§ 19.02.040 — Minimum permit application submittal requirements
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 19.02.040
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/3aff6c17-3549-40e6-bebb-df643ac0b512
§ 19.02.040: Minimum permit application submittal requirements.
A. General requirements. 1. Pursuant to WAC 173-27-180, all applications for a shoreline substantial development permit, conditional use, or variance shall provide, at a minimum, the following information: The name, address and phone number of the applicant. The applicant should be the owner of the property or the primary proponent of the project and not the representative of the owner or primary proponent. 2. The name, address and phone number of the applicant's representative if other than the applicant. 3. The name, address and phone number of the property owner, if other than the applicant. 4. Location of the property. This shall, at a minimum, include the property address and identification of the section, township and range to the nearest quarter, quarter section or latitude and longitude to the nearest minute. All applications for projects located in open water areas away from land shall provide a longitude and latitude location. 5. Identification of the name of the shoreline (water body) that the site of the proposal is associated with. This should be the water body from which jurisdiction of the act over the project is derived. 6. A general description of the proposed project that includes the proposed use or uses and the activities necessary to accomplish the project. 7. A general description of the property as it now exists including its physical characteristics and improvements and structures. 8. A general description of the vicinity of the proposed project including identification of the adjacent uses, structures and improvements, intensity of development and physical characteristics. 9. A site development plan consisting of maps and elevation drawings, drawn to an appropriate scale to depict clearly all required information, photographs and text which shall include: a. The boundary of the parcel(s) of land upon which the development is proposed. b. The ordinary high water mark of all water bodies located adjacent to or within the boundary of the project. This may be an approximate location provided, that for any development where a determination of consistency with the applicable regulations requires a precise location of the ordinary high water mark the mark shall be located precisely and the biological and hydrological basis for the location as indicated on the plans shall be included in the development plan. Where the ordinary high water mark is neither adjacent to or within the boundary of the project, the plan shall indicate the distance and direction to the nearest ordinary high water mark of a shoreline. c. Existing and proposed land contours. The contours shall be at intervals sufficient to accurately determine the existing character of the property and the extent of proposed change to the land that is necessary for the development. Areas within the boundary that will not be altered by the development may be indicated as such and contours approximated for that area. d. A delineation of all wetland areas that will be altered or used as a part of the development. e. A general indication of the character of vegetation found on the site. f. The dimensions and locations of all existing and proposed structures and improvements including but not limited to; buildings, paved or graveled areas, roads, utilities, septic tanks and drainfields, material stockpiles or surcharge, and stormwater management facilities. g. Where applicable, a landscaping plan for the project. h. Where applicable, plans for development of areas on or off the site as mitigation for impacts associated with the proposed project shall be included and contain information consistent with the requirements of this section. i. Quantity, source and composition of any fill material that is placed on the site whether temporary or permanent. j. Quantity, composition and destination of any excavated or dredged material. k. A vicinity map showing the relationship of the property and proposed development or use to roads, utilities, existing developments and uses on adjacent properties. l. Where applicable, a depiction of the impacts to views from existing residential uses and public areas. m. On all variance applications the plans shall clearly indicate where development could occur without approval of a variance, the physical features and circumstances on the property that provide a basis for the request, and the location of adjacent structures and uses. 10. The Director may accept a JARPA in lieu of these submittal requirements where applicable. 11. The Director may waive permit submittal requirements on a case by case basis and may request additional information as necessary. B. Critical areas. 