§ 15.24.140 — IPC Section 306 added—Subsection 306.5—Additional Backfill Requirements
Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 15.24.140
Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/cc2c3a0e-d9ca-4133-b904-6b9355736178
15.24.140 - IPC Section 306 added—Subsection 306.5—Additional Backfill Requirements.
Section 306.5—All excavations shall be completely backfilled as soon after inspection as practical. Adequate precaution shall be taken to ensure proper compaction of backfill around piping without damage to such piping. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinder fill, or other materials which would damage or break the piping or cause corrosive action. Mechanical devices such as bulldozers, graders, etc., may then be used to complete the backfill to grade with the following exceptions: All street and alley excavations shall be completely backfilled in accordance with Casper City Code Chapter 12.16. All excavations within ten feet of any sidewalk or other concrete flat work, shall be compacted to the density of the surrounding ground and backfill shall be placed in twelve inch layers during compaction. All other fill shall be properly compacted. Suitable precautions shall be taken to insure the permanent stability for pipe laid in, filled, or made ground. No other utility shall be run or laid in the same trench with water service pipes or any underground water pipes and/or building sewer pipes, except for crossovers.
(Ord. No. 17-24, 8-20-2024)
Ask a question about Casper law
Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.