federal mitigation requirements resulting in excess mitigation the Director may allow for programmatic mitigation. 1. Wetland mitigation banks. a. Credits from a wetland mitigation bank may be approved for use as compensation for unavoidable impacts to wetlands when: (1) The bank is certified under state rules; (2) The Director determines that the wetland mitigation bank provides appropriate compensation for the authorized impacts; and (3) The proposed use of credits shall be consistent with terms and conditions of the bank's certification. b. Replacement ratios for projects using bank credits shall be consistent with replacement ratios specified in the bank's certification. c. Credits from a certified wetland mitigation bank may be used to compensate for impacts located within the service area specified in the bank's certification. In some cases, the service area of the bank may include portions of more than one adjacent drainage basin for specific wetland functions. 2. In-lieu fee (ILF) mitigation. a. Credits from an approved in-lieu fee program may be used when all the following apply: (1) The Director determines that it would provide appropriate compensation for the proposed impacts. (2) The proposed use of credits is consistent with the terms and conditions of the approved ILF program instrument. (3) Projects using ILF credits shall have debits associated with the proposed impacts calculated by the applicant's qualified professional using the credit assessment method specified in the approved instrument for the ILF program. b. To aid in the implementation of off-site mitigation, the City may develop a program which prioritizes wetland areas for use as mitigation and/or allows payment in lieu of providing mitigation on a development site. This program shall be developed consistent with state and federal rules. The program should address: (1) The identification of sites within the City that are suitable for use as off-site mitigation. Site suitability shall take into account wetland functions, potential for wetland degradation, and potential for urban growth and service expansion; and (2) The use of fees for mitigation on available sites that have been identified as suitable and prioritized. L. Timing of compensatory mitigation. It is preferred that compensation projects will be completed prior to activities that will disturb the on-site critical area. If not completed prior to disturbance, compensatory mitigation shall be completed immediately following the disturbance and prior to the issuance of final certificate of occupancy. Construction of mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora. The Director may authorize a one-time temporary delay in completing construction or installation of the compensatory mitigation when the applicant provides a written explanation from a qualified professional as to the rationale for the delay (i.e. seasonal planting requirements, fisheries window). M. Critical area enhancement as mitigation. Impacts to critical area functions may be mitigated by enhancement of existing significantly degraded critical areas, but should be used in conjunction with restoration and/or creation where possible. Applicants proposing to enhance critical areas or their buffers must include in a report how the enhancement will increase the functions of the degraded critical area or buffer and how this increase will adequately mitigate for the loss of critical area and function at the impact site. An enhancement proposal must also show whether any existing critical area functions will be reduced by the enhancement action. N. Innovative mitigation. The Director may approve innovative mitigation projects that are based on best available science including but not limited to activities such as advance mitigation and preferred environmental alternatives. Innovative mitigation proposals must offer an equivalent or better level of protection of critical area functions and values than would be provided by the strict application of this chapter. Such mitigation proposals must demonstrate special consideration for conservation and protection measures for anadromous fisheries. The Director shall consider the following for approval of an innovative mitigation proposal: 1. Creation or enhancement of a larger system of natural areas and open space is preferable to the preservation of many individual habitat areas; 2. The applicant demonstrates that long-term protection and management of the habitat area will be provided; 3. There is clear potential for success of the proposed mitigation at the proposed mitigation site; 4. Mitigation according to TMC § 13.11.270E is not feasible due to site constraints such as parcel size, stream type, wetland category, or excessive costs; 5. A wetland of a different type is justified based on regional needs or functions and values; 6. The replacement ratios are not reduced or eliminated; unless the reduction results in a preferred environmental alternative; and 7. Public entity cooperative preservation agreements such as conservation easements are applied.

( Ord. 27294 § 2, 2004-11-16 ; Ord. 27431 § 35, 2005-11-15 ; Ord. 27728 Ex. A, 2008-07-01 ; Ord. 28070 Ex. B, 2012-05-08 ; Ord. 28109 Ex. O, 2012-12-04 ; Ord. 28335 Ex. A, 2015-12-01 ; Ord. 28518 Ex. 5, 2018-06-26 ; Ord. 29114 , 2026-07-14 )