For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 98-306 — Technical standards

Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 98-306

Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/43d35e1a-1f4d-4386-affe-fbb2672254e6

Sec. 98-306. - Technical standards.

(a) Design criteria, standards and specifications. All BMPs required to comply with this article shall meet the design criteria, standards and specifications based on any of the following: (1) Applicable design criteria, standards and specifications identified in the Wisconsin Construction Site Best Management Practice Handbook, WDNR Pub. WR-222 November 1993 Revision. (2) Other design guidance and technical standards identified or developed by the WDNR under subchapter V of chapter NR 151, Wisconsin Administrative Code. (3) For this article, average annual basis is calculated using the appropriate annual rainfall or runoff factor, also referred to as the R factor, or an equivalent design storm using a type II distribution, with consideration given to the geographic location of the site and the period of disturbance. (b) Other standards. Other technical standards not identified or developed in subsectiion (a) may be used, provided that the commissioner has approved the methods.

(Ord. No. 20-04, pt. 1, 8-2-04)

Ask a question about Racine law

Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.