For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.83.020 — Definitions

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.83.020

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/13103ecd-223d-4a40-9ba2-acce49ee826a

§ 7.83.020: Definitions.

“Applicant” means a person, party, firm, corporation, or other legal entity that proposes a development, construction or use on a site. “Average daily traffic” or “ADT” means the expected number of vehicles using a roadway. Projected average daily traffic volumes are considered in designing a roadway or roadway improvement. ADT volumes shall be estimated using “Trip Generation” published by the Institute of Transportation Engineers or from a traffic study prepared by a professional engineer or transportation specialist with expertise in traffic volume estimation. ADT volumes shall be estimated for the design year or expected life of the project (the intent is for treatment facilities to be added in the soonest period of disruptive construction). For project sites with seasonal or varied use, evaluate the highest period of expected traffic impacts. “BMP” means best management practice and may include, but is not limited to, a schedule of activity, prohibition of practice, maintenance procedure, and structural and/or managerial practice that, when used singly or in combination, prevents or reduces the release of pollutants and other adverse impacts to receiving waters. “Building” means any structure built for the support, shelter or enclosure of persons, animals, uses or property of any kind. Where this title requires, or where special authority granted pursuant to this title requires that a use shall be entirely enclosed within a building, this definition shall be qualified by adding “and enclosed on all sides.” “Channel” means an open conduit, either naturally or artificially created, which periodically or continuously contains moving water, or which forms a connecting link between two bodies of water. “Construction” means the assembly, placement, or installation of structures, roadways, transmission lines, and other improvements within a project site. “Dedication” is the deliberate appropriation of land by an owner for any general and public uses, reserving to himself no other rights than such as are compatible with the full exercise and enjoyment of the public uses to which the property has been devoted. The intention to dedicate shall be evidenced by the owner by the presentment for filing of a final plat or short plat showing the dedication thereon; and the acceptance by the public shall be evidenced by the approval of such plat for filing by the appropriate governmental unit; provided, that no affirmative duty to maintain or improve any dedicated land shall devolve upon the city except by resolution of the city council adopted for the purpose of undertaking a specified duty or duties as to specifically described land. “Design storm” means a prescribed hyetograph or precipitation distribution, and the total precipitation amount for a specific duration recurrence frequency. The design storm is used to estimate runoff for a hypothetical rainstorm of interest or concern for the purposes of analyzing existing drainage, designing new facilities, or assessing other impacts of a proposed project on the flow of surface water. “Detention” means the release of stormwater runoff from the site at a slower rate than it is collected by the stormwater facility system, the difference being held in temporary storage with the goals of controlling peak discharge rates and providing gravity settling of pollutants. “Development” means new development, redevelopment, or both. See definitions for each. “Director” means the director of community and economic development, designated city employee or authorized representative. “Easement” is a grant by a property owner to specific persons or to the public to use land for a specific purpose or purposes. “Flood” means an overflow or inundation that comes from a river or any other source, including (but not limited to) streams, tides, wave action, storm drains, or excess rainfall. Any relatively high stream flow overtopping the natural or artificial banks in any reach of a stream. “Groundwater recharge volume (Rev)” means the portion of the water quality volume (WQv) used to maintain groundwater recharge rates at development sites. “High ADT roadways and parking areas” means any road with ADT greater than thirty thousand vehicles per day; and parking areas with more than one hundred trip ends per one thousand square feet of gross building area or greater than three hundred total trip ends are considered to be high-use traffic areas. Examples include commercial buildings with a frequent turnover of customers and other visitors. “High-use sites” generate high concentrations of oil due to high traffic turnover or the frequent transfer of oil and/or other petroleum products. High-use sites are land uses where sufficient quantities of free oil are likely to be present such that they can be effectively removed with special treatment. A high-use site is any one of the following: (1) A road intersection with expected ADT of twenty-five thousand vehicles or more on the main roadway and fifteen thousand vehicles or more on any intersecting roadway, excluding projects proposing primarily pedestrian or bicycle use improvements; or (2) A commercial or industrial site with an expected trip end count equal to or greater than one hundred vehicles per one thousand square feet of gross