For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.83.130 — Procedures and requirements

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.83.130

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/5f5e4e7c-807b-4379-b2b0-cef4a20183cd

§ 7.83.130: Procedures and requirements.

(1) Stormwater Site Plan Required. A stormwater site plan containing all appropriate information as specified in this chapter shall be submitted to the director in conjunction with the final subdivision plat, final site plan, construction plan, or any other land development plan subject to this chapter, as described in YMC § 7.83.020. (2) Stormwater Site Plan Content. The stormwater site plan must ensure that the requirements and criteria in this chapter are being complied with and that opportunities are being taken to minimize adverse postdevelopment stormwater runoff impacts from the project. Stormwater site plans generally contain maps, charts, graphs, tables, photographs, narrative descriptions, explanations, citations to supporting references, a record of all major permit decisions, and other information as may be necessary for a complete review of the plan as determined by the director. Minimum plan contents include: a) Common address, parcel number(s), and legal description of site. b) Existing Conditions Evaluation. The existing conditions evaluation for topography, drainage patterns and contributory areas, soils, ground cover, presence of critical areas, adjacent areas, existing development, existing stormwater facilities, and adjacent on- and off-site utilities shall include: a topographic map of existing site conditions with the drainage basin(s) boundaries indicated; acreage, soil types and land cover of areas for each subbasin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used to analyze the site hydrology of the existing conditions. 1. Projects shall use a maximum contour interval of two feet. 2. Contour intervals of less than two feet may be required in flat locations to demonstrate current and proposed drainage performance and siting of facilities. 3. At the discretion of the city, larger scale projects or those located in areas of sufficient relief, such as a large lot subdivision, may use the best available topographic information; this may involve contours on a scale larger than the two-foot minimum. 4. Site limitations shall be identified, including: I. Areas with high potential for erosion and sediment deposition (based on soil properties, slope, etc.); II. Locations of sensitive and critical areas (e.g., vegetative buffers, wetlands, steep slopes, floodplains, geologic hazard areas, streams, etc.); III. Observation of potential runoff contribution from off-site basins; IV. Adjacent properties and/or projects that have a history of stormwater problems, noting whether the cause of the problem(s) has been determined; and V. Adjacent properties and/or projects where geotechnical investigations have identified shallow bedrock, high groundwater, seasonally perched groundwater, or clay lenses in the substrata. 5. Geotechnical Site Characterization Report. A geotechnical site characterization and report is required to demonstrate suitability of a site for stormwater disposal. A geotechnical site characterization is required for: I. Projects proposing infiltration (drywells, detention facilities receiving credit for pond bottom infiltration, etc.) or nonstandard drainage systems; II. Projects located within or draining to a problem drainage area, flood-prone basin, or study area as determined by the director; III. Projects with administrative conditions requiring a geotechnical site characterization; IV. In areas where there has been a long-standing record of satisfactory performance of standard subsurface disposal facilities and no drainage problems are known to exist, the geotechnical site characterization requirement may be reduced or waived after a formal written request from the project proponent’s engineer has been reviewed and accepted by the director; V. When subsurface disposal is proposed: • | Test borings and/or test pits are required and shall be located within the footprint of proposed stormwater disposal facilities; • | For each facility, a minimum of one subsurface exploration shall be performed for up to one thousand two hundred square feet of disposal area. Another subsurface exploration shall be performed for each additional fifteen thousand square feet, or fraction thereof, of disposal area. For a linear roadside swale, a minimum of one subsurface exploration shall be performed every five hundred feet, staggered on both sides of the road, unless site conditions or test results indicate that additional explorations are necessary. Subsurface explorations and sampling shall be conducted according to applicable standards of the American Society for Testing and Materials (ASTM); • | Subsurface explorations shall be to a depth as recommended by the geotechnical engineer. c) Permanent Stormwater Control Plan. The description, scaled drawings and design calculations for the proposed postdevelopment condition shall be identified in a permanent stormwater control plan, that shall include: 1. Drainage Report. I. A map and/or drawing or sketch of the stormwater management facilities, including the location of non-structural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlets and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; II. A narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system; III. A hydrologic and hydraulic analysis of the stormwater management system demonstrating system performance for all hydraulic, treatment and disposal facilities for applicable design storms, including supporting calculations to show that the facility is designed according to the applicable design criteria (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); IV. Documentation and supporting calculations to show that the permanent stormwater control plan adequately meets the performance criteria in this chapter; and, where applicable; V. A narrative describing how the permanent storm-water control plan corresponds with any applicable water-shed protection plans or total maximum daily load (TMDL) requirements. 