§ 18-94 — Fee required
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 18-94
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/9c5185e1-89dd-4d28-b632-8ecdec9def8f
Sec. 18-94. - Fee required.
(a) Upon application for a building permit, the applicant shall pay to the chief building inspector the fee required by this division. In this division, "cubic contents" means that volume of building enclosed by the outer surface of the exterior walls from the top of the footing to the roof. "Gross square footage" calculations are based on exterior dimensions, including garage and each floor level, excluding unfinished basements or portions thereof. (b) Where a permit is required under this article and work is started or proceeded with prior to obtaining the permit, the fees as specified in this division shall be doubled, but the payment of such double fee shall not relieve any person from fully complying with the requirements of this article or from prosecution for violation thereof. No new application for a permit will be accepted from an applicant who has failed to pay all fees and additional fees for previous permits, nor shall any further inspection be made until such fees have been fully paid.
(Code 1973, § 30.50.010; Ord. No. 6-92, pt. 16, 3-3-92; Ord. No. 4-94, pt. 1, 3-15-94)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
