§ 52.07 — Compliance monitoring
Code of Ordinances, City of Dayton, Ohio (Supp. No. 36: codified through Ordinance No. 32173-25, passed December 31, 2025) · Dayton City Code § 52.07
Corpus is an independent public-information project, not the official City of Dayton website. Stable reference: corpuslaw.us/code/da930285-9ddb-4b53-9160-8a8eb7683ad4
Sec. 52.07. - Compliance monitoring.
I. Inspection and Sampling. Continued connection and use of the City of Dayton sewer system shall be contingent upon the right of the Director to inspect and sample all discharges into the system. The Director, bearing proper identification, shall have the right to enter the facilities of any user for the purpose of the enforcement of this chapter, and to determine that any wastewater discharge permit or order issued hereunder, is being met and whether the user is complying with all requirements thereof. Users shall allow the Director ready access to all parts of the premises, including easements, for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. (A) Where a user has security measures in force that require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the Director will be permitted to enter without delay for the purposes of performing specific responsibilities. (B) The Director shall have the right to set up on the user's property, or require installation of such devices as are necessary to conduct sampling and/or metering of the user's operations. (C) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the Director and shall not be replaced. The costs of clearing such access shall be borne by the user. (D) Unreasonable delays in allowing the Director access to the user's premises shall be a violation of this chapter. (E) While performing the necessary work on private properties referred to in this section, the Director shall observe all safety rules established by the owner or occupant of the property and applicable to the premises. (F) During the performance on private properties of inspections, wastewater sampling; or other similar operations referred to in this section, the owner or occupant shall be indemnified against loss of or damage to property of the owner or occupant by the Director, except as such may be caused by negligence or failure of the owner or occupant to maintain safe conditions as required by § 52.07 II. (G) No person shall assault, abuse, harass, or otherwise interfere with the Director's performance of any activity authorized by this chapter. II. Monitoring Facilities/Control Manholes. (A) Each user shall provide and operate at its own expense a secure, readily and safely accessible monitoring facility or control manhole to allow inspection, sampling, and flow measurements of each sewer discharge to the city. Each monitoring facility or control manhole shall be situated on the user's premises, except where such a location would be impractical or cause undue hardship on the user, the Director may concur with the facility or manhole being constructed in the public street or sidewalk area, providing that the facility is located so that it will not be obstructed by landscaping or parked vehicles. The Director, whenever applicable, may require the construction and maintenance of monitoring facilities or control manholes at other locations (for example, at the end of a manufacturing line, wastewater treatment system). (B) There shall be ample room in or near such monitoring facility or control manhole to allow accurate sampling, flow measurement and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. All monitoring facilities or control manholes shall be constructed and maintained in accordance with all applicable local construction standards and specifications. (C) The Director may require the user to install monitoring equipment as necessary. All devices used to measure wastewater flow and quality shall be calibrated to ensure their accuracy. (D) Monitoring of wastewater characteristics for any purpose shall be conducted at a frequency deemed necessary by the Director. III. Search Warrants. If the Director has been refused access to a building, structure or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this chapter, or that there is a need to inspect as part of a routine inspection program of the city designed to verify compliance with this chapter or any wastewater discharge permit or order issued hereunder, or to protect the overall public health, safety and welfare of the community, then the Director shall seek issuance of a search and/or seizure warrant from the City of Dayton Municipal Court, the Montgomery County Common Pleas Court, or the U.S. Federal District Court. Such warrant shall be served at reasonable hours by the Director and may be accomplished in the company of a uniformed police officer that has jurisdiction. IV. Vandalism. No person shall willfully or negligently break, damage, destroy, uncover, deface, tamper with, or prevent access to any structure, appurtenance or equipment, or other part of the POTW. Any person found in violation of this requirement shall be subject to the sanctions set out in this chapter.
(Ord. 30739-08, passed 4-23-08)
Ask a question about Dayton law
Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