2. Stormwater Construction Plans. Construction drawings showing elevations and hydraulic grade lines for all existing and proposed stormwater elements including, but not limited to, stormwater drains, pipes, culverts, catch basins, channels, treatment BMPs, retention BMPs, disposal and overflow facilities, and areas of overland flow. d) Postdevelopment Downstream Analysis. Development projects that propose to discharge stormwater or upland flow off-site are required to submit a downstream analysis report that assesses the potential off-site water quality, erosion, slope stability, and drainage impacts associated with the project and that proposes appropriate mitigation of those impacts. An initial qualitative analysis should extend downstream for the entire flow path from the project site to the receiving water, or up to one mile or to a point where the impact to receiving waters is minimal or nonexistent, as determined by the local jurisdiction. If a receiving water is within one-quarter mile, the analysis should extend within the receiving water to one-quarter mile from the project site. The analysis should extend one-quarter mile beyond any improvements proposed as mitigation. The analysis should extend upstream to a point where backwater effects created by the project cease. Upon review of the qualitative analysis, the city may require that a quantitative analysis be performed. e) Construction Stormwater Pollution Prevention Plan. Projects meeting the regulatory threshold and not qualifying for an erosivity waiver shall prepare a stormwater pollution prevention plan (SWPPP) for construction activity in accordance with the city construction stormwater runoff ordinance, YMC Chapter 7.82. The SWPPP shall be implemented beginning with initial soil disturbance and continue until final stabilization. Stormwater BMPs shall be consistent with the Stormwater Management Manual for Eastern Washington (2004), approved local equivalent, or another technical stormwater manual approved by the city. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls. f) Requirement for Maintenance Agreement and Plan. If a stormwater site plan requires structural or nonstructural measures, the owner shall execute a stormwater maintenance agreement prior to the city granting final approval for the plan, or any plan of development or other development for which a permit is required under this chapter. The agreement shall be recorded in the office of the county auditor and shall run with the land. 1. Required Elements for Maintenance Agreement and Plan. The stormwater maintenance agreement shall be in a form approved by the city, and shall, at a minimum: I. Designate Responsible Party. Designate for the land development the owner, governmental agency, or other legally established entity (responsible party) which shall be permanently responsible for maintenance of the structural or nonstructural measures required by the plan. II. Pass Responsibility to Successors. Pass the responsibility for such maintenance to successors in title. III. Right of Entry for Stormwater Authority. Grant the city and its representatives the right of entry for the purposes of inspecting all stormwater BMPs at reasonable times and in a reasonable manner; provided, that if such property be occupied and not a public place he shall first present proper credentials, request permission to enter, state the reason for the request, and, if such property is unoccupied, he shall first make a reasonable effort to locate the owners or other persons having charge or control of the property and request permission to enter. If such entry is refused, the city shall have recourse to every remedy provided by law to secure entry. The right of entry authorized for this section extends to any employee, officer, or authorized representative that accompanies the director or his designated representative. IV. Maintenance Plan. The project shall ensure the continued performance of the maintenance obligations required by the plan and this chapter through a maintenance plan (which may be an attachment to the actual maintenance agreement). The plan shall include a list of inspection and maintenance tasks, a schedule for routine inspection and maintenance, actions to be taken when maintenance is required, and other items listed in the Stormwater Management Manual for Eastern Washington, or approved local equivalent. 