1. Shoreline critical areas review. a. City staff will provide an initial site review based on existing information, maps and a potential site visit to identify all critical areas and their associated buffers within 300 feet of a proposed project. The review distance for FWHCA management areas will be based on the type of priority habitat or species and WDFW recommendations. Site reviews are completed on a site by site basis and the City may provide preliminary information or require an applicant provide information regarding the ordinary high water mark location, wetland delineation, wetland categorization, stream type, hydrology report, or priority fish and wildlife species and habitat presence information. Formal Priority Habitats and Species (PHS) information is available from WDFW. b. The Planning and Development Services Department may utilize information from the United States Department of Agriculture Natural Resource Conservation Service, the United States Geological Survey, the Washington Department of Ecology, the Coastal Zone Atlas, the Washington Department of Fish and Wildlife stream maps and Priority Habitat and Species maps, Washington DNR Aquatic Lands maps, the National Wetlands Inventory maps, Tacoma topography maps, the City’s Generalized Wetland and Critical Areas Inventory maps, and Pierce County Assessor’s maps to establish general locations and/or verify the location of any wetland, or stream, or FWHCA site. The City’s Generalized Wetland and Critical Area Inventory maps and other above-listed sources are only guidelines available for reference. The actual location of critical areas must be determined on a site by site basis according to the classification criteria. c. The Director shall determine whether application for a shoreline permit or exemption will be required to include the marine shoreline and critical areas information specified in TSMP Section 19.02.040B.2, below. d. The Director may require additional information on the physical, biological, and anthropogenic features that contribute to the existing ecological conditions and functions to make this determination. 2. Application requirements. a. Application for any shoreline development permit for a project or use which includes activities within a critical area or their associated buffer shall comply with the provisions of this section and shall contain the following information: (1) A Joint Aquatic Resources Permit Application and vicinity map for the project. (2) A surveyed site plan that includes the following: (a) Parcel line(s), north arrow, scale and two foot contours. (b) Location and square footage for existing and proposed site improvements including, utilities, stormwater and drainage facilities, construction and clearing limits, and off-site improvements. Include the amounts and specifications for all draining, excavation, filling, grading or dredging. (c) The location and specifications of barrier fencing, silt fencing and other erosion control measures. (d) Base flood elevation, floodplain type and boundary and floodways, if site is within a floodplain. (e) Critical areas including all surveyed, delineated wetland boundaries, the ordinary high water mark of any stream and/or marine water, all Fish and Wildlife Conservation Areas (FWHCA), FWHCA Management Areas, floodplain boundaries, top and toe of slopes related to geologically hazardous areas, and all associated setbacks and/or buffers. (f) The square footage of the existing critical areas and their associated buffers located on-site and the location and square footage of any impacted areas. (g) Locations of all data collection points used for the field delineation and general location of off-site critical areas and any associated buffer that extends onto the project site. Location and dominant species for significantly vegetated areas. (h) The location and square footage of impact areas, mitigation areas and remaining critical areas and their associated buffers; including areas proposed for buffer modification. (3) A Critical area report prepared by a qualified professional. The report must include the following where appropriate: (a) Delineation, characterization and square footage for critical areas on or within 300 feet of the project area and proposed buffer(s). Delineation and characterization is based on the entire critical area. When a critical area is located or extends off-site and cannot be accessed, estimate off-site conditions using the best available information and appropriate methodologies. i. Wetland Delineations will be conducted in accordance with the approved federal manual and applicable regional supplements. ii. The wetland characterization shall include physical, chemical, and biological processes performed as well as aesthetic, and economic values and must use a method recognized by local or state agencies. Include hydrogeomorphic and Cowardin wetland habitat type. iii. Ordinary high water mark determination shall be in accordance with methodology from the Department of Ecology. iv. Priority species and habitat identification shall be prepared according to professional standards and guidance from the Washington Department of Fish and Wildlife. Depending on the type of priority species, the review area may extend beyond 300 feet. (b) Field data sheets for all fieldwork performed on the site. The field assessment shall identify habitat elements, rare plant species, hydrologic information including inlet/outlets, water depths, and hydro-period patterns based on visual cues, and/or staff/crest gage data. (c) Provide a detailed description of the project proposal including off-site improvements. Include