For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.12.150 — Site plans

Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 17.12.150

Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/8ceb0488-7733-4d54-a5ec-5d2b561e0c1c

17.12.150 - Site plans.

A. Goal. To beautify and improve the quality of life in the city of Casper, Wyoming, and to ensure compliance with the city subdivision regulations and the city zoning ordinance. B. Objectives. The site plan requirements and procedures for the city of Casper are designed to meet the following objectives for the protection of the health, safety and welfare of the general public: 1. To ensure compliance with all requirements of the city zoning ordinance and subdivision regulations, and all drainage, safety, utilities, natural hazard, erosion control, traffic, and easement provisions required by city ordinances, rules, regulations, and plans; 2. To provide a smooth transition between adjoining properties; 3. To encourage infill development; 4. To facilitate the review of new developments by appropriate agencies of the city; 5. To streamline the development application, review and approval processes; and 6. To provide a review process for new development and its impacts to surrounding property with regard to stormwater runoff, water supply, wastewater contribution, and traffic impacts. C. Definition. The site plan is a plot plan of the entire area to be developed, which shows location and size of buildings, the area of the land under consideration, street names and widths, parking area size, and all other items required on the site plan checklist (Section 17.12.150(K)). A site plan is required for all PUD's, all new multi-family residential buildings consisting of sixteen or more living units, all new public, commercial and industrial buildings, and churches, and all exterior additions, of one thousand square feet or larger, to multi-family residential buildings, existing public, commercial and industrial buildings, and churches. D. Site Plan Approval Criteria. A site plan shall be approved if the site plan is found to satisfy the standards of this title, including the following: 1. Be compatible with the goals and policies of all plans currently adopted by the council. 2. Promote the efficient use of land by means of a sound arrangement of buildings, safe and functional points of access, well planned parking circulation systems, and adequate sidewalks and pathways for pedestrians. 3. Provide for landscaping, and within high density housing complexes, usable open space, such as, but not limited to, bicycle paths, playground areas, courtyards, areas for active recreation, swimming pools, landscaping, gardens, walks, outdoor seating areas, outdoor picnic areas, and similar open space. 4. Preserve and utilize where possible, existing landscape features and amenities, and blend such features with the new structures and other improvements. E. Procedures. 1. Persons submitting site plans are encouraged to meet with, and discuss, their proposals and the site plan application with the community development director and city engineer prior to submitting an application for review. 2. A complete site plan application must be submitted to the community development department, which shall include: a. The original copy of the site plan application form; b. Depending on the type of review, up to fifteen copies of a site plan containing all information required on the site plan checklist, as determined by the community development director, or his designee; c. A digital copy of the site plan, if designed with a computer assisted drafting program (CAD), shall be provided in a format adopted by the community development department when the site plan has been approved; d. For sites having a total land area of more than ten thousand square feet, the applicant shall submit a drainage study and shall provide existing and proposed contours on the site plan. Based on the results of the study, the applicant shall be required, by council, to contribute a proportionate share of off-site drainage control improvements impacted by the project, as expressed in the approved site plan agreement; e. For those sites having a total land area less than ten thousand square feet, the applicant shall submit a drainage plan showing surface drainage and the effect the surface drainage will have on the area under consideration and all abutting public and private property, and demonstrating compliance with the city's Urban Storm Water Management Plan; f. For developments generating more than seventy-five vehicle trips per peak hour period, a traffic study shall be prepared in accordance with Section 16.20.080(B), for the community development department by the engineer the city has contracted with for such studies. Trip generation data shall be calculated using the trip generation guide (Institute of Transportation Engineers, 1991, or most recent edition). In the event said data is not available, the community development director, city engineer and consulting engineer shall mutually agree upon assumptions and estimates to be used in said study. Based on the results of the study, the applicant shall be required, by council, to contribute a proportionate share of off-site traffic controls impacted by the project, as expressed in the approved site plan agreement; g. If the applicant proposes to use an alley for primary or secondary customer access, the applicant shall be required to pave the alley from the street to the rear property line, in accordance with the city's standards set forth in Chapter 16.16; and h. Buffering measures for the areas of transition between all commercial, multi-family, townhouse and condominium dwellings adjacent to single-family dwellings, and for all PUD, commercial, industrial, and multi-family developments shall be incorporated into the site plan pursuant to Appendix B, of Title 17. 3. The procedure for submittal, approval or denial, and appeal for PUD site plans is set forth in Chapter 17.52 of this title. 4. At the time an application for a site plan is submitted to the community development department, a uniform fee, as established by council resolution, shall be paid by the applicant. If it is determined by the community development director, after the initial review of the site plan, that specific site plan requirements do not apply to the subject project, then the community development director may waive those requirements. 