§ 169.14 — Stormwater Discharges from Construction Activities

Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 169.14

Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/3cf3a560-2c38-47fd-abd4-b60ab2f6a4a1

169.14 - Stormwater Discharges from Construction Activities

(A) Purpose. The purpose of this section is to provide for the reduction of pollutants to the city's MS4 as required by its National Pollutant Discharge Elimination System (NPDES) permit. (B) General Requirements for Construction Sites. (1) Construction Site. A construction site is a site with activity that would result in the creation of a new stormwater management system, including the building, assembling, expansion, modification, or alteration of the existing contours of the property; the erection of buildings or other structures, any part thereof; or land clearing. (2) Owner Responsibility. The owner of a site of construction activity shall be responsible for compliance with the requirements of this chapter. (3) Erosion and Sediment Control. Best Management Practices (BMPs) shall be implemented to prevent the release of airborne dust and waterborne sediment from construction sites. Disturbed areas shall be minimized, disturbed soil shall be managed, and construction site entrances/exits shall be managed to prevent sediment tracking. Streets and storm inlets must be kept clean at all times and free of loose rock, mud, debris and trash. Specific inlet protection measures may be necessary, as long as they do not interfere with vehicular traffic. Mud on streets must be physically removed and not washed into inlets. (4) Debris, Mud, and Soil in Public Streets. All necessary modifications to stormwater best management practices should be immediately implemented in order to prevent further track-out. Debris, mud and soil shall not be allowed on public streets but if any debris, mud, or soil from development sites reaches the public street it shall be immediately removed via sweeping or other methods of physical removal. (a) Debris, mud, or soil in the street may not be washed off the street or washed into the storm drainage system. Storm drainage systems downstream of a development site should be protected from debris, mud, or soil in the event that debris, mud, or soil reaches the drainage system. (b) Use of a power broom or mechanical sweeper on a regular basis is not allowed as an acceptable BMP for keeping Debris, Mud and Soil off Public Streets unless equipped with water and vacuum capabilities. (5) Construction Sites Requiring Storm Water Pollution Prevention Plans. Erosion and sediment control systems must be installed and maintained per a state approved Storm Water Pollution Prevention Plan (SWPPP) before the beginning of construction and until slope stabilization and/or vegetation is established. For sites between 1 and 5 acres, the SWPPP and Notice of Coverage (NOC) must be onsite at all times. For sites over 5 acres, the SWPPP and NOC must be onsite at all times. The site owner bears responsibility in accordance with the Arkansas Department of Environmental Quality standards and general permit. (6) Construction Exits. A stabilized rock exit is required on construction sites. If track out becomes an issue, the City may also require tire wash down areas or other measures to prevent track out. (7) Concrete Truck Wash Areas. No washing of concrete trucks or chutes is allowed except in properly located and constructed concrete wash pits. Proper runoff and erosion controls must be in place to retain all concrete wash water. (8) Dewatering. All rainwater pumped out of sumps and depressions on construction sites should be clear and free of sediment. BMPs such as dewatering bags and dewatering into vegetated areas shall be utilized at all times. (9) Storage of Materials. Public streets and sidewalks shall not be used for temporary storage of any containers or construction materials, especially loose gravel and topsoil. In addition to on-street storage being a violation of this chapter, all liability for any accidents and/or damages due to such storage will be the responsibility of the owner of the stored materials. (10) Dirt and Topsoil Storage. All storage piles of soil, dirt or other building materials (e.g., sand) shall be located more than 25 feet from a roadway, drainage channel or stream (from top of bank), wetland, and stormwater facility. Topsoil piles surfaces must be immediately stabilized with appropriate stabilization measures. (11) Franchise and Private Utilities. The property owner or main contractor onsite will be responsible for restoring all erosion and sediment control systems and public infrastructure damaged or disturbed by underground private or franchise utility construction such as water and sewer service leads, telephone, gas, cable, etc. Erosion and sediment control systems must be immediately restored after each utility construction. (12) The landscape of erosion control features shall be maintained until completion of construction.

(Ord. No. 6446, §12(Exh. G), 6-15-21)