alterations of ground or surface water flow, clearing and grading, construction techniques, materials and equipment, and best management practices to reduce temporary impacts. (d) Assess potential direct and indirect physical, biological, and chemical impacts as a result of the proposal. Provide the square footage for the area of impact with the analysis. The evaluation must consider cumulative impacts. (e) Identification of priority species/habitats and any potential impacts. Incorporate Washington State Department of Fish and Wildlife and/or US Department of Fish and Wildlife management recommendations where applicable. When required, plan shall include at a minimum the following: i. Special management recommendations which have been incorporated and any other mitigation measures to minimize or avoid impacts, including design considerations such as reducing impacts from noise and light. ii. Ongoing management practices which will protect the priority species and/or habitat after development, including monitoring and maintenance programs. (f) A hydrologic report or narrative demonstrating that pre and post development flows to wetlands and streams will be maintained. (g) Runoff from pollution generating surfaces proposed to be discharged to a critical area shall receive water quality treatment in accordance with the current City’s Surface Water Management Manual, where applicable. Water quality treatment and monitoring may be required irrespective of the thresholds established in the manual. Water quality treatment shall be required for pollution generating surfaces using all known, available and reasonable methods of prevention, control and treatment. (h) Studies of potential flood, erosion, geological or any other hazards on the site and measures to eliminate or reduce the hazard. (i) Documentation of the presence of contaminated sediments or soils if publicly available and a description of planned management actions. (4) For shoreline permits that will have impacts to critical areas or their associated buffers defined in TSMP Section 19.06.040B, the additional following information is required; (a) A description of reasonable efforts made to apply mitigation sequencing pursuant to TSMP Section 19.06.040D.3; (b) An analysis of site development alternatives including a no development alternative that demonstrates why the use or development requires a buffer reduction and the minimum reduction necessary to support the use or development; (c) An assessment and documentation of the shoreline and/or critical areas functional characteristics, along with its ecological, aesthetic, economic, and other values. Functional analysis must be done using a functional assessment method recognized by local or state agency staff and shall include a reference for the method and all data sheets; (d) An assessment of the probable cumulative impacts resulting from the proposed development; (e) A mitigation plan for impacts associated with actions. The mitigation plan must be in conformance with the General Mitigation Requirements under TSMP Section 19.06.040D.3 and 4 as well as the specific mitigation requirements contained in this section; and, (f) A study of potential flood, erosion or other hazards on the site and provisions for protective measures that might be taken to reduce such hazards as required by City staff. (5) For development proposals that will have impacts to an FWHCA or marine buffer, a habitat management plan, biological evaluation, or equivalent shall be submitted. The report shall incorporate the items within this section and shall also include at a minimum: (a) Analysis and discussion of the project’s effects on critical fish and wildlife habitat; (b) An assessment and discussion on special management recommendations which have been developed for species or habitats located on the site by any federal or state agency; (c) Proposed mitigation measures which could minimize or avoid impacts and are consistent with TSMP Section 19.06.040D.3; (d) An assessment and evaluation of the effectiveness of mitigation measures proposed; and (e) An assessment and evaluation of ongoing management practices which will protect critical fish and wildlife habitat after development of the project site, including proposed monitoring and maintenance programs. (6) In the event of conflicts regarding information in the report, the Director may, at the applicant’s expense, obtain competent expert services to verify information and establish a final delineation; b. Critical area reports shall be submitted and the Director shall review all information submitted as to its validity and may reject it as incomplete or incorrect. All reports shall be prepared by a qualified professional as defined in TSMP Chapter 19.10. c. The Director may waive permit submittal requirements on a case by case basis and may request additional information as necessary to ensure compliance with this Master Program and the Act. C. Boating facilities. 