§ 5.0 — Pavement Materials and Design
Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 5.0
Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/2404d9a9-e43d-41a5-9351-30cc9ec8a825
5.0 - Pavement Materials and Design
5.1 General. Street pavement structure shall be flexible type consisting of an asphalt concrete hot mix (ACHM) pavement or rigid type consisting of a Portland cement concrete pavement. P.C. Concrete Pavement shall be required by the Director of Engineering for streets with longitudinal grades in excess of 10%. Flexible pavements may be conventional construction composed of an aggregate base course with an ACHM binder and/or surface course or a full-depth asphalt structure utilizing an ACHM base course. Pavement structures shall be designed in accordance with the procedures and criteria provided in Section 5.4. Typical sections for each functional classification are provided in Master Street Plan. Construction details for various street elements are provided in the City of Fort Smith Standard Drawings. Additional quality control and testing procedures are discussed in Section 9. Materials, construction procedures, and testing shall comply with the City of Fort Smith Standard Specifications. 5.2 Pavement Materials and Construction. 5.2.1 Subgrade Stabilization. Pavement subgrade shall be stabilized by conventional mechanical compaction. Chemical stabilization shall not be used. The adequacy of in-situ soils as a pavement subgrade shall be evaluated in accordance with Section 5.3. Soils classified A-6 and A-7 (AASHTO System), i.e. clays, and which have a liquid limit greater than 40 or a plasticity index greater than 15 shall be replaced (undercut). Soils within the upper 24 inches of the flexible pavement structure shall not be highly susceptible to frost action (soils classified A-4 and A-5 including sandy silts, fine silty sand or lean clays are highly susceptible to frost action). Methods and procedures for establishing the depth of soil replacement or other improvements shall be specified in the design data and project specifications. Subgrade compaction shall meet the requirements of the City of Fort Smith Standard Specifications. 5.2.2 Aggregate Base Course. Materials for aggregate base courses shall meet the requirements of the City of Fort Smith Standard Specifications. 5.2.3 ACHM Courses. Materials for asphalt concrete hot mix (ACHM) base, binder, and surface courses shall meet the requirements of the City of Fort Smith Standard Specifications. Flexible pavement surfacing shall be ACHM Surface Course (Type 3). ACHM Surface Course (Type 2) shall be used only when specifically directed by the Engineer and authorized by the City. 5.2.4 P.C. Concrete Pavement. Materials for P.C. Concrete Pavement shall meet the requirements of the City of Fort Smith Standard Specifications. Rigid pavement shall be non-reinforced or reinforced and constructed on a prepared subgrade or base course. Joint layout details shall be provided in the construction plans when P.C. Concrete Pavement is utilized as a surface course. 5.2.5 Curb and Gutter. All streets shall have concrete curb and gutter, except estate type streets, meeting the requirements of the City of Fort Smith Standard Specifications and Standard Drawings. Rigid pavements may have either integral curbs or independent curb and gutter. Estate type streets shall have paved shoulders surfaced with ACHM surface course matching the travel lane thickness. 5.2.6 Subsurface Drainage. Pipe underdrains shall be installed at all locations where subsurface moisture will affect the stability of the subgrade or result in unsatisfactory pavement performance. Longitudinal pipe underdrains shall be installed along each side of the street located in a cut condition. Pipe underdrains will not be required at locations where longitudinal storm drains are present. The Engineer shall perform adequate subsurface investigations to properly evaluate the subsurface conditions. A report shall provide a mitigation strategy, for approval by the Director of Engineering, if groundwater is encountered within the 5 feet of the existing or proposed ground surface. This information shall be included and addressed in the geotechnical report. 5.3 Subgrade Investigation and Evaluation. The investigation and evaluation of subgrade soils shall be an integral part of the pavement design and shall include the following minimum requirements. All testing and related work shall be accomplished by a geotechnical firm approved by the City. The subgrade, as referenced in this standard, shall represent material 24 inches below the bottom of base layer (aggregate base or ACHM base course). Subgrade limits shall extend 2' behind back of curb for asphalt streets and 4' behind back of curb for concrete streets. Additional investigation will be required where a variation in soil types or other subsurface conditions exist. 