§ 17.12.250 — Building and occupancy permits

Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 17.12.250

Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/559a18bf-0f79-4385-b360-c7efec65631c

17.12.250 - Building and occupancy permits.

A. No building permit or occupancy permit shall be issued by the city manager or his authorized representative for the excavation for or erection of a building, or part of a building, or for repairs to or alteration of, or moving of a building or part of a building or for the use of any premises until the zoning clearance section of the building permit application has been executed by the planning director or his designee. The zoning clearance section of the building permit application must be executed by the planning department and a statement of its intended use must be filed by the applicant and requirements of all applicable building codes must be met. In addition, the plans and intended use shall indicate that the building and premises either conform, in all respects, to the provisions of this title, or such proposed building or use shall have been duly authorized by the council or commission, as provided by law. B. All applications for building permits shall be accompanied by a plat or a site plan, in duplicate, in accordance with this title, showing the lot, the proposed location of the building on the lot, accurate dimensions of building and lot, number of off-street parking spaces and their dimensions, and other information as may be required to comply with the current edition of the Uniform Building Code and any other applicable city codes and ordinances. An original copy of such application and plat shall be kept in the office of the city manager or the city manager's authorized representative, and a duplicate copy shall be kept at the building site at all times during construction. Lot lines shall be defined on the ground before construction of or excavation for a building is commenced. C. An occupancy permit may be issued prior to all on- and/or off-site improvements being completed, if the owner obtains and submits an irrevocable letter of credit in the amount necessary to complete said improvements, and provided that precautions have been taken to insure public safety. The amount of the irrevocable letter of credit shall be based upon a letter signed by the owner's engineer or architect. Said irrevocable letter of credit must be submitted to the planning director, and must provide that if the improvements are not completed within twelve months, the city may have them completed and without other approval may draw upon the letter of credit for reimbursement of the costs thereof. D. Except as otherwise provided, there shall not be more than one principle building on a lot in the R-1 zoning district, or in the R-2 zoning district, unless a conditional use is approved by the planning and zoning commission. More than one principal building shall be permitted on a single lot in all other zoning districts.

(Ord. 28-08 § 28, 2008; Ord. 5-91 (part), 1991)