For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 970.02 — DEFINITIONS

Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 970.02

Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/e2367e08-dd39-41e3-9e93-5ba319ef7420

970.02 - DEFINITIONS.

Terms in this article shall be defined herein: 1. "Best Management Practice" or "BMP" means a technique, or series of techniques, activities, and/or devices, which are effective in controlling runoff, erosion, and sedimentation. 2. "Borrow" means earth material acquired from an off-site location for use in grading on a site. 3. "City" means the City of Huntington, West Virginia. 4. "Certified contractor" means a person who has received training and is licensed by the United States Environment Protection Agency's National Pollutant Discharge Elimination System (or NPDES) or by the Huntington Stormwater Board to inspect and maintain erosion and sediment control practices. 5. "Clearing and grubbing" means the cutting and removal of trees, shrubs, bushes, windfalls, and other vegetation including removal of stumps, roots and other remains in the designated areas. 6. "Complete application" means an application form that is completed in its entirety with all appropriate plans, drawings, calculations, contact information, addresses, and signatures. The application form is provided by the Huntington Stormwater Board. 7. "Demolition" means any act or process of wrecking or destroying a building or structure. 8. "Detention facility" means a temporary or permanent natural or manmade structure that provides for the temporary storage of stormwater runoff. 9. "Developer" means any person, firm, corporation, sole proprietorship, partnership, state agency or political subdivision engaged in land disturbance activity. 10. "Director" means Director of the Huntington Stormwater Board, or his/her designee. 11. "Drainage way" means any channel that conveys surface runoff throughout the site. 12. "Emergency land disturbance" means land disturbance, earthwork or repairs to protect life, limb or property. If the land-disturbing activity would have required an approved erosion and sediment control plan except for the emergency, then the land area disturbed shall be protected with sediment and erosion control practices, properly graded, and stabilized. A sediment and erosion control plan shall be submitted to the board as soon as possible during or after the emergency work. 13. "Erosion" means the wearing away of the ground surface as a result of the movement of wind, water, ice and/or land disturbance activities. 14. "Erosion control" means an activity, device, or measure taken to prevent erosion. 15. "Inspector" means Huntington Stormwater Board employee who has received training for erosion control approved by the director. 16. "Excavation" means the mechanical removal of earth material. 17. "Fill" means a deposit of soil or other earth materials placed by artificial means. 18. "Final erosion and sediment control plan" or "final plan" means a plan which includes permanent measures and best management practices to control surface runoff and control sediment if not included in the initial erosion and sediment control plan. 19. "Floodplain" means the 100-year floodplain, which is that area adjoining a watercourse that could be inundated by a flood that has a 1% chance of being equaled or exceeded in any given year, and is delineated on the most current Federal Emergency Management Agency floodway maps for West Virginia. 20. "Grade" means the vertical location of the ground surface. (1) "Existing grade" means the grade prior to grading. (2) "Rough grade" means the stage at which the grade approximately conforms to the approved plan. (3) "Finish grade" means the final grade of the site which conforms to the approved plan. 21. "Grading" means the excavation or fill of material, including the resulting conditions thereof. 22. "Land disturbance activity" means any land change that may result in soil erosion from wind, water and/or ice and the movement of sediments into or upon waters, lands or rights-of-way within the city. This includes, but is not limited to, building demolition, clearing and grubbing, grading, excavating, transporting and filling of land. 23. "Notice of violation (NOV)" means a written notice that a violation exists of the approval letter, SWPPP, permit or, of this article. 24. "Outfall" means the point of discharge to any watercourse from a public or private stormwater drainage system. 25. "Perimeter control" means a barrier that prevents sediment from leaving a site by filtering sediment-laden runoff or diverting it to a sediment trap or basin. 26. "Phasing" means clearing a parcel of land in distinct phases, with the stabilization of each phase completed before the clearing of the next improvements and structures for the control of erosion, runoff and grading. 27. "Retention facility" means a temporary or permanent natural or manmade structure that provides for the storage of stormwater runoff by means of a permanent pool of water. 28. "Runoff" means rainfall, snowmelt or irrigation water flowing over the ground surface. 29. "Sediment" means soils or other surface materials transported by surface water as a product of erosion. 30. "Sediment control" means measures that prevent eroded sediment from leaving the site. 31. "Sedimentation" means the process or action of deposition of sediment that is determined to have been caused by erosion. 32. "Site" means the entire area of land disturbance activity which is proposed in the permit application. 33. "Site redevelopment permit" means a permit issued by the board for the construction or alteration of ground. 34. "Site plan" means a plan or set of plans showing the details of any land disturbance activity of a site including, but not limited to, the construction of structures, drainage facilities, stormwater management facilities, parking lots, driveways, curbs, pavements, sidewalks, bike paths, recreational facilities, ground covers, plantings, and landscaping. 35. "Slope" means the incline of the ground surface as expressed as a ratio of horizontal distance over vertical distance. 36. "Stabilization" means the use of practices that prevent exposed soil from eroding. 37. "Start of construction" means the first land-disturbing activity associated with a development, including land preparation such as clearing, grading, and filling; installation of streets and walkways; excavation for basement, footings, piers or foundations; erection of temporary forms; and installation of accessory buildings such as garages. 38. "Steep slope" means the incline of the ground that is greater than 15%, rise over run. 39. "Stripping" means any activity which removes or significantly disturbs the vegetative surface cover including clearing, grubbing of stumps and root mat and topsoil removal. 40. "Stormwater management facilities" means structures for the purpose of controlling stormwater runoff on a development site or other property. 41. "Stormwater pollution prevention plan (SWPPP)" means a set of plans and drawings prepared by, or under the direction of, a licensed professional engineer. The plans and drawings contain specific erosion prevention measures, sediment controls, and sequencing that, when implemented, will control the release of sediment laden stormwater discharges. In lieu of a licensed professional engineer, individuals that are trained in methods to control erosion and sedimentation may prepare plans for submittal for small projects. 42. "Watercourse" means any natural or improved stream, river, creek, ditch, channel, canal, conduit, gutter, culvert, drain or wash in which waters flow either continuously or intermittently. 43. "Watershed" means a region draining to a specific river, river system or body of water. 44. "Waterway" means a channel that directs surface runoff to a watercourse or to the public storm drain. 45. "Wetland" means those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. 46. "WVDEP" means the West Virginia Department of Environmental Protection.

(Ord. of 3-11-13(1); Ord. No. 2023-O-21, 10-10-23; Ord. No. 2024-O-04, § 1(Exh. A), 2-26-24)

Ask a question about Huntington law

Corpus searches the Huntington sections it holds and shows the ones that match, with their citations. Free, no sign-in.