building area (best professional judgment should be used in comparing this criterion with the following criterion); or (3) A customer or visitor parking lot with an expected trip end count equal to or greater than three hundred vehicles (best professional judgment should be used in comparing this criterion with the preceding criterion); or (4) Commercial on-street parking areas on streets with an expected total ADT count equal to or greater than seven thousand five hundred; or (5) Fueling stations and facilities; or (6) A commercial or industrial site subject to petroleum storage and transfer in excess of one thousand five hundred gallons per year (not including locations where heating fuel is routinely delivered to end users and the annual amount of heating oil used at the site is the sole basis for the site meeting this definition; heating fuel handling and storage facilities are subject to this definition); or (7) A commercial or industrial site subject to use, storage, or maintenance of a fleet of twenty-five or more diesel vehicles that are over ten tons gross weight (trucks, buses, trains, heavy equipment, etc.); or (8) Maintenance and repair facilities for vehicles, air-craft, construction equipment, railroad equipment or industrial machinery and equipment; or (9) Outdoor areas where hydraulic equipment is stored; or (10) Log storage and sorting yards and other sites subject to frequent use of forklifts and/or other hydraulic equipment; or (11) Railroad yards. “Impaired waters” means those streams, rivers and lakes that currently do not meet their designated use classification and associated water quality standards under the Clean Water Act and listed on the most current state of Washington 303(d) list. “Impervious surface” means a surface that has been covered with a layer of material so that it is highly resistant to infiltration by water. It includes most conventionally surfaced streets, roofs, sidewalks, driveways, parking lots, patios and other similar structures. “Industrial stormwater permit” means a National Pollutant Discharge Elimination System permit issued to a commercial industry or group of industries that regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies. “Infiltration” means the downward movement of water from the land surface to the subsoil. “Infiltration facility” means a drainage facility designed to use the hydrologic process of surface and stormwater runoff soaking into the ground, commonly referred to as percolation, to dispose of surface and stormwater runoff. These facilities may be above grade or below grade. “Land development” or “development” means any clearing, excavation, dredging, drilling, filling, dumping, removal of earth and mineral materials, or other permanent or temporary modification of a site up to, but not including, construction as defined in this chapter. For the purpose of this chapter, “development” also means any manmade change to improved or unimproved real estate located within the special flood hazard area, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling, temporary or permanent storage of equipment and works defined in this chapter. “Land disturbing activity” means any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and nonvegetative) and/or the existing soil topography. Land disturbing activities include but are not limited to clearing, grading, filling, and excavation. Compaction associated with stabilization of structures and road construction shall also be considered a land disturbing activity. Vegetation maintenance practices are not considered land disturbing activity. “Low ADT roadways and parking areas” means urban roads with ADT fewer than seven thousand five hundred vehicles per day; rural roads and freeways with ADT less than fifteen thousand vehicles per day; and parking areas with less than forty trip ends per one thousand square feet of gross building area or fewer than one hundred total trip ends per day are considered to be low-use traffic areas. Examples include most residential parking and employeeonly parking areas for small office parks or other commercial buildings. Urban roads are located within designated urban growth management areas; rural roads are located outside designated urban growth management areas. Free-ways, defined as fully controlled and partially controlled limited access highways, may be located either inside or outside of urban growth management areas. “Maintenance agreement” means a legally recorded document that acts as a property deed restriction, and that provides for long-term maintenance of stormwater BMPs. “Moderate ADT roadways and parking areas” means urban roads with ADT between seven thousand five hundred and thirty thousand vehicles per day; rural roads and freeways with ADT between fifteen thousand and thirty thousand vehicles per day; and parking areas with between forty and one hundred trip ends per one thousand square feet of gross building area or between one hundred and three hundred total trip ends per day are considered to be moderate-use traffic areas. Examples include visitor parking for small to medium commercial buildings with a limited number of daily customers. Urban roads are located within designated urban growth management areas; rural roads are located outside designated urban growth management areas. Freeways, defined as fully controlled and partially controlled limited access high-ways, may be located either inside or outside of urban growth management areas. “Moderate-use sites” means moderate ADT roadways