§ 8.0 — Erosion Control
Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 8.0
Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/d257b7a9-2756-4c10-beab-6192cbf8f4f2
8.0 - Erosion Control
8.1 Construction Erosion Control. Erosion control measures shall be provided during construction to minimize soil erosion and to prevent silting of utility and storm drainage structures. Compliance with applicable ADEQ General Stormwater NPDES Permits requirements shall be required. The City of Fort Smith is designated as a small regulated MS4. 1. Access Temporary access for construction shall be provided at all points of ingress and egress to construction areas. Temporary access shall consist of a crushed stone or gravel drive extending a minimum of fifty feet from the edge of the existing street pavement. 2. On-Site All exposed construction areas shall be protected from erosion. Adequate measures shall be employed to prevent entrance of soils or other foreign materials into storm drainage or utility structures. 3. Compliance Erosion control measures must comply with the City's Fill and Grading Ordinance and the latest version of the ADEQ Construction General Stormwater Permit. 8.2 Permanent Erosion Control. Permanent erosion control measures including seeding, mulching, sodding etc. shall be used in all areas within rights-of-way and easements which are not covered by improvements.
Ask a question about Fort Smith law
Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.