6.0 - Utility Crossings

6.1 General. The Developer shall be responsible for coordinating the installation of franchise utility lines and water, wastewater and storm drain lines relative to street development. Design and installation of water, wastewater and storm drainage facilities shall conform to the current design criteria and related regulations for those facilities including the City of Fort Smith Standard Drawings and Standard Specifications. 6.2 Franchised Utility Lines. All franchised utility lines, which are underground, shall be installed in an encasement pipe under streets. The encasement pipe shall be installed by either the Developer or the utility before the subgrade is completed. 1. Encasement Length. The encasement length shall extend a minimum of six (6) feet beyond the back of curb 2. Encasement Depth. The minimum depth of cover for encasement pipe shall be twenty-four (24) inches measured from the top of the encasement pipe to the top of the subgrade. 6.3 Water, Wastewater and Storm Drain Lines. Water, wastewater and storm drain lines shall be installed before the subgrade is complete. Underdrains shall be required for proposed pavement structures located below the existing grade or in-situ soil where water will naturally flow toward pavement base and subgrade layers. Underdrains will not be required on the storm drain side of the proposed pavement. 6.4 Backfill of Utility Lines. Placement and stabilization of backfill for franchised utility lines and water, wastewater and storm drain lines installed by the Developer's contractor will be the responsibility of the Developer. Placement and stabilization of backfill for franchised utility lines installed by the individual utility companies will be the responsibility of each individual utility company. Backfill compaction and testing requirements are outlined in Section 9.3. Backfill shall comply with the City of Fort Smith Standard Specifications and Standard Drawings.

Ask a question about Fort Smith law

Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.