For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.13.030 — Statutory noticing requirements

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 17.13.030

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/7fc446d9-4d2d-4033-b064-7f6a29d50a31

§ 17.13.030: Statutory noticing requirements.

A. Applicants shall follow the noticing requirements of the city. At a minimum, the city shall provide notice in accordance with WAC 173-27-110, and may provide for additional noticing requirements. Per WAC 173-27-120 the city shall comply with special procedures (public notice timelines, appeal periods, etc.) for limited utility extensions and bulkheads. B. The following subsections provide a summary of noticing days. The city shall consult the most current version of WAC 173-27-110 and 173-27-120 to confirm the days. In case of conflict, state statutes or rules shall control: 1. Issuance of Notice of Application. Notice of application shall be provided within fourteen days after the determination of completeness of the application. 2. Statement of Public Comment Period. The notice of application shall state the public comment period which shall be not less than thirty days following the date of notice of application, unless otherwise specified for limited utility extensions or single-family bulkheads below. 3. Notice of Application Prior to Hearing. If an open record predecision hearing, as defined in RCW 36.70B.020, is required for the requested project permits, the notice of application shall be provided at least fifteen days prior to the open record hearing. 4. Limited Utility Extension or Single-Family Bulkhead. An application for a substantial development permit for a limited utility extension or for the construction of a bulkhead or other measures to protect a single-family residence and its appurtenant structures from shoreline erosion shall be subject to all of the requirements of this chapter except that the following time periods and procedures shall be used: a. The public comment period shall be twenty days. The notice provided shall state the manner in which the public may obtain a copy of the city’s decision on the application no later than two days following its issuance; b. The city shall issue its decision to grant or deny the permit within twenty-one days of the last day of the comment period specified in subsection (B)(2) of this section; and c. If there is an appeal of the decision to grant or deny the permit to the hearing examiner, the appeal shall be finally determined by the hearing examiner within thirty days.

( Ord. 2015-002 § 1 (Exh. A), 2015 ; Ord. 2017-017 § 2 (Exh. B), 2017 ; Ord. 2021-015 § 2 (Exh. A), 2021 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.