§ 98-309 — Erosion and sediment control plan, statement, and amendments
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 98-309
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/e27cab82-9fac-44cb-ba7f-a1890fab160c
Sec. 98-309. - Erosion and sediment control plan, statement, and amendments.
(a) Erosion and sediment control plan. (1) The responsible party shall prepare an erosion and sediment control plan and submit it to the commissioner. (2) The erosion and sediment control plan shall be designed to meet the performance standards in section 98-307 and other requirements of this article. (3) The erosion and sediment control plan shall address pollution caused by soil erosion and sedimentation during construction and through final stabilization of the site. The erosion and sediment control plan shall include, at a minimum, the following items: a. The name(s) and address(es) of the owner or developer of the site and of any consulting firm retained by the applicant, together with the name of the applicant's principal contact at such firm and the start and end dates for construction. b. Description of the site and the nature of the construction activity, including representation of the limits of land disturbance on a United States Geological Service 7.5 minute series topographic map. c. A sequence of construction of the development site, including stripping and clearing; rough grading; construction of utilities, infrastructure and buildings, and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation. d. Estimates of the total area of the site and the total area of the site that is expected to be disturbed by construction activities. e. Estimates, including calculations, if any, of the runoff coefficient of the site before and after construction activities are completed. f. Calculations to show the expected percent reduction in the average annual sediment load carried in runoff as compared to no sediment or erosion controls. g. Existing data describing the surface soil as well as subsoils. h. Depth to groundwater, as indicated by Natural Resources Conservation Service soil information, where available. i. Name of the immediate named receiving water from the United States Geological Service 7.5 minute series topographic maps. (4) The erosion and sediment control plan shall include a site map which shall show the location of the site within the city. The site map shall include the following items and shall be at a scale not greater than 50 feet per inch and at a contour interval not to exceed two feet. a. Existing topography, vegetative cover, natural and engineered drainage systems, roads and surface waters. Lakes, streams, wetlands, channels, ditches and other watercourses on and immediately adjacent to the site shall be shown. Any identified 100-year flood plains, flood fringes and floodways shall also be shown. b. Boundaries of the construction site. c. Drainage patterns and approximate slopes anticipated after major grading activities. d. Areas of soil disturbance. e. Location of major structural and non-structural controls identified in the plan. f. Location of areas where stabilization practices will be employed. g. Areas which will be vegetated following construction. h. A real extent of wetland acreage on the site and locations where stormwater is discharged to a surface water or wetland. i. Locations of all surface waters and wetlands within one mile of the construction site. j. An alphanumeric or equivalent grid overlying the entire construction site map. (5) Each erosion and sediment control plan shall include a description of appropriate controls and measures that will be performed at the site to prevent pollutants from reaching waters of the state. The plan shall clearly describe the appropriate control measures for each major activity and the timing during the construction process that the measures will be implemented. The description of erosion controls shall include, when appropriate, the following minimum requirements: a. Description of interim and permanent stabilization practices, including an implementation schedule. Site plans shall ensure that existing vegetation is preserved where attainable and that disturbed portions of the site are stabilized. b. Description of structural practices to divert flow away from exposed soils, store flows or otherwise limit runoff and the discharge of pollutants from the site. Unless otherwise specifically approved in writing by the commissioner, structural measures shall be installed on upland soils. c. Management of overland flow at all sites, unless otherwise controlled by outfall controls. d. Trapping of sediment in channelized flow. e. Staging construction to limit bare areas subject to erosion. f. Protection of downslope drainage inlets where they occur. g. Minimization of tracking at all sites. h. Clean up of off-site sediment deposits. i. Proper disposal of building and waste materials at all sites. j. Stabilization of drainage ways. k. Control of soil erosion from dirt stockpiles. l. Installation of permanent stabilization practices as soon as possible after final grading. m. Minimization of dust to the maximum extent practicable. (6) The erosion and sediment control plan shall require that velocity dissipation devices be placed at discharge locations and along the length of any outfall channel, as necessary, to provide a non-erosive flow from the structure to a watercourse so that the natural physical and biological characteristics and functions are maintained and protected. (b) Erosion and sediment control plan statement. For each construction site identified under subsection 98-304(a((3), the responsible party shall prepare an erosion and sediment control plan and submit the statement to the commissioner. The statement shall briefly describe the site, including a site map. Further, it shall also include the best management practices that will be used to meet the requirements of the article, including the site development schedule. (c) Amendments. The applicant shall amend the plan if any of the following occur: (1) There is a change in design, construction, operation or maintenance at the site which has the reasonable potential for the discharge of pollutants to waters of the state and which has not otherwise been addressed in the plan. (2) The actions required by the plan fail to reduce the impacts of pollutants carried by construction site runoff. (3) The commissioner notifies the applicant of changes needed in the plan.
(Ord. No. 20-04, pt. 1, 8-2-04)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