and parking areas (see definition above); primary access points for high-density residential apartments; most intersections controlled by traffic signals; and transit center bus stops. These sites are expected to generate sufficient concentrations of metals that additional runoff treatment is needed to protect water quality in nonexempt surface waters. “Municipal separate storm sewer system” or “MS4” means a conveyance, or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains): (i) owned or operated by a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of wastes, storm water, or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under Section 208 of the CWA that discharges to waters of the United States; (ii) designed or used for collecting or conveying stormwater; (iii) which is not a combined sewer; and (iv) which is not part of a publicly owned treatment works (POTW) as defined at 40 CFR 122.2. “National Pollutant Discharge Elimination System” or “NPDES” means the national program for issuing, modifying, revoking, and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements, under Sections 307, 402, 318, and 405 of the Federal Clean Water Act, for the discharge of pollutants to surface waters of the state from point sources. These permits are referred to as NPDES permits and, in Washington State, are administered by the Washington State Department of Ecology. “New development” means land disturbing activities, including Class IV general forest practices development, including construction or installation of a building or other structure; creation of impervious surfaces; and subdivision, short subdivision and binding site plans, as defined and applied in Chapter 58.17 RCW. Projects meeting the definition of redevelopment shall not be considered new development. “Nonpoint source pollution” means pollution from any source other than from any discernible, confined, and discrete conveyances, and shall include, but not be limited to, pollutants from agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. “Nonstormwater discharge” means any discharge to the MS4 or public UIC that is not composed entirely of stormwater. “Nonstructural measure” means a stormwater control and treatment technique that uses natural processes, restoration or enhancement of natural systems, or design approaches to control runoff and/or reduce pollutant levels. Such measures are used in lieu of or to supplement structural practices on a land development site. Nonstructural measures include, but are not limited to: minimization and/or disconnection of impervious surfaces; development design that reduces the rate and volume of runoff; restoration or enhancement of natural areas such as riparian areas, wetlands, and forests; and on-lot practices such as rain barrels, cisterns, and vegetated areas that intercept roof and driveway runoff. “Owner(s)” or “property owner(s)” means the legal owner or owners of the property. As used herein, owner also refers to, in the appropriate context: (i) any other person authorized to act as the agent for the owner; (ii) any person who submits a stormwater management concept or design plan for approval or requests issuance of a permit, when required, authorizing land development to commence; and (iii) any person responsible for complying with an approved stormwater management design plan. “Permanent stormwater BMP” means a stormwater best management practice (BMP) that will be operational after the construction phase of a project and that is designed to become a permanent part of the site for the purposes of managing stormwater runoff. “Pollutant-generating impervious surfaces” or “PGIS” are surfaces that are considered to be significant sources of pollutants in stormwater runoff. Such surfaces include those that are subject to vehicular use, industrial activities, or storage of erodible or leachable materials that receive direct rainfall or run-on or blow-in of rainfall. Metal roofs are considered to be PGIS unless coated with an inert, nonleachable material. Roofs that are subject to venting of manufacturing, commercial or other indoor pollutants are also considered PGIS. A surface, whether paved or not, shall be considered PGIS if it is regularly used by motor vehicles. The following are considered regularly used surfaces: roads, unvegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unfenced fire lanes, vehicular equipment storage yards, and airport runways. “Private development” or “private” as used in this chapter shall mean any land development or redevelopment upon property other than property owned in fee or leased by the city, or a trust or authority of which the city is a beneficiary. It is understood that certain portions of private property upon which the city or a trust or authority of which the city is a beneficiary has an easement, right-of-way or street is also within the definition of public property. “Private inspector” means an independent agency or private entity that is retained by the applicant to conduct inspections and submit documentation to the director in accordance with this chapter, and that is certified by the director to conduct such inspections. “Public development” or “public” as used in this chapter shall mean any land development or redevelopment upon any real property, or interest therein, belonging to the city or a trust or authority of which the city is a beneficiary. Public development shall also include private development whenever all or a portion thereof will eventually be dedicated or