§ 7.83.150 — Project inspection for permanent stormwater BMPs
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.83.150
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/c0699c60-ed30-48a9-91b0-b4d968025999
§ 7.83.150: Project inspection for permanent stormwater BMPs.
(1) Notice of Project Commencement. a) The applicant must notify the director at least twenty-four hours before the commencement of construction of stormwater elements on all projects. In addition, the applicant must notify the director in advance of construction of critical components of the stormwater practices on the approved stormwater management design plan. (2) Project Inspections by Code Enforcement or Its Representatives. a) The director shall conduct periodic inspections of the stormwater practices shown on the approved stormwater management design plan, and especially during critical installation and stabilization steps. All inspections shall be documented in writing. The inspection shall document any variations or discrepancies from the approved plan, and the resolution of such issues. A final inspection by the director is required before any performance bond or guarantee, or portion thereof, shall be released. (3) Inspection by Certified Inspector. a) At its discretion, the director may authorize the use of private inspectors to conduct and document inspections during project construction. Such private inspectors shall submit all inspection documentation in writing to the director or designated representative. All costs and fees associated with the use of private inspectors shall be the responsibility of the applicant. b) If the use of private inspectors is authorized, the city shall maintain a training and certification program, authorize inspectors trained by an Ecology-approved training program, or authorize another entity to maintain such a program. All private inspectors shall be certified prior to conducting any inspections or submitting any inspection documentation to the city. c) If private inspectors are utilized, then inspections by the director may be reduced in frequency. However, the director shall remain the responsible entity for ultimate inspection, approval, and acceptance of all stormwater BMPs, and for issuance of the certificate of completion in accordance with the following section. (4) Stormwater Certificate of Completion. a) Subsequent to final installation and stabilization of all stormwater BMPs shown on the stormwater management design plan, submission of all necessary as-built plans, and final inspection and approval by the director, the director shall issue a stormwater certificate of completion for the project. In issuing such a certificate, the director shall determine that all work has been satisfactorily completed in conformance with this chapter. b) Issuance of a stormwater certificate of completion shall be required for the owner to receive a certificate of occupancy.
( Ord. 2010-08 § 1 (part), 2010 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.