For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.05.050 — New construction

Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 13.05.050

Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/85b63e6e-6c90-4e5a-ac1e-daebe9dcd2cb

13.05.050 - New construction.

A. Each lot shall have separate water and sewer service lines, water meter, and shut-off valve serving it and no other lot. Water service shut-off valves shall generally be located at the property line or within the front lot utility easements. B. Any applicant who desires a water and/or sewer connection generating water or wastewater demand shall pay water distribution, wastewater collection and wastewater treatment plant system investment charges, regional water system investment charges, lateral charges for water and sewer mains, recapture charges, water service line charges, water meter charges, sewer tap charges, special subdivision charges, and other ancillary charges as appropriate in the manner set forth in this title and as set forth by resolution of the city. Special subdivision charges and recapture charges shall be paid and calculated in the manner set forth in the applicable subdivision agreement or water and sewer contract with the developer. C. No building permit for water or wastewater connections generating water or wastewater demand, which is required to pay water distribution, wastewater collection, or wastewater treatment plant system investment charges or other charges pursuant to this title shall be issued by the city until the charges required by this title have been paid. D. All existing water and sewer connections that may need new water service lines, water meters, new sewer taps, or other services shall pay the appropriate charges prior to receiving the service. E. Customers Are Responsible For All New Water Service Lines. The city does not guarantee that a water service line is extended into a lot. If there is no water service connection into the lot or parcel of land, the city shall install, at the cost of the customer as covered by fees set forth by resolution, a corporation stop on the main, the water service line from the water main to the customer's property, the shut-off valve, and the service box. All trenching, excavation, backfilling, compaction, surface restoration and related matters shall be performed by and at the cost and expense of the customer. F. Customers Are Responsible For All New Sewer Service Lines. The city does not guarantee that a sewer service line is extended into a lot. If there is no sewer service connection into the lot or parcel of land, the city shall install, at the cost of the customer as covered by fees set forth by resolution, a sewer service saddle on the sewer main. The customer must then install the sewer service line from the saddle leading from the sewer main to the customer's property. All trenching, excavation, backfilling, compaction, surface restoration and related matters shall be performed by and at the cost and expense of the customer. G. All unused water and sewer service lines must be properly plugged and abandoned by the customer. Unused water service lines must be removed at the water main and the water main connection plugged. The customer must excavate and carefully expose the water main and the city will plug the water main connection at no charge to the customer. Unused sewer service lines must be plugged by the customer at the property line. All trenching, excavation, backfilling, compaction, surface restoration and related matters associated with water or sewer service line abandonment shall be performed by and at the cost and expense of the customer. H. The water service line serving a building generally must be the same size as the water meter. The only exceptions are long service lines (over one hundred feet) and areas of low pressure (less than forty-five pounds per square inch). Exceptions must be approved by the city in writing. I. All plumbing and equipment of the customer, including outside hose bibs and irrigation systems shall be connected, at the expense of the customer, to the service piping in such a manner that all water used by the customer shall pass through the meter. J. It is the responsibility of the customer of the property serviced to maintain the service box for the shut-off valve in a plumbed and operable condition, flush with the ground level at all times. In the event the customer fails to restore the service box and the shut-off valve in a plumbed and operable condition within ten days after written notice from the city, the city may make the necessary repairs to bring the service box and shut-off valve plumb, operable, and flush with the ground level, the cost of which shall be the responsibility of the customer, which will be billed to the customer by the city. K. Pressure reducing valves are required for residential and commercial buildings, which make new connections to the city's water system if the static pressure is over sixty-five pounds per square inch.

(Ord. 45-06 (part), 2006)

Ask a question about Casper law

Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.