5. Site plans shall be drawn to scale and show as a minimum, accurate dimensions of: lot size and area; building size and area; street names and width; parking areas showing entrances, exits, distance between rows of spaces, and total area of parking; plus all other items required by the council in accordance with this section. 6. If a site plan is approved by the community development director pursuant to Section 17.12.150(F), then such approval shall be expressed in a site plan agreement executed by the community development director and the applicant. In the event a site plan is approved by the planning commission or city council, then it shall be entered upon the minutes of the body approving it. The site plan shall be signed by the chairman and the secretary of the commission. In the event the site plan is approved by the planning commission, or signed by the mayor if approved by the council. In the event a site plan is approved by the community development director, the site plan shall be signed by the community development director and attested by the city clerk. 7. An approved site plan shall be forwarded to the building official by the community development director prior to the building official issuing any building permits. 8. When construction has not begun or when the site plan has not been exercised by the applicant, or applicant's successors, heirs, or assigns within three years from the date of site plan approval, such site plan shall terminate and shall have no further force or effect. a. "Exercised" as set forth in this subsection shall mean that the holder of the site plan has executed a building contract for construction of a main building, or other improvement; or in the absence of contracts, that the principal building or other improvement(s) is completed to a substantial degree. When construction is not a part of the use, "exercised" shall mean that the use is operating in compliance with the conditions as designated in the site plan agreement, unless an extension not exceeding one year from the date of expiration is granted by council. Council may grant an extension after receiving a written request from the owner. F. Administrative Review. Site plan applications for all new buildings, including but not limited to public, commercial, and industrial buildings, and churches, up to twenty thousand square feet of ground floor area in size, and building additions up to twenty thousand square feet of ground floor area in size, may be approved by the city engineer and community development director, provided that the abutting lot or lots are neither zoned for, nor currently in use as residential property. When the abutting lot or lots are residential, the city engineer and community development director may only approve projects with new buildings or additions to existing buildings, up to and including ten thousand square feet in ground floor area. All new stand-alone off-street parking lots and parking lot expansions shall be reviewed and may be approved by the city engineer and community development director. The site plan application shall comply with the following procedure: 1. Within three working days of the receipt of the application, the community development director, or his designee, shall review the application for completeness. If the application is not complete, the community development director shall notify the applicant verbally, and either by facsimile, e-mail, or in writing, and shall list those items needed to complete the application. If the application is complete, the city engineer and community development director shall approve, approve with conditions, or deny the application within fifteen working days of its receipt and notify the applicant in writing and verbally of the decision. If approved or approved with conditions, the applicant shall sign a site plan agreement stating the terms of approval and his willingness to comply with those terms and may obtain a building permit from the building inspections division pursuant to Title 15 of this code following signing. If the application is denied, the applicant shall not be issued a building permit by the building official. 2. Upon receipt of a site plan, which is to be reviewed administratively, a sign shall be posted and maintained on the subject property within three working days of receiving the complete site plan to serve as public notice of the applicant's proposal. Such sign shall be visible from the public roadway and shall remain on the property for not less than ten working days. In addition, a written notice describing the project and identifying the date public comments are due shall be mailed or delivered to the owners of private real property within a three hundred foot radius of the perimeter of the project area, as shown on the site plan. The notice shall be mailed within five working days of receiving the complete site plan application. All concerns or comments on the project received from a neighboring property owner or the general public shall be considered by the city engineer and community development director when rendering a decision on the application. 3. Decisions of the city engineer and community development director may be appealed in writing to the planning and zoning commission within ten calendar days of the city engineer and community development director's decision. Any action not appealed shall become final. G. Planning and Zoning Commission Review. Site plan applications for new public buildings, commercial buildings, industrial buildings, or churches with a ground floor area of twenty thousand to forty-three thousand five hundred sixty square feet, and multi-family developments over sixteen units per acre, must be approved by the commission. All exterior additions of twenty thousand square feet to forty-three thousand five hundred and sixty square feet to public buildings, commercial buildings, industrial buildings must be approved by the commission. When the abutting lot or lots are residential or zoned for residential uses, the commission shall review all public, commercial, industrial, church and multi-family developments with a ground floor area of greater than ten thousand and not more than forty-three thousand five hundred sixty square feet. Site plan applications must be approved by the commission according to the following procedure: 1. Applications