§ 933.29 — SAMPLING
Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 933.29
Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/6f371ef4-2ff9-459d-8274-6df044112751
933.29. - SAMPLING.
The strength of any industrial waste, the discharge of which is to be subject to surcharge, shall be determined monthly, or more frequently, from samples taken at the manhole described in section 933.42 or at any other sampling point mutually agreed to by the board and the producer of such waste. The frequency and duration of the sampling period shall be as such, in the opinion of the board, will permit a reasonably reliable determination of the average composition of the wastes, exclusive of storm water runoff. Representative samples of the wastewater discharge shall be collected by a representative of the board, in proportion to the flow of waste, exclusive of storm water runoff, and composited for analysis in accordance with the current revision of 40 CFR 136. Upon request by the industrial user, the board may split samples with the industrial user for their own analysis. Except as hereinafter provided, the strength of the waste, so found by analysis, shall be used for establishing the surcharge or surcharges. However, the board may, if it so elects, accept the results of routine sampling and analyses by the producer of such wastes in lieu of, or in addition to, making its own samplings and analyses.
(Ord. No. 2025-O-08, 4-14-25)
Ask a question about Huntington law
Corpus searches the Huntington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