2. Maintenance Access Easements. The applicant must ensure access from public right-of-way to stormwater management facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair. Such access shall be sufficient for all necessary equipment for maintenance activities. A proper surface to accommodate these vehicles shall be provided and maintained by the property owner. Access shall not be blocked by fences. The property owner should not plant landscaping or construct permanent or temporary structures within the easement. In the event that access or repairs cause the removal of any fences, structures or landscaping, the property owner shall assume the risk and costs associated with the removal and/or replacement. In addition, the owner shall assume all liability for any claims filed in association with property damage caused directly from flooding in which the city’s ability to access and maintain the facility was blocked or hampered by the property owner. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property. g) Application Requirements. Applications shall be submitted and considered in the manner established by the city project permit application process, YMC Chapter 16.04, and as follows: 1. Substantive Changes to Plan. No substantive changes shall be made to an approved plan without review and written approval by the director. The director may request additional data with a plan amendment as may be necessary for a complete review of the plan and to ensure that changes to the plan will comply with the requirements of this chapter. 2. Expiration of Plan Approval. The stormwater management design plan’s approval expires in one year from the date of approval unless a final plat is recorded or unless work has actually begun on the site. The recordation of a final plat for a section of a subdivision (or initiation of construction in a section) does not vest the approval of the stormwater site plan for the remainder of the subdivision. If the stormwater site plan expires, the applicant shall file with the director for reapproval of the stormwater management design plan. (3) Plan Preparation and Certification. a) Certification by Plan Preparer. The stormwater site plan shall be prepared by a professional engineer licensed to practice in Washington State and must be signed by the professional preparing the plan, who shall certify that the design of all stormwater BMPs meets the requirements of this chapter. b) Certification by Owner. The owner shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan. (4) Coordination with Other Approvals and Permits. a) Approval of Other Permits. No grading or building permit shall be issued for land development subject to this chapter without approval of a stormwater management design plan. b) Coordination with Other Plans. Approval of the stormwater site plan shall be coordinated by the director with approval of a construction stormwater pollution prevention plan (SWPPP) with regard to the location, schedule, and/or phasing for temporary and permanent stormwater management measures. If natural drainage features or other natural areas are to be preserved, then these areas must be shown and measures provided for their protection on both the construction SWPPP and the stormwater site plan. If other elements of the stormwater site plan utilize soils, vegetation, or other natural features for infiltration or treatment, then these areas must be shown on the construction SWPPP plan and measures provided for their protection during construction. c) Other Permits or Approvals May Be Needed. Approvals issued in accordance with this chapter do not relieve the applicant of responsibility for obtaining all other necessary permits and/or approvals from other federal, state, and/or local agencies. If requirements vary, the most restrictive shall prevail. These permits may include, but are not limited to: construction stormwater discharge permits, applicable state and federal permits for stream and wetland impacts, and applicable dam safety permits. Applicants are required to show proof of compliance with these regulations before the city code administration will issue a grading, building, or zoning permit. d) Stormwater Measures within Floodplain. Construction of stormwater measures or facilities within a Federal Emergency Management Agency (FEMA) designated floodplain shall be avoided to the extent possible. When this is unavoidable, all stormwater BMP construction shall be in compliance with all applicable requirements of the city’s critical areas, shorelines, floodway, floodplain and building codes. (5) Storm Drainage Easements. a) Easement Need. Storm drainage easements shall be required where: a development or redevelopment is traversed by a watercourse, drainageway, channel or stream; any stormwater detention, retention or infiltration facility or any other stormwater BMP is located on private property. The following conditions shall apply to all easements: b) Easement Configuration. A stormwater easement or drainage right-of-way shall conform substantially with the lines of a watercourse. c) Where no conveyance system exists at the adjacent down-gradient property line or watercourse, and the discharge was previously unconcentrated flow or significantly lower concentrated flow, then measures must be taken to prevent down-gradient impacts. d) Easement Dimensions. Easements shall be of a width for construction, or maintenance, or both, as will be adequate for the purpose. Parallel streets or parkways may be required in connection therewith. e) Easements Approved at the Time of Approval of Final Plat. Easements shall be approved by the director at the time of approval of a final