970.07 - INSPECTIONS AND MONITORING.

The contractor and/or their agents shall conduct a pre-construction meeting with the board on each site which has an approved SWPPP. After commencing initial grading or land-disturbing activities, the permit holder shall obtain written inspection approvals by the board at the following stages in the development or of each development thereof: (1) Completion of installation of perimeter erosion and sediment controls, prior to proceeding with any other land-disturbing activities or grading, other building or grading inspection approvals may not be authorized until approval by the board is received. (2) Upon completion of stripping, the stockpiling of topsoil, the construction of temporary erosion and sediment facilities, disposal of all waste materials, and preparation of the ground and completion of rough grading but prior to placing top soil, permanent drainage or other site development and ground covers. (3) Upon completion of final grading, permanent drainage and erosion control facilities including establishing ground covers and planting and all other work of the permit. The board may require additional inspections as may be deemed necessary. Work shall not proceed beyond the stages outlined above until the board inspects the site and approves the work previously completed. Request for inspection shall be made at least 48 hours in advance (not including weekend days or holidays) of the time inspection is desired. Upon requests for inspection, the board shall perform the inspection within 72 hours of request. The permit holder shall request inspection before the following events occur: A. Start of construction. B. Installation of sediment and erosion measures. C. Completion of site clearing. D. Completion of rough grading. E. Completion of final grading. F. Close of construction season. G. Completion of final landscaping. In making application for a permit covered by this article, the applicant or the person performing or allowing such work consents to the board to having the right to enter the site for the purpose of inspecting compliance with the erosion and sediment control plan, includes consent to inspect any area of the property where land-disturbing activity is occurring or is thought to be planned as a site of land-disturbing activity.

(Ord. of 3-11-13(1); Ord. No. 2023-O-21, 10-10-23; Ord. No. 2024-O-04, § 1(Exh. A), 2-26-24)