1. Applications for new boating facilities, including marinas and launch ramps, shall be approved only if enhanced public access to public waters outweighs the potential adverse impacts of the use. Applications shall be accompanied by supporting application materials that document the market demand for such facilities, including a. The total amount of moorage proposed; b. The proposed supply, as compared to the existing supply within the service range of the proposed facility, including vacancies or waiting lists at existing facilities; c. The expected service population and boat ownership characteristics of the population; d. Existing approved facilities or pending applications within the service area of the proposed new facility. 2. New marinas with in-water moorage and expansion of in-water moorage facilities in existing marinas shall be approved only when: a. Opportunities for upland storage sufficient to meet the demand for moorage are not available on site. 3. Applications for launch ramps shall contain: a. A habitat survey; b. A slope bathymetry map; and, c. Evaluation of effects on littoral drift. 4. Applications for marinas, launch ramps, and accessory uses shall include an assessment of existing water-dependent uses in the vicinity including, but not limited to, navigation, fishing, shellfish harvest, pleasure boating, swimming, beach walking, picnicking and shoreline viewing and document potential impacts and mitigating measures. Impacts on these resources shall be considered in review of proposals and specific conditions to avoid or minimize impacts may be imposed. 5. Marina and launch ramp proposals may be required to prepare a visual assessment of views from surrounding residential properties, public viewpoints and the view of the shore from the water surface. D. Moorage facilities. 1. As part of any application for shoreline substantial development that involves the construction of piers, wharves, docks, and floats, the applicant shall provide the following: a. Environmental and navigational impact, pier density, waste disposal, oil and gas spillage, parking availability, and impact on adjacent lands; b. A description of the size, capacity, and intended use of the structure and whether the intended use is permitted within the shoreline district; c. Whether cooperative use is present or may be present in the future; d. Whether existing facilities may be used or expanded to be used in preference to the construction of new facilities. New facilities should require a demonstration of public benefit as appropriate; and, e. Whether an open pile or floating structure is the appropriate design. E. Major utilities. 1. Application requirements for the installation of major utility facilities shall include the following: a. Description of the proposed facilities; b. Reasons why the utility facility requires a shoreline location; Alternative locations considered and reasons for elimination; Location of other utility facilities in the vicinity of the proposed project and any plans to include the other types of utilities in the project; c. Plans for reclamation of areas disturbed both during construction and following decommissioning and/or completion of the useful life of the utility; d. Plans for control of erosion and turbidity during construction and operation; and, e. Identification of any possibility for locating the proposed facility at another existing location. F. Archaeological, cultural and historic resources. 1. Known archaeological, cultural and historic resources. a. Applications for a shoreline permit shall identify whether the property is within 500 feet of a site known to contain an historic, cultural or archaeological resource(s). Records of known sites are restricted. Consultation with Washington Department of Archaeology and Historic Preservation or a certified archaeologist will be required. If the property is determined to be within 500 feet of a site known to contain an historic, cultural, or archaeological resources, the City shall require a cultural resource site assessment; provided that, the provisions of this section may be waived if the Director determines that the proposed development activities do not include any ground disturbing activities and will not impact a known historic, cultural or archaeological site. The site assessment shall be conducted in accordance with Washington State Department of Archaeology and Historic Preservation guidelines for survey and site reporting to determine the presence of significant historic or archaeological resources. The fee for the services of the professional archaeologist or historic preservation professional shall be paid by the landowner or responsible party. b. If the cultural resource site assessment identifies the presence of significant historic or archaeological resources, a Cultural Resource Management Plan (CRMP) shall be prepared by a professional archaeologist or historic preservation professional paid by the landowner or responsible party. In the preparation of such plans, the professional archaeologist or historic preservation professional shall solicit comments from the Washington State Department of Archaeology and Historic Preservation, and the Puyallup Tribe. Comments received shall be incorporated into the conclusions and recommended conditions of the CRMP to the maximum extent practicable. c. A CRMP shall contain the following minimum elements: (1) The CRMP shall be prepared by a qualified cultural resources consultant, as defined by the Washington State Department of Archaeology and Historic Preservation. (2) The CRMP shall