For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 52.04 — Wastewater discharge permit requirements

Code of Ordinances, City of Dayton, Ohio (Supp. No. 36: codified through Ordinance No. 32173-25, passed December 31, 2025) · Dayton City Code § 52.04

Corpus is an independent public-information project, not the official City of Dayton website. Stable reference: corpuslaw.us/code/0b009253-92f8-4285-b936-008ae08bbfe4

Sec. 52.04. - Wastewater discharge permit requirements.

(A) The Director may require any user to complete and submit to the city an industrial user's survey, providing information, needed by the Director to properly regulate the business, including, but not limited to, the nature of the business, water use, wastewater quantity and characteristics, and potential for pollutants to enter the city's wastewater facilities. (B) No significant industrial user shall discharge wastewater into the POTW without first obtaining a wastewater discharge permit from the Director, except that a significant industrial user that has filed a timely application pursuant to Section 52.04(I) may continue to discharge for the time period specified therein. Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this chapter and subjects the wastewater discharge permittee to the sanctions set out in this chapter. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. (C) The Director may require other users to obtain wastewater discharge permits (as necessary) to carry out the purposes of this chapter. (D) General permits may be issued for groups of users, including both significant and non-significant industrial users that have substantially similar types of operations; discharge the same types of wastes; require the same effluent limitations; and require the same or similar monitoring. (1) General permits are not available to industrial users: (a) Subject to production-based categorical pretreatment standards; (b) Who have categorical pretreatment standards expressed as mass of pollutant discharged per day; or (c) Whose limits are based on the combined wastestream formula or net/gross calculations. (2) To be covered by a general permit, the significant industrial user is required to file a written request to the POTW for coverage that identifies: contact information; production processes; types of wastes generated; location for monitoring all wastes to be covered by the general permit; any requests for a monitoring waiver for any pollutants not present; and any other information the POTW deems appropriate. I. Wastewater discharge permitting: existing SIU. (A) Any SID that was discharging wastewater into the POTW prior to the effective date of this chapter and that wishes to continue such discharges in the future shall, within 60 days after notification by the Director submit a permit application to the city in accordance with Section 52.04(V), and shall not cause or allow discharges to the POTW to continue after 90 days of the effective date of this chapter except in accordance with a wastewater discharge permit issued by the Director. (B) The Director's notification to SIUs covered by categorical pretreatment standards will be in reasonable time to insure that the SIUs comply with the 180-day submittal deadline date established in 40 CFR 403.12(b). II. Wastewater discharge permitting: new source and "new user." At least 90 days prior to the anticipated start-up, new sources, sources that become a user subsequent to the promulgation of an applicable categorical pretreatment standard, and "new users" that are determined to be SIUs, shall apply for a wastewater discharge permit and will be required to submit to the Director at least the information listed in Section 52.04(V)(A)—(E). A new source, or "new user" that is determined to be a SIU, cannot discharge without first receiving a wastewater discharge permit from the Director. New sources, and "new users" that are determined to be SIUs, shall also be required to include in their application information on the method of pretreatment the user intends to use to meet applicable pretreatment standards. New sources, and "new users" that are determined to be SIUs, shall give estimates of the information requested in Section 52.04(D) and (E). III. Wastewater discharge permitting: extra-jurisdictional users. (A) Any existing user located beyond the city limits required to obtain a wastewater discharge permit shall submit a wastewater discharge permit application as outlined in Section 52.04(I). (B) New source, and "new users" that are determined to be SIUs, located beyond the city limits required to obtain a wastewater discharge permit shall comply with Section 52.04(II). IV. Wastewater discharge permitting: zero discharge permits. Any SIU that operates its regulated processes so that no industrial waste is discharged to the POTW may request that a zero discharge permit (ZDP) be issued by the Director. To be eligible for a ZDP the user shall demonstrate to the Director's satisfaction that no categorical or otherwise regulated industrial waste will be discharged and shall either permanently seal all accesses to the POTW other than those required for disposal of domestic sewage or install shutoff devices that will accept city-installed, tamper evident seals or locks. Breaking this seal or lock without prior authorization by the Director shall be a violation of the ZDP and this chapter. V. Wastewater discharge permit application contents. All users required to obtain a wastewater discharge permit or general permit shall submit, at a minimum, the following information. The Director shall approve a form to