5.3.1 Sampling and Testing. The investigation and sampling of soils shall conform to AASHTO R 13 (ASTM D 420) and test procedures referenced therein. Sampling of subgrade soils shall be accomplished by boring or by excavation of test pits. A minimum of one boring or test pit shall be provided for any street segment. The distance between borings shall not exceed 500 linear feet and shall be evenly spaced. Depth of borings or test pits shall be a minimum of 5 feet below the proposed subgrade elevation in cut areas or 5 feet below existing grade in fill areas. Gradation, Atterberg limits, maximum compaction, and load bearing strength testing shall be provided to determine suitability of soils for use as subgrade material within the street. All sampling and testing of soils shall be performed under the direct supervision of an Engineer who must sign and stamp the geotechnical report. 5.3.1.1 Soils Classification. Subgrade soils shall be classified in accordance with the AASHTO System (AASHTO M 145). All tests required for classification of soils as referenced in AASHTO M 145 shall be performed and reported unless specific tests are waived by the City. Select material used in subgrade or subbase construction shall be tested and classified. Select material shall meet the requirements of the City of Fort Smith Standard Specifications. 5.3.1.2 Moisture-Density Relationship. Compaction testing of soils proposed for use as subgrade material shall be performed in accordance with AASHTO T-99 (Standard Proctor Test) methods. 5.3.1.3 Load Bearing Strength. Load bearing strength of soils shall be determined by the California Bearing Ratio Test (CBR) in accordance with AASHTO T 193 or ASTM D 1883. A minimum of one test shall be performed for each 500 linear feet of street; additional tests will be required where significant variation in soil conditions occurs. Samples for CBR tests shall be obtained within the proposed 24" subgrade elevation range. For CBR testing, the specimen shall be molded at approximately the optimum moisture content and 95 percent of the maximum dry density as determined by the corresponding laboratory proctor tests. CBR tests will be required for all in-situ soils, select material and on-site borrow utilized in the subgrade construction. 5.3.2 Subgrade Support Capacity. Subgrade support capacity for flexible type pavements shall be determined from the load bearing strength (CBR) of the soils based on the correlation provided in Section 5.4. 5.3.3 Subgrade Requirements. At minimum, the top 24 inches of subgrade shall meet the following specifications unless an individual design, with calculations, is provided: A. | AASHTO Soil Classification: | A-1, A-2-4, or A-2-5 Passing no. 200 Sieve: | 35% max. California Bearing Ratio (CBR): | ≥ 6 B. | Material not meeting the soil classification and graduation requirements in section A, but meeting the following specifications: AASHTO Soil Classification | A-2-6, A-6 California Bearing Ratio (CBR): | ≥ 6 Plasticity Index: | 15 max. Replacement of soils up to 4' in depth may be required by the City dependent upon testing results in soils report and/or field conditions. 5.4 Pavement Design Criteria. 5.4.1 Design Method. Pavement thickness shall be designed by the AASHTO Guide for Design of Pavement Structures, latest edition. Other design methods, including the Asphalt Institute method, may be approved on an individual basis. Thickness design criteria for the AASHTO method is provided in Section 5.4. Minimum criteria for thickness design is based on street classifications as defined in Section 3 of these standards. Streets classified as boulevard, arterial, collector and industrial must be designed on an individual basis and all criteria utilized must be documented. 5.4.2 Design Period. A minimum design period (traffic analysis period) of 20 years shall be used for pavement designs. 5.4.3 Traffic Analysis. Maximum traffic characteristics, including traffic volumes and 18-kip equivalent single axle loads (ESALs), are provided in Section 5.5 for predetermined residential street pavement sections. Traffic data shall be submitted for all street classifications, including residential, where traffic data doesn't fall below the maximum criteria provided. The basis for traffic projections shall be included in data submitted. The following equation shall be used when calculating the design traffic for 20 year projections: ESALs × DD × LD × 365 × 20 Where: ESALs = 18-kip Equivalent Single Axle Loads DD = Directional Distribution LD = Lane Distribution Two Lane: | ESALs × 0.5 × 1.0 × 20 × 365 Four Lane: | ESALs × 0.5 × 0.8 × 20 × 365 5.4.4 Resilient Modulus Correlation. The correlation of California Bearing Ratio (CBR) and Resilient Modulus for pavement design input should