plat and shall be recorded with the city and on all property deeds. f) Deeds of Easement. A deed of easement shall be recorded along with the final plat specifying the rights and responsibilities of each party to the easement. (6) Performance Bond or Guarantee. a) Performance Bond or Guarantee Required. No stormwater site plans shall be approved for public projects subject to this chapter unless the applicant furnishes a performance bond or guarantee. This is to ensure that action can be taken by the city, at the applicant’s expense, should the applicant fail to initiate or maintain those measures identified in the approved stormwater site plan (after being given proper notice and within the time specified by the director). If the city takes such action upon such failure by the applicant, the city shall collect from the applicant the difference should the amount of reasonable cost of such action exceed the amount of the security held. b) Term of Performance Bond or Guarantee. The performance bond or guarantee furnished pursuant to YMC § 7.83.130(6)(a), or the unexpended or unobligated portion thereof, shall be returned to the applicant within sixty days of the final acceptance of the permanent storm-water BMP by the director. c) Term Extended for Initial Maintenance. At the discretion of the director, the performance bond or guarantee may be extended beyond the time period specified above to cover a reasonable period of time for testing the practices during storm events and for initial maintenance activities. For the purposes of this section, the time shall not exceed two years. d) Partial Release of Bond. The director shall have the discretion to adopt provisions for a partial pro-rata release of the performance bond or guarantee on the completion of various stages or phases of development. (7) As-Built Plans. a) As-Built Plans Required. All applicants are required to submit as-built plans for any permanent stormwater management facilities located on-site after final construction is completed. The plan must show the final design specifications for all stormwater management facilities, meet the criteria for as-built plans in the Stormwater Management Manual for Eastern Washington, or approved local equivalent, and be sealed by a registered professional engineer. A final inspection by the director is required before any performance bond or guarantee will be released. (8) Fees. a) Fee Authority. The city may obtain with each submission an application fee established by the director to cover expenses connected with the review of the stormwater site plan and a technical review fee sufficient to cover professional review services for the project. The director is authorized to retain a registered professional engineer or other professional consultant to advise the director on any or all aspects of these plans. 1. Applicants must pay review fees before the review process may begin. 2. Application fees are payable at the time of application and are nonrefundable. 3. Application fees shall be calculated by the director in accordance with the fee schedule below. 4. These fees are in addition to any other local or state fees that may be charged under any other law, bylaw, or local ordinance. b) Application Fees. 1. | Post-Construction Stormwater: one stormwater site plan review, one review of maintenance agreement, one review of easements, one review of performance bond, coordination with other approvals and permits, and one post-construction inspection for acceptance. | None at this time 1. A nonrefundable application fee shall be due and payable to the city at the time an application is filed. The application fee will provide up to eight hours of services for administration, review, inspection, and monitoring for each project. 2. The director may require any applicant to pay an additional fee per hour for review, inspection and monitoring services for any project filing that requires an excess of eight hours of administration, review, inspection, and monitoring time by city staff member(s). Said fee shall be the hourly salary rate plus benefits for each city staff member doing this additional work multiplied by the number of additional hours, plus any equipment and administrative fees. c) Revision of Fee Schedules and Regulations Governing Fees. 1. The director may review and propose revision to its regulations and fee schedules periodically as it sees fit. I. Amendments shall be preceded by a public hearing. II. The schedule of fees and charges proposed by the director shall be adopted by the city council and established in this chapter and may be altered or amended only by the city council. d) Automatic Fee Schedule Adjustment. 1. Beginning on January 1, 2012, and each successive January 1st thereafter, the city fee schedule adopted as a part of this title shall automatically be adjusted to account for any change in the consumer price index (CPI) as established by the U.S. Department of Commerce for the Seattle Metropolitan Area. The twelve-month period utilized to establish the fee schedule adjustment will be as established by the Department of Commerce for the Seattle CPI. Fees adjusted in this manner may be rounded to the nearest five-dollar increment. This section shall not preclude the city from modifying the base fee, where the city council finds it necessary to do so.

( Ord. 2010-08 § 1 (part), 2010 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.