§ 17.12.010 — Nonconforming uses
Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 17.12.010
Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/9d8d252b-8d25-4885-bc97-099d1076268d
17.12.010 - Nonconforming uses.
A. It is the intent of this title to permit legal nonconforming lots, structures, or uses to continue until they are removed or are abandoned, but not to encourage their continuance. It is recognized that there exist within the zoning districts established by this title, lots, structures, and uses of land which were lawful before this title was adopted and which would be prohibited, regulated, or restricted under its present terms. Such lots, structures, and uses are declared to be incompatible with permitted lots, structures, and uses in the district involved. It is the intent of this title that, unless otherwise provided for, such nonconforming uses of land or structures, shall not be enlarged, expanded or extended, or be used as grounds for adding additions to existing structures or new structures or uses otherwise prohibited which would increase their nonconformity. If a nonconforming use is discontinued for three hundred sixty-five calendar days, any future use of the land shall be in conformity with the provisions of this title. B. A nonconforming use of a structure, a nonconforming use of land, or a nonconforming use of a structure and land, shall not be extended or enlarged after the passage of this title by alteration of a building or premises or by the addition of other uses of a nature which would be prohibited in the zoning district involved, unless otherwise provided for in this chapter. Nothing in this chapter shall be deemed to require a change in the plans, construction, or designated use of any building on which construction was lawfully begun prior to the effective date of this title, or any building upon which a building permit has been issued and construction has not begun. If demolition or removal of an existing structure is involved, such demolition or removal shall be considered as part of the construction. C. There may be a change of tenancy, ownership, or management of any existing nonconforming use of land, structure, or land and structure, providing the use is continuous and there is not a change or expansion of such nonconforming use. D. Nonconforming residential structures that are damaged or destroyed may be reconstructed or repaired to the extent that the reconstructed square footage does not exceed the square footage that existed on January 1, 2007 by greater than ten percent and provided that all of the following conditions are met: 1. The repair or reconstruction meets the provisions of the Casper Municipal Code, and all other applicable law and regulations in effect at the time of the repair or reconstruction; and 2. The repair or reconstruction commences within three hundred sixty-five days from the date of damage or destruction; and 3. The residential structure was used entirely for residential use within the previous three hundred sixty-five days prior to the damage or destruction; and 4. If the repair or reconstruction is suspended or abandoned for a period of one hundred eighty days after the time the work is commenced, the building permit shall become invalid. The community development director or his or her designee is authorized to grant, in writing, one or more extensions of time, for periods of not more than one hundred eighty days each. All extensions shall be in writing with justifiable cause demonstrated.
(Ord. 19-07 § 1, 2007; Ord. 14-98 § 5, 1998; Ord. 5-91 (part), 1991
Ask a question about Casper law
Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.
