§ 970.04 — REVIEW AND APPROVAL OF EROSION AND SEDIMENT CONTROL PLAN
Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 970.04
Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/d7d15d9a-7ebb-4352-968d-065af38bd21a
970.04 - REVIEW AND APPROVAL OF EROSION AND SEDIMENT CONTROL PLAN.
Except as otherwise provided in this article, no person may grade, fill, excavate, store, stockpile or dispose of earth materials or perform any other land-disturbing activity without first obtaining a site development erosion and sediment control permit from the board. (1) Conditions of approval. The board will review each application for a site development erosion and sediment control permit to determine its conformance with the provisions of this regulation. Within 30 days after receiving an application, the board shall, in writing: A. Approve the completed permit application and SWPPP. B. Approve the completed permit application subject to such reasonable conditions as may be necessary to secure substantially the objectives of this article, the board may impose conditions necessary to prevent creation of a nuisance, pollution, or unreasonable hazard to persons or to a public or private property. Such conditions shall include, but not be limited to, the following: i. The granting and the recording in county land records of easements for drainage facilities, including the acceptance of their discharge on the property of others, and for the maintenance of slopes or sediment and erosion control best management practices. ii. Adequate control of dust by watering or other control methods deemed acceptable by the issuing authority, and in conformance with applicable air pollution ordinances. iii. Improvements of any existing grading, ground surface or drainage collection on the site (not to exceed the area as proposed for work or development in the application) to meet the standards required under this article for new grading, drainage, and erosion control. iv. Sediment traps and basins located within a densely populated area or in proximity of an area where small children may congregate without adult supervision may be required to install additional safety devices. v. Installation of silt trapping devices to prevent sediment from flowing off site. These types of silt trapping devices include, but are not limited to, silt fences, straw wattles, erosion eels, silt bags, and gutter barriers. vi. Require seeding and straw mulch of bare, exposed earthen areas. Seed and mulch density shall be in accordance with the standard set forth by the Huntington Stormwater Board. vii. Steep slope projects may require sediment control or BMP's that are designed to safely control sediment in a more robust manner. These may include, but are not limited to, super silt fence, slope trenching or benching and other appropriate BMPs for steeper slopes. C. Request additional information on the plans and drawings so that the application and SWPPP is deemed complete. D. Disapprove the permit application, indicating the reason(s) and procedure for submitting a revised application and/or submission. E. Failure of the board to act on completed application within 45 days of receipt shall authorize the applicant to proceed in accordance with the plans as filed unless such time is extended by agreement between the applicant and the board. (2) Responsibilities of applicant and/or permit holder. The permit holder shall maintain a copy of the permit, approved plans and reports required under the permit on the work site and available for public inspection during all working hours. The permit holder shall, at all times, be in conformity with the approved permit application and SWPPP and also conform to the following: A. General. Notwithstanding other conditions or provisions of the permit or the minimum standards set forth in this article, the permit holder is responsible for the prevention of damage to adjacent properties. No person shall grade on land in any manner or so close to the property line as to endanger or damage any adjoining public street, sidewalk, alley or other public or private property from settling, cracking, erosion, sedimentation or other damage or personal injury which might result. B. Public ways. The permit holder shall be responsible for the prompt removal of, and the correction of damages resulting from, any soil, miscellaneous debris or other materials washed, spilled, tracked, dumped, or otherwise deposited on public streets, highways, sidewalks or other public thoroughfare, incident to the construction activity or during transit to and from the construction site. (3) Liability. The permit holder is responsible for safely and legally completing the project. Neither the issuance of a permit, nor the compliance with the provision hereto or with any condition imposed by the utility, shall relieve a person from responsibility for damage to persons or property resulting therefrom, or as otherwise imposed by law, nor impose any liability upon the city or board for damages to persons or property. (4) Permit application. The owner or his authorized representative shall submit a completed application and SWPPP to the board in compliance with this article and the appropriate fee. The application shall be provided by the board. Plans shall be prepared and/or approved by a civil engineer, surveyor, architect, or landscape architect. The board may waive this certification requirement in instances when work is simple, clearly shown and entails no hazard or nuisance potential to adjacent property or watercourse. Any applicable fees will be set by city council. An application consists of the following: A. PDF file of the completed and signed application form, B. PDF file of SWPPP, C. Copy of the WVDEP approval letter under their construction stormwater permit, if applicable, D. Appropriate fee, E. PDF file of drawings with plan view and cross-sectional diagrams of all BMPs and stormwater facilities, F. Other appropriate information as necessary. (5) SWPPP. To be deemed complete the SWPPP