be used as a permit application. Categorical users submitting the following information shall have complied with 40 CFR 403.12(b). (A) Identifying information. The user shall submit the name and address of the facility including the name of the operator and owners; (B) Permits. The user shall submit a list of any environmental control permits held by or for the facility; (C) Description of operations. The user shall submit a brief description of the nature, average rate of production, and Standard Industrial Classification of the operation(s) carried out by such industrial user, including a list of all raw materials and chemicals used or stored at the facility that are, or could accidentally or intentionally be, discharged to the POTW; number and type of employees; hours of operation; each product produced by type, amount, process or processes, and rate of production; type and amount of raw materials processed (average and maximum per day) and the time and duration of discharges. This description should also include a schematic process diagram that indicates points of discharge to the POTW from the regulated or manufacturing processes. Disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers and appurtenances by size, location, and elevation. (D) Flow measurement. (1) Categorical user. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: (a) Regulated or manufacturing process streams; and (b) Other streams as necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e). (c) The city may require a categorical industrial user to install flow monitoring facilities, instruments, and recording devices to enable accurate measurement of flows as determined to be necessary. (2) Non-categorical user. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: (a) Total process flow, wastewater treatment plant flow, total plant flow, or individual manufacturing process flow as required by the Director. (b) The Director may allow for verifiable estimates of these flows where justified by cost or feasibility considerations. However, the city may require a non-categorical industrial user to install flow monitoring facilities, instruments, and recording devices to enable accurate measurement of flows as determined to be necessary. (E) Measurements of pollutants. (1) Categorical user. (a) The user shall identify the applicable pretreatment standards for each regulated or manufacturing process. (b) In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass) where required by the categorical pretreatment standard or as required by the Director of regulated pollutants (including standards contained in Section 52.03(II)—(V), as appropriate) in the discharge from each regulated or manufacturing process. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures outlined in Section 52.06. (c) The user shall take representative samples to compile that data necessary to comply with the requirements of this paragraph. (d) Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) for a categorical user covered by a categorical pretreatment standard this adjusted limit along with supporting data shall be submitted as part of the application. (2) Non-categorical user. (a) The user shall identify the applicable pretreatment standards for its wastewater discharge. (b) In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass where required by the Director) of regulated pollutants contained in Section 52.03(II)—(V), as appropriate in the discharge. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures outlined in Section 52.06. (c) The user shall take representative samples to compile that data necessary to comply with the requirements of this subsection. (d) Where the Director developed alternate concentration or mass limits because of dilution this adjusted limit along with supporting data shall be submitted as part of the application. (F) Certification. A statement, reviewed by an authorized representative of the user and certified by a qualified professional as outlined in Section 52.04(VI), indicating whether the applicable pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet the applicable pretreatment standards and requirements. (G) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the applicable pretreatment standards, the Director will establish the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The schedule shall conform to the requirements of Section 52.05(IV). The completion date in this schedule shall not be later than the compliance date established pursuant to Section 52.03(XI). (1) Where the user's categorical pretreatment standard has been modified by a removal allowance (40 CFR 403.7), the combined wastestream formula (40 CFR 403.6(e)), and/or a fundamentally different factors variance (40 CFR 403.13) at the time the user submits the report required by this paragraph, the information required by paragraphs (D) and (E) of this section shall pertain to the modified limits. (2) If the categorical pretreatment standard is modified by a removal allowance (40 CFR 403.7), the combined wastestream formula (40 CFR 403.6(e)), and/or a fundamentally different factors variance (40 CFR 403.13) after the user submits the report required by paragraphs (D) and (E) of this section, then a new report shall be submitted by the user within 60 days after the modified limit is approved. (H) Any other information as may be deemed necessary by the Director to evaluate the wastewater discharge permit application. