§ 169.04 — Minimum Erosion Control Requirements

Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 169.04

Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/4ae83595-8fdf-4054-bda0-02ee4da204a5

169.04 - Minimum Erosion Control Requirements

If exempt under §169.03, a grading permit is not required. However, exempt as well as non-exempt activities shall be subject to the following minimum erosion and sedimentation control measures. (A) The City Council hereby adopts by reference the Drainage Criteria Manual, prepared for the City of Fayetteville, and adopted by Ordinance No. 5702 of the City of Fayetteville and as may be amended from time to time by the City Engineer. All minimum erosion and sediment control standards contained therein shall have the same force and effect as if printed word for word in this chapter. Development projects also must comply with their Arkansas Department of Environmental Quality general construction permit. All projects shall follow Chapter 8, Construction Site Stormwater Management, of the Drainage Criteria Manual as well to achieve site compliance. (B) Stabilization. A record of the dates when grading activities occur, when construction activities temporarily or permanently cease on a portion of the site, and when stabilization measures are initiated shall be included in the erosion and sediment control plan. Except as provided in subsections (1) and (2) below, stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than fourteen (14) days after the construction activity in that portion of the site has temporarily or permanently ceased. (1) Where the initiation of stabilization measures by the fourteenth day after construction activity temporarily or permanently ceases is precluded by snow cover, stabilization measures shall be initiated as soon as practicable. (2) Where construction activity will resume on a portion of the site within twenty-one (21) days from when activities ceased, (e.g., the total time period that construction activity is temporarily ceased is less than twenty-one (21) days) then stabilization measures do not have to be initiated on that portion of the site by the fourteenth day after construction activity temporarily ceased. (3) Stabilization practices may include: temporary seeding, permanent seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of trees, and preservation of mature vegetation and other appropriate measures. See Chapter 167 of the UDC for tree protection requirements. (C) Intermittent/Perennial Streams. Grading activities will meet the Streamside Protection Requirements found in §168.12, Streamside Protection Zones. Fording of streams with construction equipment or other activities which destabilize stream banks shall not be permitted. In instances where streams are not protected under §168.12, no intermittent or perennial stream, including a 25-foot perimeter strip measured from the top of the bank, shall be graded, developed, channeled, or physically altered unless adequate guarantees are made for erosion and sedimentation control both during construction and post construction. Likewise, cuts or fills shall be setback sufficiently from intermittent and perennial streams and other stormwater drainage systems to guarantee that there will be no damage from erosion or sedimentation. Final erosion and sedimentation control measures shall be approved by the City Engineer. (D) Excavation Material. Excavation material shall not be deposited in or so near streams and other stormwater drainage systems where it may be washed downstream by high water or runoff. All excavation material shall be stabilized immediately with erosion control measures.

(Code 1991, §161.04; Ord. No. 3551, 6-5-91; Ord. No. 3947, §1, 2-6-96; Ord. No. 4100, §2 (Ex. A), 6-16-98; Ord. No. 4113, §1, 8-18-98; Ord. 4855, 4-18-06; Ord. No. 5336, 8-3-10; Ord. No. 5702, Repealed & Replaced Chp. 169, 8-5-14; Ord. No. 6061, §5, 4-17-18; Ord. No. 6446, §11(Exh. F), 6-15-21)