§ 2.21.420 — Permit application
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 2.21.420
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/6830c239-a884-4d5d-a4c2-8e24400222ec
§ 2.21.420: Permit application.
The following shall be required for the issuance of a Temporary Shelter Permit: A. Permit application. The applicant shall submit a complete application for a Temporary Shelter Permit in accordance with this chapter. The application shall include a minimum of the following: 1. Site address, building owner, and operator name; 2. Site plan showing external facility layout and fire department access route, including location/distances to nearest fire hydrant(s); 3. Internal facility layout showing sleeping rooms and other spaces including restrooms and bathing facilities, kitchens, and other common spaces, and other portions of the building not being used; 4. Locations of doors, a schedule of door hardware, and exit signage; 5. Location of smoke/carbon monoxide alarms, and other fire/life safety equipment including fire alarms and sprinklers, fire alarm control panels, knox boxes, emergency communication devices, and other associated life safety systems; 6. Other permits being applied for related to this proposed use including land use/critical area, electrical, health department, site development, or others; 7. Operations and security plan; 8. Emergency evacuation plan; and 9. Staff training plan. B. Feasibility inspection. A minimum of 30 days prior to submitting an application for a temporary shelter, the shelter operator shall schedule a pre-inspection of the facility with the Building Official, the Fire Code Official, and the TPU Chief Electrical Inspector, or their designees. The inspection shall determine if the building and/or area are suitable for the temporary shelter and identify work to be completed prior to occupancy. Exception: Shelters to be operated for a period less than 30 days may schedule the pre-inspection a minimum of seven days prior to submitting their application. C. Pre-occupancy inspection. After work is completed and the permit application is approved, the Building Official and Fire Code Official, or their designees, shall conduct an inspection to verify life safety systems are in place and operational, and all requirements of the Temporary Shelter Permit have been met. Additional permits may be required for any proposed modification, whether permanent or temporary, to mechanical, electrical, plumbing, building, or fire elements or systems, or any onsite or offsite infrastructure or signage. D. Permit renewal/annual inspection. If the temporary shelter is in operation for more than one year, the Temporary Shelter Permit applicant shall submit an application for an annual permit renewal. As part of the annual permit renewal, an annual inspection shall be conducted by the Building Official and Fire Code Official, or their designees, to verify continued compliance with the requirements of the permit and any additional provisions which may need to be provided. Any deficiencies identified in this inspection shall be corrected prior issuance of the renewed permit. City inspectors may perform other inspections during periods of shelter operation and shall be allowed full access to the shelter area and adjacent vicinities. When possible, inspections will be scheduled to minimize disruptions to shelter activities and shelter residents.
( Ord. 28507 Ex. A, 2018-05-01 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.