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. VI. Signatory and certification requirement. All wastewater discharge permit applications and user reports shall be signed in ink by an authorized representative of the user and contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of assessment and imprisonment for knowing violations." All wastewater discharge user reports with approved monitoring waivers shall be signed in ink by an authorized representative of the user and contain the following certification statement: "Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR _____ [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of _____ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report." The city may develop procedures for receipt of electronic reports for any reporting requirements of this chapter. Such procedures will comply with 40 CFR Part 3. These procedures shall be enforceable under Section 52.10 of this chapter. VII. Wastewater discharge permit decisions. The Director will evaluate the data furnished by the user and may require additional information. The Director will determine whether or not to issue a wastewater discharge permit or general permit. The Director may deny any application for a wastewater discharge permit or a general permit. VIII. Wastewater discharge permit and general permit contents. Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the Director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (A) Wastewater discharge permits and general permit shall contain the following conditions: (1) A statement that indicates wastewater discharge permit or general permit duration, which in no event shall exceed five years. A wastewater discharge permit or a general permit may be issued for a period less than five years, at the discretion of the Director. Each individual permit or general permit will indicate a specific date upon which it will expire; (2) A statement that the wastewater discharge permit or general permit is non-transferable without prior notification to and approval from the Director, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit or general permit; (3) Effluent limits based on applicable general pretreatment standards, categorical pretreatment standards, local limits, best management practices (BMPs), and state and local law; (4) Self monitoring, sampling, reporting, notification, submittal of technical reports, compliance schedules, and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; (5) The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with Section 52.05(III)(L) of this chapter. (6) Requirement for notification within 24 hours of becoming aware to the Director where self-monitoring results indicate non-compliance; (7) Requirement to report a by-pass or upset of a pretreatment facility; (8) Requirement for immediately notifying the WRF of any changes at its facility affecting the potential for spills and other accidental discharges, or slug load as defined in Section 52.01(III). Also see Sections 52.03(XII) and 52.05(VII); (9) Requirement for the SIU who reports non-compliance to repeat the sampling and analysis and submit results to the Director within 30 days after becoming aware of the violation; and (10) A statement of applicable civil, criminal, and administrative penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. (11) Requirements to control slug discharge, if determined by the Director to be necessary. (12) Any grant of the monitoring waiver by the Director must be included as a condition in the user's permit (or other control mechanism). (B) Wastewater discharge permits and general permits may contain, but need not be limited to, the following conditions: (1) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (2) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (3) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or routine discharges; (4) Require any user to prepare and submit plans or implement measures that provide for pollution prevention, recycling, source reduction, waste minimization, or best management practices to reduce the amount or concentration of pollutants discharged to the POTW; (5) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW. Require payment to cover the added cost of handling and treating the wastewaters not covered by existing fees or charges; provided however, any such wastewater discharges shall be in compliance with the federal categorical pretreatment standards and general or specific discharge prohibitions; (6) Requirements for installation and maintenance of inspection and sampling facilities and equipment; (7) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those that become effective during the term of the wastewater discharge permit; and (8) Require as a condition of any industrial wastewater discharge permit that the permittee indemnify and hold harmless the city from any and all damages, liabilities, fines, penalties, and costs resulting from violations of federal or state law that were caused or contributed to by the permittee's discharge. (9) Other conditions as deemed appropriate by the Director to ensure compliance with this chapter, and state and federal laws, rules, and regulations. IX. Wastewater discharge permit appeals. Any person, including the user, may petition the Director to reconsider the terms of a wastewater discharge permit within 30 days of its issuance, or any permit modification. Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal. In its petition, the appealing party shall indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the wastewater discharge permit. Appealing party shall submit any information submitted by the Director. The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. If the Director fails to act within 60 days of the receipt of an appeal, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit, shall be considered final administrative actions for purposes of judicial review. Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision shall do so by filing a petition for review with the Montgomery County Common Pleas Court within 30 days following the final administrative wastewater discharge permit decision. X. Wastewater discharge permit duration. Wastewater discharge permits shall be issued for a specified time period, not to exceed five years. A wastewater discharge permit may be issued for a period less than five years, at the discretion of the Director. Each wastewater discharge permit will indicate a specific date upon which it will expire. The wastewater discharge permit will expire at 11:59 p.m. on the specified date. XI. Wastewater discharge permit or general permit modification. (A) The Director may modify the wastewater discharge permit or general permit for good cause including, but not limited to, the following: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the public, city's POTW, city personnel, or the receiving waters; (5) Violation of any terms or conditions of the wastewater discharge permit or general permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit or general permit application or in any required reporting; (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (8) To correct typographical or other errors in the wastewater discharge permit; or (9) To reflect a transfer of the facility ownership and/or operation to a new owner/operator. (B) Any permit modification may be appealed under Section 52.04(IX). XII. Wastewater discharge permit or general permit transfer. (A) Wastewater discharge permits or general permit may be transferred to a prospective permittee only if the current permittee gives at least 90 days' advance notice to the Director and the Director approves the wastewater discharge permit transfer. The notice to the Director shall include a written certification by the prospective permittee that: (1) States that the prospective permittee has no immediate intent to change the facility's operations and processes; (2) Identifies the specific date on which the transfer is to occur; (3) Acknowledges full responsibility for complying with the existing wastewater discharge permit; and (4) States that a copy of this permit has been provided to the prospective permittee. A permit may only be transferred if all outstanding assessments, fees, and penalties have been paid. (B) Provided that the above occurs and that there were no significant changes to the manufacturing operation or wastewater discharge, the new owner will be considered an existing user and be covered by the existing limits and requirements in the previous owner's permit. Failure to obtain prior approval pursuant to these regulations shall render the current permittee jointly and severally liable, with the new owner for any assessments and/or penalties, owed or incurred. XIII. Wastewater discharge permit or general permit revocation. (A) Wastewater discharge permits or general permit may be revoked for the following reasons: (1) Failure to notify the Director of significant changes to the wastewater prior to the changed discharge; (2) Failure to provide prior notification to the Director of changed conditions; (3) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit or general permit application; (4) Falsifying self-monitoring reports; (5) Tampering with monitoring equipment; (6) Refusing to allow the Director timely access to the facility premises and records; (7) Failure to meet discharge limitations; (8) Failure to pay fees and/or assessments; (9) Failure to pay sewer charges; (10) Failure to meet compliance schedules; (11) Failure to complete a wastewater survey, general permit, or the wastewater discharge permit application; (12) Failure to provide advance notice of the transfer of a permitted facility; (13) If the city has to invoke its emergency provision as cited in Section 52.10(VIII); (14) Violation of any pretreatment standard or requirement; (15) Violation of any terms of the wastewater discharge permit or the general permit; (16) Violation of any provisions of this chapter; or (17) Violation of any terms of an order of the Director issued under this chapter. (B) Wastewater discharge permits or general permits may be revoked by the Director on determination that the facility has ceased operations. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit or general permit to that user. XIV. Wastewater discharge permit and general permit re-issuance. A user, required to have a wastewater discharge permit or general permit, shall apply for wastewater discharge permit re-issuance by submitting a complete wastewater discharge permit application, in accordance with Section 52.04(V), a minimum of 90 days prior to the expiration of the user's existing wastewater discharge permit. A user, whose existing wastewater discharge permit bas expired and has submitted its re-application in the time period specified herein, may continue to lawfully operate under the terms and conditions of the expired permit until the Director issues or denies the new wastewater discharge permit. A user, whose existing wastewater discharge permit has expired and who failed to submit its re-application in the time period specified herein, will be deemed to be discharging without a wastewater discharge permit.

(Ord. 30739-08, passed 4-23-08; Ord. 32153-25, passed 8-6-25)

Ask a question about Dayton law

Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.