provided for ownership, operation and/or maintenance to the city or a public trust or authority of which the city is a beneficiary. “Receiving stream or channel” means the body of water or conveyance into which stormwater runoff is discharged. “Recharge” means the replenishment of underground water reserves. “Redevelopment” means, on a site that is already substantially developed, the replacement or improvement of impervious surfaces, including buildings and other structures, and replacement or improvement of impervious parking and road surfaces, that is not part of a routine maintenance activity. (Any new impervious surfaces created by a redevelopment project are subject to the requirements for new development.) “Responsible party” means any individual, partnership, co-partnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or any other legal entity, or their legal representatives, agents, or assigns, that is named on a stormwater maintenance agreement as responsible for long-term operation and maintenance of one or more stormwater BMPs. “Retention” means the process of collecting and holding surface and stormwater runoff with no surface outflow. “Rural roads” means roads located outside designated urban growth management areas. “Special flood hazard area (SFHA)” means a Federal Emergency Management Agency (FEMA) identified high-risk flood area where flood insurance is mandatory for properties. An area having special flood, mudflow, or flood-related erosion hazards, and shown on a flood hazard boundary map or a flood insurance rate map as Zone A, AO, A1-A30, AE, A99, AH, AR, AR/A, AR/AE, AR/AH, AR/AO, AR/A1-A30, V1-V30, VE, or V. “Stop work order” means an order issued that requires that all construction activity on a site be stopped. “Stormwater authority” means the department or agency, and its authorized agents, which is responsible for coordinating the review, approval, and permit process as defined by this chapter. “Stormwater best management practice (BMP)” means the schedules of activities, prohibitions of practices, maintenance procedures, and structural and/or managerial practices approved by Ecology that, when used singly or in combination, prevent or reduce the release of pollutants and other adverse impacts to receiving waters. “Stormwater management” means the use of structural or nonstructural practices that are designed to reduce stormwater runoff pollutant loads, discharge volumes, peak flow discharge rates and detrimental changes in stream temperature that affect water quality and habitat. “Stormwater runoff” or “stormwater” means runoff during and following precipitation and snowmelt events, including surface runoff, drainage and interflow. “Stream” means an area where surface waters flow sufficiently to produce a defined channel or bed. A defined channel or bed is an area that demonstrates clear evidence of the passage of water including, but not limited to, hydraulically sorted sediments, or the removal of vegetative litter or loosely rooted vegetation by the action of moving water. The channel or bed need not contain water year-round. This definition is not meant to include irrigation ditches, canals, stormwater runoff devices or other entirely artificial watercourses, unless they are used to convey streams naturally occurring prior to construction. Those topographic features that resemble streams but have no defined channels (i.e., swales) shall be considered streams when hydrologic and hydraulic analyses done pursuant to a development proposal predict formation of a defined channel after development. “Structure” means anything constructed or erected, even partially, including buildings, which requires location on the ground or attached to something having a location on the ground. “Underground injection control” or “UIC” or “UIC well” means a manmade subsurface fluid distribution system designed to discharge fluids into the ground and consists of an assemblage of perforated pipes, drain tiles, or other similar mechanisms, or a dug hole that is deeper than the largest surface dimension. UICs can be publicly or privately owned. “Upland flow” means stormwater runoff from lands upslope of a project site. “Urban roads” means roads located within designated urban growth management areas. Partially controlled limited access highways located inside of urban growth management areas are considered urban roads. “Water quality volume (WQv)” means the storage needed to capture and treat ninety percent of the average annual stormwater runoff volume. Numerically, WQv will vary as a function of long-term rainfall statistical data. “Waters of the state” includes those waters as defined as “waters of the United States” in 40 CFR 122.2 within the geographic boundaries of Washington State and “waters of the state” as defined in RCW Chapter 90.48 which includes: lakes, rivers, ponds, streams, inland waters, underground waters, salt waters and all other surface waters and water courses within the jurisdiction of the state of Washington. “Wetland” or “wetlands” means that area inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs and similar areas. Wetlands do not include those artificial wetlands intentionally created from nonwetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities. However, wetlands may include those artificial wetlands specifically intentionally created from nonwetland areas to mitigate conversion of wetlands, if permitted by the city.

( Ord. 2010-08 § 1 (part), 2010 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.