§ 19.02.010 — General compliance
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 19.02.010
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/2df2e36f-f355-41e3-a74b-4a23eb6d66b2
§ 19.02.010: General compliance.
1. To be authorized under this Program, all uses and developments shall be planned and carried out in a manner that is consistent with the TMC and this Program regardless of whether a shoreline substantial development permit, statement of exemption, shoreline variance, or shoreline conditional use permit is required. 2. The City shall not issue any permit for development within shoreline jurisdiction until approval has been granted pursuant to the adopted Program. 3. A development or use that does not comply with the bulk, dimensional and/or performance standards of this Program shall require a shoreline variance even if the development or use does not require a substantial development permit. 4. A development or use that is listed as a conditional use pursuant to this Program, or is an unlisted use, must obtain a conditional use permit even if the development or use does not require a substantial development permit. 5. Issuance of a shoreline substantial development permit, shoreline variance or shoreline conditional use permit does not constitute approval pursuant to any other federal, state or City laws or regulations. 6. All shoreline permits or statements of exemption issued for development or use within shoreline jurisdiction shall include written findings prepared by the Director, documenting compliance with bulk and dimensional policies and regulations of this Program. The Director may attach conditions to the approval as necessary to assure consistency with the RCW 90.58 and this Program. Such conditions may include a requirement to post a performance bond assuring compliance with permit requirements, terms and conditions. 7. Proposed actions that would alter designated critical areas or their buffers, as established by this Program (TSMP Section 19.06.040) shall be reviewed for compliance with the provisions of this Program. Applicable critical area report and/or mitigation plan and/or habitat management plan shall be prepared consistent with the requirements of TSMP Section 19.02.040B and submitted as part of the development application or request for statement of exemption. The critical area review shall be conducted and processed in conjunction with the highest threshold of review that is applicable to the primary development proposed: a. Review pursuant to TSMP Section 19.02.030C (List of Exemptions); b. Land Use Permit or Building Permit; c. Excavation, Grading, Clearing and Erosion Control Permit; d. SEPA Threshold Determination; e. Shoreline Substantial Development Permit; f. Shoreline Conditional Use Permit; or g. Shoreline Variance.
( Ord. 28612 Ex. A, 2019-09-24 , previously codified as TSMP Section 2.1.)
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.
