For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 933.34 — PERMIT APPLICATION

Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 933.34

Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/851df5b3-91ae-4903-89ce-c0557752655a

933.34. - PERMIT APPLICATION.

1. Individual wastewater discharge and general permitting: new connections. Any user required to obtain an individual wastewater discharge permit, or a general permit, who proposes to begin or recommence discharging into the POTW must obtain such permit prior to the beginning or recommencing of such discharge. An application for this individual wastewater discharge permit or general permit, in accordance with this article, must be filed at least 180 days prior to the date upon which any discharge will begin or recommence. 2. Individual wastewater discharge and general permit application contents. A. All users required to obtain an individual wastewater discharge permit must submit a permit application. Users that are eligible may request a general permit under section 933.34(3). The board may require users to submit all or some of the following information as part of a permit application: (a) Identifying information. 1. The name and address of the facility, including the name of the operator and owner. 2. Contact information, description of activities, facilities, and plant production processes on the premises; (b) Environmental permits. A list of any environmental control permits held by or for the facility. (c) Description of operations. 1. A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications (SIC) of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes. 2. Types of wastes generated as determined by a reliable analytical laboratory; licensed and certified by the WVDEP; sampling and analysis shall be performed in accordance with the procedures established by the EPA pursuant to section 304 of the Act and contained in 40 CFR, part 136 as amended; and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; 3. Number and type of employees, hours of operation, and proposed or actual hours of operation; 4. Type and amount of raw materials processed (average and maximum per day); 5. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; (d) Time and duration of discharges; (e) The location for monitoring all wastes covered by the permit; (f) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in section 933.12(c) (40 CFR 403.6(e)). (g) Measurement of pollutants. 1. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. 2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the board, of regulated pollutants in the discharge from each regulated process. 3. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. 4. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 933.41 of this article. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the board or the applicable standards to determine compliance with the standard. 5. Sampling must be performed in accordance with procedures set out in section 933.4 l(k) of this article. (h) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on section 933.41(d)(2) [40 CFR 403.12(e)(2)]. (i) Any request to be covered by a general permit based on section 933.34(3). (j) Any other information as may be deemed necessary by the board to evaluate the permit application. B. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. 3. Wastewater discharge permitting: general permits. A. At the discretion of the board, the board may use general permits to control SIU discharges to the POTW if the following conditions are met. All facilities to be covered by a general permit must: (1) Involve the same or substantially similar types of operations; (2) Discharge the same types of wastes; (3) Require the same effluent limitations; (4) Require the same or similar monitoring; and (5) In the opinion of the board, are more appropriately controlled under a general permit than under individual wastewater discharge permits. B. To be covered by the general permit, the SIU must file a written request for coverage that identifies its contact information, production processes, the types of wastes generated, the location for monitoring all wastes covered by the general permit, any requests in accordance with section 933.41(d)(2) for a monitoring waiver for a pollutant neither present nor expected to be present in the discharge, and any other information the POTW deems appropriate. A monitoring waiver for a pollutant neither present nor expected to be present in the discharge is not effective in the general permit until after the board has provided written notice to the SIU that such a waiver request has been granted in accordance with section 933.41(d)(2). C. The board will retain a copy of the general permit, documentation to support the POTW's determination that a specific SIU meets the criteria in section 933.34 (3)(A)(l-5) and applicable state regulations, and a copy of the user's written request for coverage for three years after the expiration of the general permit. [See 40 CFR 403.8(1(1 )(iii)(A)(l) through (5).] D. The board may not control an SIU through a general permit where the facility is subject to production-based categorical pretreatment standards or categorical pretreatment standards expressed as mass of pollutant discharged per day or for lUs whose limits are based on the combined wastestream formula (section 933.12(c)) or net/gross calculations (section 933.12(d)). [See 40 CFR 403.6(e) and 40 CFR 403.15) 4. Application signatories and certifications. A. All wastewater discharge permit applications, user reports and certification statements must be signed by an authorized representative of the user and contain the certification statement in section 933.41(n). B. If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the board prior to or together with any reports to be signed by an authorized representative. C. A facility determined to be a non-significant categorical industrial user by the board pursuant to section 933.02(66)(3) must annually submit the signed certification statement in section 933.41(n). [See 40 CFR 403.3(V)(2)] 5. Individual wastewater discharge and general permit decisions. The board will evaluate the data furnished by the user and may require additional information. Within 90 days of receipt of a complete permit application, the board will determine whether to issue an individual wastewater discharge permit or a general permit. The board may deny any application for an individual wastewater discharge permit or a general permit.

(Ord. No. 2025-O-08, 4-14-25)

Ask a question about Huntington law

Corpus searches the Huntington sections it holds and shows the ones that match, with their citations. Free, no sign-in.