§ 2.19.060: Surface water drainage and temporary erosion control requirements.
A. Surface water drainage. 1. General. All drainage facilities shall be designed per the requirements of the COTSWMM. Site drainage shall not be directed onto/across adjacent properties without first obtaining necessary easements from the property owner and approval of the Public Works Department. All existing and proposed drainage courses shall be identified on the plans. Existing drainage shall be maintained unless an alternative drainage system is provided that is approved by the Building Official. When approved by the Building Official, site drainage may be discharged into public streets, but may not drain directly over the public sidewalks and driveways. Recorded drainage facility easements across adjacent properties are required prior to issuance of the grading permit. Connections to the City storm drainage system require a separate permit. 2. Swales and ditches. Swales or ditches, where provided, shall have a minimum gradient of 50 horizontal to 1 vertical (two percent) where paved and a minimum gradient of 20 horizontal to 1 vertical (five percent) otherwise. Paving for swales and ditches shall be with reinforced concrete not less than three inches in thickness, or other material approved by the Building Official. Unpaved swales and ditches shall be grass or rock lined. They shall have a minimum depth at the deepest point of 12 inches where paved and 24 inches where unpaved, and a minimum width of 5 feet. A single run of swale or ditch shall not collect runoff from a tributary area exceeding 13,500 square feet of horizontal projected area without discharging to a private or public storm sewer pipeline. 3. Interceptor drains. Interceptor drains shall be installed along the top of all slopes receiving drainage from a tributary width greater than 40 feet, measured horizontally. Interceptor drains shall be paved with a minimum of three inches of concrete or gunite, or other material approved by the Building Official. They shall have a minimum depth of 12 inches and a minimum paved width of three feet, measured horizontally across the drain. The slope of the drain shall be approved by the Building Official, but shall not be less than 50 horizontal to 1 vertical (2 percent). Discharge from the drain shall be accomplished in a manner to prevent erosion and shall be approved by the Building Official. 4. Subsurface drains. Cut and fill slopes shall be provided with subsurface drainage as necessary for stability. Subsurface drains shall be designed by a civil engineer. 5. Disposal. All drainage facilities shall be designed to carry waters to the nearest practicable drainage-way that is approved by the Building Official or other approving agency as a safe place to deposit such waters. Erosion of ground in the area of discharge shall be prevented by installation of non-erosive down drains or other devices. B. Erosion control and temporary surface water control. 1. Erosion and sediment control. The faces of cleared or graded slopes shall be prepared and maintained to control erosion. Such control shall consist of approved erosion and sediment control best engineering practices. Permanent protection for slopes shall be installed as soon as practicable and prior to calling for final approval. 2. Thresholds. A Construction Stormwater Pollution Prevention Plan (SWPPP) is required for all projects proposing to: a. Add or replace 2,000 square feet or more of impervious surface; and/or b. Disturb 7,000 square feet or more of land. 3. Erosion and Sediment Control (ESC) lead. For all sites or projects requiring engineered grading in excess of 500 cubic yards, either a civil engineer or other person possessing an approved certificate for erosion and sediment control training shall be identified in the Construction SWPPP and shall be on-site or on-call at all times. Certification may be through the Washington State Department of Transportation/Associated General Contractors (WSDOT/AGC) Construction Site Erosion and Sediment Control Certification Program or any equivalent local or national certification and training program as approved by the Building Official. 4. Special approved discharge permit (construction dewatering). All discharges during construction to the City sewer system (storm or sanitary) require prior City approval. Discharge to the City sewer system during construction may require a separate Special Approved Discharge permit. C. Soils engineering report. 1. Soils engineering report conditions. A soils engineering report will be required for the following conditions: a. Clearing or grading in an area with moderate to steep slopes (greater than 25 percent slopes). b. Grading that will require a cut or fill greater than 10 feet in height vertically. c. Grading in excess of 5,000 cubic yards, except where grading consists of fills less than 2 feet in depth on level to shallow slopes. d. Grading that may impact support or stability of public right-of-way, existing building foundations or adjacent property. e. Grading work that will include installing retaining walls greater than 8 feet in height, or walls supported by soil nailing or tiebacks. f. Grading in areas where previous grading or uncontrolled filling has been conducted without a grading permit. g. Where groundwater seepage has been identified on the site. h. As required by the Building Official. 2. Soils engineering report contents. The soils engineering report shall include, but not be limited to: a. Data regarding a description of geology of the site, the nature, distribution, and strength of existing soils. b. Design criteria for retaining walls or similar structures. c. Conclusions and recommendations for filling and grading procedures. d. Design criteria for corrective measures, including buttress fills, when necessary. e. Stability analysis of moderate and steep slopes. f. Opinion on adequacy for the intended use of sites to be developed by the proposed grading as affected by geotechnical engineering and geologic factors. g. Design parameters for and evaluation of the geologic impact of proposed retaining wall structures and soil nails and tiebacks on adjacent properties and City rights-of-way. Soil nails or tiebacks extending into public right-of-way are required to obtain a street occupancy permit from the City of Tacoma, and shall be temporary in nature. Where retaining wall structures, soil nails or tiebacks extend into private property, a recorded easement is required prior to issuing said permits. Soil nailing and tiebacks shall be required to comply with the City of Tacoma Soil Nail Policy. 3. Liquefaction study. For sites with mapped maximum considered spectral response accelerations at short periods (Ss) greater than 0.5g as determined by IBC Section 1613, a study of the liquefaction potential of the site shall be provided, and the recommendations incorporated in the plans. EXCEPTION: A liquefaction study is not required where the Building Official determines from established local data that liquefaction potential is low.
( Ord. 28701 Ex. A, 2020-11-17 ; Ord. 28797 Ex. A, 2021-12-14 )