§ 172.10.15 — Fees
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 172.10.15
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/23fab787-d288-484b-9ed0-2b1c0b4e49ba
§ 172.10.15. - Fees.
The fee for each permit or reinspection shall be as follows and shall be paid when the application is filed, in the case of a permit fee, or in the case of a reinspection fee prior to the reinspection: (a) Electrical service entrances. 1. Existing structures. All current consuming outlets are included. Ampere Service Up to 100 .....$ 25 101 to 225 .....45 226 to 400 .....75 401 to 800 .....110 801 to 1200 .....145 1201 to 1600 .....165 1601 to 2000 .....200 Above 2000 .....245 2. New structures. All current consuming outlets are included. Ampere Service Up to 100 .....$ 35 101 to 225 .....60 226 to 400 .....125 401 to 800 .....245 801 to 1200 .....365 1201 to 1600 .....540 1601 to 2000 .....605 Above 2000 .....850 3. Trailer courts. ..... For the first ten pedestals, each .....$15 All pedestals thereafter, each .....10 For each trailer connection .....15 (b) No service work. ..... 1. Moved structures .....$20 2. New wiring, rewiring existing structures (Every 5000 square feet or portion thereof) .....20 3. Signs, each .....20 4. Reinspection .....20 5. Permit fee where no fee is specifically indicated .....20 6. Inspection outside of normal business hours, per hour .....20 (c) Transfer fees. In the event an electrical permit is to be transferred to another registered electrical contractor, the contractor to whom the transfer has been made shall obtain a new electrical permit. If no changes will be made to the original scope of work, and the permit has not expired, the transfer fee will be $20. (d) Refunds. Any applicant or permittee who decides not to proceed with the work proposed, may file a request for a refund. If the request is made within 60 days of the application date, the department shall provide a full refund. If the request for refund is made more than 60 days but less than 120 days of the application date, the applicant will be allowed a refund of 80% of the original fee. No refunds will be granted if a request is not made within the time frames stated above or if any electrical work has begun. (e) When any work for which a permit is required by this chapter has commenced without first obtaining a permit, a fee of either $100 or an amount equal to the permit fee, whichever is greater, shall be assessed. This fee shall be in addition to the normal permit fee, and any other fine or fee that may be applicable.
(Ord. No. 826-12-06, § 1(Exh. A), 12-19-06)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.