§ 17.13.130 — Amendments to permits

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 17.13.130

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/e8eaa296-095b-40cd-89c2-f1df2a2d456f

§ 17.13.130: Amendments to permits.

A. A permit revision is required whenever the applicant proposes substantive changes to the design, terms or conditions of a project from that which is approved in the permit. Changes are substantive if they materially alter the project in a manner that relates to its conformance to the terms and conditions of the permit, this SMP, and/or the policies and provisions of Chapter 90.58 RCW. Changes which are not substantive in effect do not require approval of a revision. B. When an applicant seeks to revise a permit, the city shall request from the applicant detailed plans and text describing the proposed changes. Proposed changes must be within the scope and intent of the original permit, otherwise a new permit may be required. C. If the city determines that the proposed changes are within the scope and intent of the original permit, and are consistent with this SMP and the Act, the city may approve a revision. D. “Within the scope and intent of the original permit” means all of the following: 1. No additional over-water construction is involved except that pier, dock, or float construction may be increased by five hundred square feet or ten percent from the provisions of the original permit, whichever is less; 2. Ground area coverage and height may be increased a maximum of ten percent from the provisions of the original permit; 3. The revised permit does not authorize development to exceed height, lot coverage, setback, or any other requirements of this SMP except as authorized under a shoreline variance granted as the original permit or a part thereof; 4. Additional or revised landscaping is consistent with any conditions attached to the original permit and with this SMP; 5. The use authorized pursuant to the original permit is not changed; and 6. No adverse environmental impact will be caused by the project revision. E. The revision approval, including the revised site plans and text clearly indicating the authorized changes, and the final ruling on consistency with this section shall be filed with Ecology. In addition, the city shall notify parties of record of their action. F. If the revision to the original permit involves a shoreline conditional use permit or shoreline variance, the city shall submit the revision to Ecology for approval, approval with conditions, or denial, and shall indicate that the revision is being submitted under the requirements of this subsection. Ecology shall render and transmit to the city and the applicant its final decision within fifteen days of the date of Ecology’s receipt of the submittal from the city. The city shall notify parties of record of Ecology’s final decision. G. The revised permit is effective immediately upon final decision by the city or, when appropriate per subsection F of this section, upon final action by Ecology. Construction undertaken pursuant to a permit is at the applicant’s own risk until the expiration of the appeals deadline. 1. Filing. Appeals of a revised permit shall be in accordance with RCW 90.58.180 and shall be filed within twenty-one days from the date of filing of the city’s action by Ecology or, when appropriate under shoreline variances or conditional uses, the date Ecology’s final decision is transmitted to the city and the applicant. 2. Basis of Appeals. Appeals shall be based only upon contentions of noncompliance with the provisions of subsections A and B of this section. Appeals shall be based on the revised portion of the permit. 3. Risk. Construction undertaken pursuant to that portion of a revised permit not authorized under the original permit is at the applicant’s own risk until the expiration of the appeals deadline. 4. Scope of Decision. If an appeal is successful in proving that a revision is not within the scope and intent of the original permit, the decision shall have no bearing on the original permit.

( Ord. 2015-002 § 1 (Exh. A), 2015 ; Ord. 2017-017 § 2 (Exh. B), 2017 ; Ord. 2021-015 § 2 (Exh. A), 2021 )