must be submitted to the planning office by five p.m. at least thirty calendar days prior to the commission meeting at which the application is to be considered; 2. Upon receipt of the site plan, a written notice of the date, time, and place of the public hearing shall be mailed or delivered to the applicant and all owners of private real property within a three hundred foot radius of the perimeter of the project area, as shown on the site plan. The notice shall be mailed at least fifteen calendar days prior to the hearing date; 3. Within three business days of submittal, the community development director will review the application for compliance with the site plan application requirements. If the application does not conform to the requirements, it will be returned to the applicant within the five day period, and the community development director will notify the applicant, by telephone, fax, e-mail or in writing of the reasons for the determination, and shall list items needed to complete the site plan, the drainage study, and/or the traffic study. If the application is complete, it shall be accepted and the date of acceptance noted on all copies; 4. An application which is determined to be incomplete shall not be placed on the planning and zoning commission agenda unless it is resubmitted in complete and accurate form at least twenty calendar days prior to the commission meeting for which it had been set for hearing. The application will be reviewed in compliance with requirements as stated in the above procedure; 5. The community development department shall cause a sign to be posted and maintained on the property affected at least fifteen days prior to the planning and zoning commission public hearing. Such sign shall be visible from the public roadway and shall contain the following information: a. Case number; b. Date and place of public hearing; and c. Brief description of the site plan application to be reviewed. 6. The community development director will inform the applicant of the staffs review comments and recommendation to the planning and zoning commission, in writing, at least two business days prior to the commission meeting at which the application will be considered. In addition, a meeting will be scheduled between the applicant and the community development director to discuss the staff's written comments to the commission if the applicant so desires; 7. After being placed on the agenda, the application will be considered by the commission at its meeting. The community development department review comments and recommendation will be submitted at the commission meeting. The applicant will be given the opportunity to discuss the site plan with the commission, and other comments regarding the site plan may be made by any person in favor of, or opposed to the site plan; 8. The commission shall then take one of the following actions: a. Approve; b. Approve with conditions; c. Deny; d. Continue to a future planning and zoning commission meeting; or e. Forward to the city council for further review. 9. If the site plan application is approved or approved with conditions, the applicant shall sign a site plan agreement stating the terms of approval and his willingness to comply with those terms. 10. Appeal of commission decisions may be made to council, in writing, within ten business days of written notice of decision being sent to the applicant. If the commission's decision is appealed, the council may consider the appeal at the next regularly scheduled council meeting to be held after receipt of the written appeal. Within fifteen working days of the final council meeting at which the appeal was heard, the council shall make a final determination upon the appeal. 11. In an appeal from the commission to the council, the following shall be considered by council: all exhibits, and a tape recording or transcription of the verbal proceedings from the commission hearing; the verbal record and any comments or other evidence that the appellant or any other person wishes to present at the council hearing. H. City Council Review. Site plan applications for new multi-family developments, public buildings, commercial buildings, industrial buildings, or churches with a ground floor area in excess of forty-three thousand five hundred sixty square feet must be approved by both the planning and zoning commission and the council pursuant to the procedure below. If the ground floor of any addition to one of the above-listed developments, buildings or churches is in excess of forty-three thousand five hundred sixty square feet, it requires approval by both the planning and zoning commission and the council pursuant to the procedure below; otherwise, if the ground floor of the addition itself (not the resulting square footage of the building after constructing the addition) is forty-three thousand five hundred sixty square feet or less, only administrative approval is required. 1. Site plan applications must be reviewed by the planning and zoning commission pursuant to the procedures set forth in Section 17.12.150(G) prior to council review in the event the planning commission denies the application, the applicant may appeal to the city council pursuant to Section 17.12.150(G); 2. Upon approval, or approval with conditions, of a site plan recommendation by the planning and zoning commission, a written notice of the date, time, and place of the council public hearing shall be mailed or delivered to the applicant and all owners of private real property within a three hundred foot radius of the perimeter of the project area, as shown on the site plan. The notice shall be mailed at least fifteen calendar days prior to the hearing date; 3. After being placed on the agenda, the application will be considered by the council at its meeting. The applicant will be given the opportunity to discuss the site plan with the council, and other comments regarding the site plan may be made by any person in favor of or opposed to the site plan; 4. The council shall then take one of the following actions: a. Approve; b. Approve with conditions; c. Deny; or d. Continue discussion of the application to a future council meeting. 