§ 933.30 — CHLORINE REQUIREMENT
Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 933.30
Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/8be0de0d-aaf8-4225-b58f-4242f8cbf239
933.30. - CHLORINE REQUIREMENT.
In the event any industrial waste, the average volume of which exceeds 40,000 cubic feet per month, is found by the board to have a chlorine requirement in excess of 25 parts per million, or 25 ppm, the producer of such waste shall be surcharged an amount equal to the product of the actual volume of wastes in 100 cubic feet per billing period, exclusive of storm water runoff, discharged to the POTW and the "chlorine requirement surcharge rate". The "chlorine requirement surcharge rate" shall be determined by the following formula: Re = 0.00626 Pc (C-25) Where Re = the chlorine requirement surcharge rate in cents per 100 cubic feet of waste discharged Pc = the average cost of chlorine to the city in cents per pound C = the average chlorine requirement of the industrial waste expressed in parts per million (ppm) as determined in accordance with sections 933.29 or 933.31. The figure 25 appearing in the above formula corresponds to the maximum chlorine requirement permissible without surcharge. The figure 0.00626 is the factor to convert parts per million to pounds per 100 cubic feet. No discount shall be permitted for sewage or industrial wastes having a chlorine requirement of less than 25 parts per million. It is recognized that the chlorine requirement of certain undiluted chemical wastes may be difficult to determine because of excessive concentrations of interfering substances. In such instances the waste may first be diluted with municipal sewage. Portions of the diluted waste and the sewage used in making the dilution shall then be allowed to stand at room temperature, approximately 68 degrees F, for a period of not less than two hours, or more than eight hours. The chlorine requirement of each shall then be determined and the chlorine requirement of the undiluted waste computed by the following formula: C= M(V1+V2)-SV2 Where C = the chlorine requirement of the waste to be used in the formula of section 933.30 M = the chlorine requirement of the mixed sewage and waste in parts per million S = the chlorine requirement of the sewage used for dilution in parts per million VI = the volume of waste used in the mixture V2 = the volume of sewage used in the mixture In the application of this procedure, the volumes of waste and diluting sewage used shall be such that the ratio of VI to (VI + V2) is approximately equal to the ratio of the average daily flow of wastes in question to the average daily flow of sewage entering the treatment works. This procedure shall be used only in those instances where the board believes its use to be necessary or desirable in order to determine the equitable chlorine requirement surcharge rate. Since the above stipulated surcharge is only intended to compensate the board for the additional cost of chlorinating abnormal industrial wastes, it shall only be applied during those periods when the board is actually using chlorine. In the event the board uses chlorine for only a portion of some given billing period, then the surcharge for that particular period, as computed in accordance with section 933.30, shall be reduced by the percentage of such period during which no chlorine is used.
(Ord. No. 2025-O-08, 4-14-25)
Ask a question about Huntington law
Corpus searches the Huntington sections it holds and shows the ones that match, with their citations. Free, no sign-in.