Sec. 16-5.02.140: - Fills
(a) Height. A finished fill slope greater than fifteen feet high must be approved by the Planning Commission. Higher fill slopes shall have a horizontal bench at least twenty-five feet wide for each fifty feet of height, and intervening terraces may be required as set forth in subsection (7) of this Section.
(b) Slope. No fill shall be made which creates an exposed surface steeper in slope than two horizontal to one vertical.
(c) Preparation of Ground. The ground surface shall be prepared to receive fill by removing vegetation, non-complying fill, topsoil and other unsuitable materials scarifying to provide a bond with the new fill and, where slopes are steeper than five to one and the height is greater than five feet, by benching into sound bedrock or other competent material as determined by the soils engineer. The bench under the toe of a fill on a slope steeper than five to one shall be at least ten feet wide. The area beyond the toe of fill shall be sloped for sheet overflow or a paved drain shall be provided. When fill is to be placed over a cut, the bench under the toe shall be at least ten feet wide but the cut shall be made before placing the fill and acceptance by the soils engineer or engineering geologist or both as a suitable foundation for fill.
(d) Fill Material. Detrimental amounts of organic material shall not be permitted in fills. Except as permitted by the Building Official, no rock or similar irreducible material with a maximum dimension greater than twelve inches shall be buried or placed in fills.
EXCEPTION: The Building Official may permit placement of larger rock when the soils engineer properly devises a method of placement, continuously inspects the placement and approves the fill stability. The following conditions shall also apply:
(1) Prior to issuance of the grading permit, potential rock disposal areas shall be delineated on the grading plan;
(2) Rock sizes greater than twelve inches in maximum dimension shall be ten feet or more below grade, measured vertically;
(3) Rocks shall be placed so as to assure filling of all voids with fines.
(e) Unstable Material. The Building Official may require that the fill be constructed with an exposed surface flatter than two horizontal to one vertical if a flatter surface is necessary for stability or safety.
(f) Fill Slope Limits. Toes of fill slopes shall not be nearer to a project boundary than one-half the height of the fill but need not exceed a horizontal distance of twenty feet. Fill slopes shall not be divided horizontally by property lines. Fill slopes occurring on a side or rear lot line shall be made a part of the downhill lot.
(g) Intervening Terraces. Terraces shall be paved, shall be extensively landscaped and shall be spaced at vertical intervals of thirty feet. For slopes less than forty feet high, the terrace shall be at mid- height. Additional terraces may be required on slopes flatter than two horizontal to one vertical and where soil conditions warrant them.
(h) Compaction.
(1) All fills shall be placed, compacted, inspected and tested in accordance with this subsection.
(2) The Building Official may waive strict enforcement of the provisions of this subsection if they are unnecessary because of the proposed or probable use of the land. The requirements of this subsection shall not be waived if structures are to be supported by the fill, if the fill is being placed on a hillside or if these requirements are necessary as a safety measure.
(3) The natural ground surface shall be prepared to receive fill by removing vegetation, non-complying fill, top soil and porous compressible soil. If the natural slope is five horizontal to one vertical or steeper, and the height of the fill is twenty feet or more, benching to sound bedrock or other competent material is required. Fill slopes which toe on natural slopes shall be provided with adequate drainage.
(4) No deleterious material shall be permitted in fills.
(i) Except as otherwise permitted by the Building Official, no rock or similar irreducible material with a maximum dimension greater than twelve inches shall be buried or placed in fills.
(ii) Upon a recommendation made by a soils engineer and approved by the Building Official before the grading of a project, rock with dimensions from eight inches to thirty-six inches may be placed in compacted fill, but oversized rocks shall not be in the upper ten feet of compacted fill or nearer than twenty feet to the outer surface of any fill slope. Oversize rock shall be shown on "as built" plans and shall be certified to be compacted by the soils engineer.
(5) The fill shall be spread in a series of layers no more than eight inches thick. Each layer shall be compacted by an approved method.
(6) The moisture content of the fill material shall be controlled at the time of spreading and compacting to obtain the required relative compaction and to avoid excessive pore pressure as the fill increases.
(7) Fill shall be compacted to at least ninety percent of the maximum density as determined by A.S.T.M. D1557-66T, Method A or C, modified to three layers. If the required degree of relative compaction cannot be attained on sloped surfaces, the slope shall be cut back until the compacted inner core is exposed.
(8) A field density test shall be taken for each eighteen inches of fill, measured vertically from the lowest point of the fill, or for each one thousand cubic yards of fill. In subdivisions, at least one field density test shall be taken on each lot which receives fill.
(9) The field density shall be measured in accordance with the procedure specified in A.S.T.M. D1556-58T, or a later revision, using the optional base plate and making a suitable adjustment for volumes of rocks in the test hole or by using other approved testing methods giving equivalent test results.
(10) A fill subject to this Chapter shall be tested for relative compaction by a soils engineer. A certificate of compliance with the terms of this Section and the grading permit which sets forth densities, relative compaction, the soil expansion rate, allowable bearing value and other soil characteristics shall be prepared and signed by the soils engineer. This report shall be submitted to and approved by the Building Official before a fill is finally approved and foundation construction begins.
(11) If building is not started within one year from the final certification and approval by the Building Official, the site must be re-evaluated and a report filed with the Building Official for approval. This report shall contain data on compaction, stabilization and soil expansion.
(i) Fills Toeing Out on Steep Slopes. No fill shall toe out on a natural slope which is steeper than two horizontal to one vertical.
(j) Combined Cut and Fill Slopes.
(1) Combined cut and fill slopes shall meet the requirements of subsections (1) through (4) of this Section with respect to steepness, height and benching. A slope which exceeds twenty-five feet in height must have the required drainage bench at the top.
(2) Fill placed on or above the top of an existing or proposed cut or natural slope steeper than three horizontal to one vertical shall be set back from the top of the slope at least six feet.
(3) The top of cut slopes shall be made not nearer to a site boundary line than one-fifth of the vertical height of cut with a minimum of two feet and a maximum of ten feet. The setback may need to be increased for any required interceptor drains.
(4) The toe of fill slope shall be made not nearer to the site boundary line than one-half the height of the slope with a minimum of two feet and a maximum of twenty feet. Where a fill slope is to be located near the site boundary and the adjacent off-site property is developed, special precautions shall be incorporated in the work as the Building Official deems necessary to protect the adjoining property from damage as a result of such grading. These precautions may include but are not limited to:
(i) Additional setbacks;
(ii) Provision for retaining or slough walls;
(iii) Mechanical or chemical treatment of the fill slope surface to minimize erosion.
EXCEPTION: When slopes are not in excess of eighteen inches, the Building Official may waive the slope setback requirements.
(iv) Provisions for the control of surface waters.
(5) The Building Official may approve alternate setbacks. The Building Official may require an investigation and recommendation by a qualified engineer or engineering geologist to demonstrate that the intent of this Section has been satisfied.