Sec. 98-308. - Permitting requirements, procedures and fees.
(a) Permit required. No responsible party may commence a land disturbing construction activity subject to this article without first receiving approval of an erosion and sediment control plan for the site and a permit from the commissioner. (b) Permit application and fees. At least one responsible party desiring to undertake a land disturbing construction activity subject to this article shall submit an application for a permit and an erosion and sediment control plan that meets the requirements of section 98-309, and shall pay an application fee to the commissioner as established by the common council. By submitting an application, the applicant is authorizing the commissioner to enter the site to obtain information required for the review of the erosion and sediment control plan. (c) Review and approval of permit application. The commissioner shall review any permit application that is submitted with an erosion and sediment control plan, and the required fee. The following approval procedure shall be used: (1) Within 30 days after receipt of a complete permit application, as required by subsection (b), the commissioner shall inform the applicant whether the application and plan are approved or disapproved based on the requirements of this article. (2) If the permit application and plan are approved, the commissioner shall issue the permit. (3) If the permit application or plan is disapproved, the commissioner shall state in writing the reasons for disapproval. (4) The commissioner may request additional information from the applicant. If additional information is submitted, the commissioner shall have 30 days from the date the additional information is received to inform the applicant that the plan is either approved or disapproved. (5) Failure by the commissioner to inform the permit applicant of a decision within 40 days of a required submittal shall be deemed to mean approval of the submittal and the applicant may proceed as if a permit had been issued. (d) Bond. As a condition of approval and issuance of the permit, the commissioner may require the applicant to deposit a surety bond, cash bond or irrevocable letter of credit to guarantee good faith execution of the approved erosion control plan and any permit conditions, all of which work shall be completed not later than 12 months after issuance of the occupancy permit or expiration of the building permit or other construction authorization, or any extension thereof. If, upon inspection, such work is complete, the bond or letter of credit shall be promptly released or the cash bond promptly returned. If such work has not been completed within the prescribed period, the commissioner may have the surety perform such work, or may go on the land and commence the work after issuing the responsible party a notice of intent to have such work performed. The cost of the work performed by the commissioner, under contract, plus interest at the rate authorized by the common council, shall be invoiced to the responsible party. Funds from the surety, the letter of credit or cash bond shall also be used therefor. If a responsible party fails to pay the amount due within the period specified, the clerk shall enter the amount due on the tax rolls and collect it as a special assessment against the property, pursuant to Wis. Stats., ch. 66, subch. VII. (e) Permit requirements. All permits shall require the responsible party to: (1) Notify the commissioner within 48 hours of commencing any land disturbing construction activity. (2) Notify the commissioner of completion of any BMPs within 14 days after their installation. (3) Obtain permission in writing from the commissioner prior to any modification of the erosion and sediment control plan pursuant to subsection 98-309(3). (4) Install all BMPs as identified in the approved erosion and sediment control plan. (5) Maintain all road drainage systems, stormwater drainage systems, BMPs and other facilities identified in the erosion and sediment control plan. (6) Repair any siltation or erosion damage to adjoining surfaces and drainage ways resulting from land disturbing construction activities and document repairs in a site erosion control log. (7) Inspect the BMPs within 24 hours after each rain of 0.5 inches or more which results in runoff during active construction periods, and at least once each week make needed repairs and document the findings of the inspections in a site erosion control log with the date of inspection, the name of the person conducting the inspection, and a description of the present phase of the construction at the site. (8) Allow the commissioner to enter the site for the purpose of inspecting compliance with the erosion and sediment control plan or for performing any work necessary to bring the site into compliance with the control plan. (9) Keep a copy of the erosion and sediment control plan at the construction site. (f) Permit conditions. Permits issued under this section may include conditions established by the commissioner in addition to the requirements set forth in subsection (e) where necessary to assure compliance with the performance standards in section 98-307. (g) Permit duration. Permits issued under this section shall be valid for a period of 180 days, or the length of the building permit or other construction authorizations, whichever is longer, from the date of issuance. The commissioner may extend the period one or more times for up to an additional 180 days. The commissioner may require additional BMPs as a condition of the extension if they are necessary to meet the requirements of this article. (h) Maintenance. The responsible party throughout the duration of the construction activities shall maintain all BMPs necessary to meet the requirements of this article until the site has undergone final stabilization.
(Ord. No. 20-04, pt. 1, 8-2-04; Ord. No. 1-05, pt. 8, 2-1-05)