must contain the following information, as applicable. If the following information is not contained in the SWPPP, the permit application package may not be deemed complete by the board. The SWPPP must contain the following information: A. For all land-disturbing activities one acre or greater, the applicant shall comply with all requirements of the NPDES Phase II regulations, (64 FR 68722). B. Dated drawings. C. Narrative that explains the nature of the construction activity and the potential for sediment and other pollutant discharges from the site. D. Designation of an individual to oversee implementation of the SWPPP and provide a chain of responsibility. E. Contractors and subcontractors performing the land disturbance activity. F. Indicate that stockpiles of soil or other materials subject to erosion by wind or water shall be covered, vegetated, enclosed, silt fenced on the downstream side or otherwise effectively protected from erosion in accordance with the amount of time the material will be on site and the manner of its proposed use. No stockpiling is allowed in the street. G. Show a reduction of soil compaction. To enhance vegetation establishment and infiltration of rain water all compacted soil shall be tilled to a depth of at least six inches before revegetation. H. Provide that all silt fences used for erosion and sedimentation control and all other temporary controls shall not be removed until the board has determined that the site has been permanently stabilized and shall be removed within 30 days thereafter. I. Methods to prevent sediment damage to adjacent properties and sensitive environmental areas such as water bodies, plant communities, rare, threatened and/or endangered species habitat, wildlife corridors, greenways, etc. J. Design and construction methods to stabilize steep slopes. K. Design and construction methods of adequate drainage facilities on slopes that do not impact adjacent properties and does not add to the burden of maintaining additional storm infrastructure by the board. L. Measures to control the quality of stormwater leaving a site before, during, and after construction. M. Any dewatering measures that may be necessary. N. Stabilization of all waterways and outlets. O. Protection of storm sewer infrastructure from sediment loading/clogging. P. Precautions taken to contain sediment when working in or crossing water bodies. Q. Stabilization of disturbed areas, including board construction areas, as soon as possible. R. Protection of adjacent roads and alleys from sediment and mud from construction site activities. S. Disposal of collected sediment and floating debris. T. Any mitigation measures required as a result of any review conducted for the project (e.g. wetland mitigation, etc.). U. Any additional measures to comply with surface and groundwater standards in sensitive areas. V. Schedule of events. A detailed schedule indicating dates and sequence of land alteration activities; implementation, maintenance and removal of erosion and sedimentation control measures; and permanent site stabilization measures. W. Monitoring and inspection. A detailed description of how erosion control, sediment control and soil stabilization measures implemented pursuant to the SWPPP will be monitored, maintained, and removed. The SWPPP must identify a person knowledgeable and experienced in erosion and sediment control who will oversee the implementation of the SWPPP and the installation, inspection, and maintenance of the temporary and permanent stormwater management system. X. Other information. The board may require additional or modified information as appropriate. Y. On a determination that the condition of the soils is unknown or unclear and that additional information is required to find that an applicant's proposed activity will meet the standards and purposes of this rule, the board may require soil borings or other site investigation to be conducted and may require submission of a soils engineering or geology report. Z. The SWPPP shall be modified when there is a change in design, operation, maintenance, weather, or seasonal conditions that have a significant effect on discharge and/or inspections indicate that the plan is not effective and existing BMPs are not controlling pollutants and discharges from the site. (5) Permit duration. Permits under this article shall be valid for the period during which the proposed land-disturbing activities and soil storage takes place or is scheduled to take place, whichever is shorter, but in no event shall such a permit be valid for more than one year. The permit holder shall commence permitted activities within 180 days of the scheduled commencement date for grading or the permit holder shall resubmit all required application forms, maps, plans, drawings, schedules, and fees to the board, except where an item to be resubmitted is waived by the board. (6) Permit renewals and extensions. The permit holder shall fully perform and complete all of the work required in the sequence shown on the approved plans and drawings within the time limit specified in the permit. Prior to a plan's expiration, the permit holder may submit to the board a written request for an extension. If an extension is granted, a no-fee extension for up to 90 days may be granted. Other extensions not to exceed one year may be granted for a fee of $50 per extension. (7) Permit application deemed incomplete or denial. If the board determines that a SWPPP and application does not meet the requirements in this article, or is incomplete, a permit shall not be issued. The plan must be resubmitted with corrections before any land-disturbing activity is to begin. All other land use and building permits shall be suspended until the applicant submits an acceptable application and SWPPP. (8) Public input. The public is encouraged to report any issues or potential violations on construction sites by contacting the board.
(Ord. of 3-11-13(1); Ord. No. 2023-O-21, 10-10-23; Ord. No. 2024-O-04, § 1(Exh. A), 2-26-24)