§ 2.19.070 — Inspection requirements
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 2.19.070
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/0b9802b1-b050-4c0a-8951-27b504cc9c71
§ 2.19.070: Inspection requirements.
A. General. Grading operations for which a permit is required shall be subject to inspection by the Director of Planning and Development Services, or designee. Special inspection of grading operations shall be provided by a civil engineer retained to provide such services where required by the Director of Planning and Development Services, or designee. B. Inspections. 1. Civil engineer inspections. The civil engineer shall provide inspection within such engineer's area of technical specialty, which shall consist of the following: a. Observation and review as to the establishment of line, grade, and surface drainage of the development area. b. Observation during grading and testing for required compaction to verify required compaction called for in the specifications has been met. c. Observation during the preparation of the natural ground, placement of fill, and construction of retaining walls to verify that such work is being performed in accordance with the conditions of the approved plan and the appropriate requirements of this chapter. 2. Erosion control inspections. Where required by the Director of Planning and Development Services, or designee, either a civil engineer or other person possessing an approved certificate for erosion and sediment control training shall provide inspection of erosion and sediment control at the site. The erosion control inspector shall report to the Director of Planning and Development Services, or designee, and be responsible for assuring that all erosion control systems are installed and maintained until the site has been permanently stabilized. It shall also be the responsibility of this inspector to supervise the proper removal of temporary erosion control systems at the end of the project. C. Notification of noncompliance. If, in the course of fulfilling their respective duties under this chapter, the civil engineer finds that the work is not being done in conformance with this chapter or the approved grading plans, the discrepancies shall be reported immediately to the Director of Planning and Development Services, or designee. D. Transfer of responsibility. If the civil engineer of record is changed during grading, the work shall be stopped until the replacement has agreed in writing to accept their responsibility within the area of technical competence for approval upon completion of the work. It shall be the duty of the permittee to notify the Director of Planning and Development Services, or designee, in writing of such change prior to the recommencement of such grading. E. Completion of work. 1. Final reports. Upon completion of the rough grading work and at the final completion of the work, the Director of Planning and Development Services, or designee, may require a Completion Report which may include, but not be limited to, the following: a. A record drawing prepared by the civil engineer showing original ground surface elevations, as-graded ground surface elevations, lot drainage patterns, and the locations and elevations of surface drainage facilities and the outlets of subsurface drains. The civil engineer shall also provide a signed and stamped letter certifying the private storm drainage system was constructed as designed. b. A report prepared by the civil engineer including locations and elevations of field density tests, summaries of field and laboratory tests, observations and testing during retaining wall construction, as-constructed locations, elevations, and details of subsurface drains, and comments on any changes made during grading and their effect on the recommendations made in the approved soil engineering report. c. Reports of erosion control inspections performed by either the civil engineer or other person possessing an approved certificate for erosion and sediment control training, details of replacement or maintenance of erosion and sediment control systems and cleanup of any spills during grading activities. 2. Notification of completion. The permittee shall notify the Director of Planning and Development Services, or designee, when the clearing and grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage facilities and their protective devices, and all erosion control measures have been completed in accordance with the final approved clearing and grading plan, and the required reports have been submitted.
( Ord. 28701 Ex. A, 2020-11-17 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.