be made using the NCHRP 1-37A equation shown below: MR (psi) = 2555 × CBR 0.64 5.4.5 Design Reliability and Serviceability. The design reliability percentage and serviceability index inputs are shown for each functional classification in Table 7. Table 7: Design Reliability and Serviceability Inputs Design Reliability and Serviceability Inputs Classification | Reliability | Standard Deviation | Initial Serviceability | Terminal Serviceability | Performance Flexible | Rigid Boulevard | 95 | 0.45 | 0.35 | 4.5 | 2.5 | 2.0 Major Arterial | 95 | 0.45 | 0.35 | 4.5 | 2.5 | 2.0 Minor Arterial | 95 | 0.45 | 0.35 | 4.5 | 2.5 | 2.0 Industrial | 90 | 0.45 | 0.35 | 4.5 | 2.5 | 2.0 Major Collector | 85 | 0.45 | 0.35 | 4.5 | 2.5 | 2.0 Residential Collector | 85 | 0.45 | 0.35 | 4.5 | 2.5 | 2.0 Residential | 80 | 0.45 | 0.35 | 4.5 | 2.0 | 2.5 5.4.6 Pavement Material Parameters. Table 8 provides pavement material parameters including standard specification reference, structural coefficients, and thickness constraints. Table 8: Pavement Material Parameters Pavement Material Parameters Material | Specification 1 | Structural Coefficient | Thickness (in.) Minimum | Maximum ACHM Surface Course | Section 330 | 0.44 | 2 | 4 ACHM Binder Course | Section 330 | 0.44 | 3 | 6 ACHM Base Course | Section 310 | 0.36 | 4 | 12 Aggregate Base Course | Section 305 | 0.14 | 6 | 12 1 City of Fort Smith Standard Specifications 5.5 Minimum Residential Pavement Sections. Table 9 provides minimum pavement sections, based on the AASHTO method, for residential streets to be used in lieu of an individual pavement design if the project specific subgrade and traffic data fall within the given ranges. A geotechnical investigation shall be conducted to determine subgrade parameters prior to utilizing the minimum residential pavement sections. Traffic analyses shall be conducted to determine average daily traffic and 18 kip equivalent single axle loads (ESALs). For CBR values less than 6 and ESALs exceeding the maximum shown in Table 9, an individual pavement design, including calculations, shall be provided for City's approval. Table 9: Minimum Residential Pavement Sections Minimum Residential Pavement Sections Residential Street Classification | Residential1 Low Volume 0—30 Lots | Mid Volume 31—150 Lots | High Volume 151—300 Lots Traffic Characteristics2 Average Daily Traffic (Two-Way) | 200 | 700 | 1500 20 Yr. Design Traffic - ESALs | 14,600 | 36,500 | 73,000 Minimum Pavement Sections (in.)3 CBR4 | Type5 | Materials < 6 | Requires Individual Design ≥ 6 | F | ACHM Surface Course (Type 3) | 2.0 | 2.5 | 2.5 Aggregate Base Course | 7.0 | 8.0 | 9.0 FD | ACHM Surface Course (Type 3) | 2.0 | 2.0 | 2.0 ACHM Base Course | 4.0 | 4.5 | 5.0 R | Portland Cement Concrete | 7.0 | 7.0 | 7.0 ≥ 10 | F | ACHM Surface Course (Type 3) | 2.0 | 2.0 | 2.5 Aggregate Base Course | 6.0 | 7.5 | 7.0 FD | ACHM Surface Course (Type 3) | 2.0 | 2.0 | 2.0 ACHM Base Course | 4.0 | 4.0 | 4.0 R | Portland Cement Concrete | 7.0 | 7.0 | 7.0 1 Number of single family home lots - For a loop or cul-de-sac, it will equal the number of lots on that street. For a continuing (through) street, it will equal the number of lots that will use the street when entering/exiting the subdivision. 2 Maximum values. If results of traffic analysis indicate higher values, an individual pavement design shall be required. 3 Additional base thickness or subbase may be necessary to meet all design requirements. 4 California Bearing Ratio (CBR) 5 Type of Pavement Flexible Pavement F: ACHM Surface Course over Aggregate Base Course FD: ACHM Surface Course over ACHM Base Course (Full Depth Asphalt Pavement) Rigid Pavement R: P.C. Concrete Pavement 5.6 Pavement Design Report. When required, an individual pavement design report shall include the following information to be considered for approval. The report shall be signed and stamped by an Engineer. 1. Study Area a. Site vicinity map depicting project area b. Plat with street names labeled 2. Traffic Data a. Existing and Future Average Daily Traffic (ADT) b. Heavy truck percentage c. 18-kip Equivalent Single Axle Loads (ESAL) determination 3. Soils Report a. Field Investigation i. Method of subsurface exploration ii. Boring locations on scaled drawings iii. Boring logs b. Laboratory Testing (In-situ and borrow) i. Load bearing strength - California Bearing Ratio (CBR) ii. Natural water content iii. Atterberg limits iv. Sieve analyses v. AASHTO soil classification vi. Moisture-Density relationship (Procter Test) c. General Conditions i. Site conditions ii. Subsurface conditions iii. Subgrade support iv. Subgrade preparation d. Construction considerations 4. Pavement Design a. AASHTO pavement design calculations b. Recommended pavement sections
Ask a question about Fort Smith law
Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.