5. If the site plan application is approved or approved with conditions, the applicant shall sign a site plan agreement stating the terms of approval and his willingness to comply with those terms. The agreement may then be executed by the mayor upon approval of the council. If the application is continued, it may be considered at the next regularly scheduled council meeting and the decision to approve, approve with contingencies, or deny shall be made. Appeal of decisions may be made in writing to district court within ten calendar days of written notice of the council's decision. I. Alterations of the Final Site Plan. 1. The final site plan, as passed by the community development director, planning and zoning commission or the city council, shall not be altered during execution of the site plan agreement, except as hereinafter set forth. a. Minor alterations in configuration, setting, alignments, bulk of structures, placement or types of plant material, changes in grades, heights or character of structures, or other similar alterations may be authorized in writing by the community development director, if required by circumstances not reasonably foreseeable at the time the final site plan was approved. b. All other alterations in use, rearrangement of lots, realignment of major circulation patterns, drainage modifications, increases in density levels, provisions governing common or open space, or the ratio thereof, or any other alterations that, in the discretion of the community development director, substantially changes the site plan, shall be approved by the commission or the council, depending on project size, at public meetings for which public notice is given, pursuant to Sections 17.12.150(G) or 17.12.150(H) of this title. The same type and quality of data shall be required as was necessary for the original final approval and passage. J. Site Plan Application Form. OWNER _____ TELEPHONE ___________ ADDRESS _____ OWNER'S AUTHORIZED REPRESENTATIVE _____ ADDRESS _____ TELEPHONE___________ LEGAL DESCRIPTION OF LAND UNDER CONSIDERATION _____ _____ _____ COMMON ADDRESS OR LOCATIONAL DESCRIPTION _____ _____ PROPOSED USE OF SITE (i.e., restaurant, theater, four-plex, etc.) _____ _____ WHERE APPROPRIATE: Number of Employees on the premises: | _____ Gross floor area: | _____ Number of residential units: | _____ Number of off-street parking spaces provided: | _____ Number of off-street parking spaces required: | _____ Proof of ownership such as title certification, title opinion of an attorney, etc., is attached: | _____ The following owner's signature signifies that all information on the site plan application is accurate and correct to the best of the owner's knowledge, and that the owner has thoroughly read and understands all site plan application information and requirements. SIGNATURE OF PROPERTY OWNER___________ DATE___________ K. Site Plan Checklist. Site plans must be prepared in a professional manner using contemporary drafting techniques. All items on the following checklist must be addressed on a site plan. All proposed items addressed on the checklist must be included on the finished physical development exactly as designated on the approved site plan. 1. | _____ | Legal description and common address(es) of the proposed site. 2. | _____ | Title block stating name of project, designer, and address and telephone number of designer. 3. | _____ | Surrounding land uses, buildings, and zoning on all abutting sides, including those lands separated from the land under consideration by a street, alley, or other roadway. 4. | _____ | Current zoning of the land under consideration and proposed zoning, if applicable. 5. | _____ | North arrow, scale of site plan at a scale of 1″ = 10′ or a multiple thereof, and date site plan was prepared. 6. | _____ | Lot or parcel dimensions. 7. | _____ | Dimensions of all setbacks and heights of all proposed buildings. 8. | _____ | Location and dimensions of all proposed off-street loading dock areas, including street access and traffic flow, to these areas. 9. | _____ | Location of all trash receptacles. 10. | _____ | Locations of all advertising signs and fences. 11. | _____ | Any screening or screening devices used to minimize or eliminate areas which tend to be unsightly. 12. | _____ | Location of existing and proposed exterior lighting. 13. | _____ | Names and widths of all adjacent streets, dimensions and location of all public and private roadways relative to property lines, streets, or driveways, both paved and unpaved, including rights-of-way, pavement width, and proposed uses of rights-of-way. 14. | _____ | Location and dimensions of existing and proposed curb cuts and sidewalks. 15. | _____ | Off-street parking spaces, locations and dimensions, layout, traffic control, compact and handicapped parking spaces, including all surface markings such as directional arrows. 16. | _____ | Location of all wheel stops, bumper guards, and curbing warranted by topography or traffic and pedestrian circulation. 17. | _____ | Types of ground or yard surfacing throughout, grass, paving, gravel, etc. 18. | _____ | Existing and proposed easements. 19. | _____ | Vicinity map at a scale of l″ = 600′ clearly indicating the location of the land in question with respect to a larger recognizable area. 20. | _____ | General notes to include a summary of: a. Total land area in acres or square feet; b. Total building footprint in square feet; c. Percentage of land covered by buildings; d. Building height(s); e. Number of stories and total square footage of leasable space; f. Number of parking spaces required; g. Total number of parking spaces proposed; h. Square footage of all landscaped areas; i. Percentage of site covered by landscaping; and j. Area to be disturbed by grading or construction. 21. | _____ | Numbering of items on the site plan to correspond to items on this checklist. 22. | _____ | Existing and proposed contours Contour information shall extend ten (25′) feet into adjoining properties to represent drainage system continuity. 23. | _____ | Surface drainage study for sites of 10,000 square feet or more. Based on the results of the study, the applicant may be required to contribute to off-site drainage improvements. 24. | _____ | Pavement design report for parking areas. 25. | _____ | Traffic study, as required in Section 16.20.080(B) of the Casper Municipal Code. Based on the results of the study, the applicant may be required to contribute to off-site traffic improvements.

(Ord. 28-04 § 3, 2004; Ord. No. 13-19, §§ 1, 2, 7-2-2019)

Ask a question about Casper law

Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.