include the following information: (a) Description of the Area of Potential Effect (APE) for the project, including a general description of the scope of work for the project and the extent and locations of ground disturbing activities. Ground disturbing activities include excavations for footings, pilings, utilities, environmental testing or sampling, areas to be cleared and/or graded, demolition, removal or relocation of any existing structures, and any other ground disturbances that may occur as a result of construction activities; (b) Photographs of the APE, including existing structures and areas of construction activities; (c) An examination of project on-site design alternatives; (d) An explanation of why the proposed activity requires a location on, or access across and/or through, a significant historic or archaeological resource; and (e) Citations with dates, of any previous written documentation on listed or known culturally significant sites. In compiling this information consultations with the following agencies shall be necessary. A list of the agency officials that were consulted with shall be included: i. State Department of Archaeology and Historic Preservation to identify buildings, sites or objects within the APE that are listed on or the National Register of Historic Places or the Washington State Heritage Register. ii. City of Tacoma Historic Preservation Office to identify any buildings, sites, or objects within the APE listed on the Tacoma Register of Historic Places. iii. The Puyallup Tribe of Indians Historic Preservation Section to identify any buildings, sites, or objects within the APE within the 1873 Land Claims Settlement Survey Area, and areas regulated under TMC Title 19, Shoreline Master Program. (f) An assessment of probable adverse impacts to culturally significant buildings, sites or objects, resulting from: i. Demolition of any buildings or structures over 50 years of age. ii. The potential for the site to contain historic or prehistoric archaeological materials, based on the topography of the property, historical literature, geological data, geographical context, or proximity to areas of known cultural significance. (g) A description of how potential adverse effects to cultural resources as a result of construction activities will be mitigated or minimized. Mitigation includes but is not limited to: i. Additional consultation with Federal, State, local and Tribal officials or Tacoma Landmarks Commission. ii. Additional studies such as pedestrian surveys, subsurface testing, remote sensing, phased or periodic testing as a part of any geotechnical assessment or soil testing required for the project, or monitoring during construction. iii. Subject to review and approval of the City’s Historic Preservation Officer other potential mitigation measures may include: • | Avoidance of historic/cultural resources; • | Retention of all or some of historic structure into a new development; • | Interpretive/educational measures; • | Off-site/on site preservation of another historic resource; • | Recording the site with the State Department of Archaeology and Historic Preservation, or listing the site in the National Register of Historic Places, Washington Heritage Register, as applicable, or any locally developed historic registry formally adopted by the City of Tacoma; • | Preservation in place; • | Reinternment in the case of grave sites; • | Covering an archaeological site with a nonstructural surface to discourage pilferage (e.g., maintained grass or pavement); • | Excavation and recovery of archaeological resources; • | Inventorying prior to covering of archaeological resources with structures or development; and • | Monitoring of construction excavation. d. Upon receipt of a complete development permit application in an area of known historic/archaeological resources, the City shall notify and request a recommendation from appropriate agencies such as the Washington State Department of Archaeology and Historic Preservation, and the Puyallup Tribe. Recommendations of such agencies and other affected persons shall be duly considered and adhered to whenever possible and reasonable. e. The recommendations and conclusions of the CRMP shall be used to assist the Director in making final administrative decisions concerning the presence and extent of historic/archaeological resources and appropriate mitigating measures. The Director shall consult with the Washington State Department of Archaeology and Historic Preservation, and the Puyallup Tribe prior to approval of the CRMP. f. The Director may reject or request revision of the conclusions reached in a CRMP when the Director can demonstrate that the assessment is inaccurate or does not fully address the historic/archaeological resource management concerns involved. 2. Unanticipated discovery of archaeological, cultural and historic resources. a. All applications for a shoreline permit shall prepare a plan for the possible unanticipated discovery of historic, cultural or archaeological resource(s), including a point of contact, procedure for stop-work notification, and for notification of appropriate agencies.
( Ord. 28612 Ex. A, 2019-09-24 , previously codified as TSMP Section 2.4.)
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.
