§ 70-89 — Wastewater discharge permit eligibility

Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 70-89

Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/b47aec6c-1cf0-47da-98f7-fbb973380ac8

Sec. 70-89. - Wastewater discharge permit eligibility.

(1) Wastewater survey. When requested by the manager, all industrial users must submit information on the nature and characteristics of its wastewater by completing a wastewater survey prior to commencing discharge. The manager is authorized to prepare a special form for this purpose and may periodically require industrial users to update this information. Failure to complete this survey or update the information as required shall be considered a violation of this division and reasonable grounds for terminating water and wastewater service to the industrial user. (2) Wastewater discharge permit requirements. (a) It shall be unlawful for any SIU to discharge wastewater into the POTW without first obtaining an individual or general industrial wastewater discharge permit from the manager with the exception that an SIU that has filed a timely application pursuant to subsection (3) of this section may continue to discharge for the time period specified therein. Any violation of the terms and conditions of an individual or general wastewater discharge permit shall be deemed a violation of this division and subjects the individual or general wastewater discharge permittee to the provisions in section 70-95 through section 70-97. Obtaining an individual or general wastewater discharge permit does not relieve a permittee of its obligation to comply with all applicable federal and state pretreatment standards or requirements. (b) The manager may require other industrial users, including liquid waste haulers, to obtain individual or general industrial wastewater discharge permits as necessary to carry out the purposes of this division. (3) Individual or general wastewater discharge permitting—Existing connections. Within 90 days after notification, any industrial user required to obtain an individual or general wastewater discharge permit that is discharging wastewater into the POTW and wishes to continue such discharges in the future shall apply to the Manager for an individual or general wastewater discharge permit in accordance with subsection (5) of this section. The manager will furnish the user an appropriate permit application package. Existing users shall not cause or allow discharges to the POTW to continue after 180 days after notification of the requirement to obtain an individual or general wastewater discharge permit, except in accordance with an individual or general wastewater discharge permit issued by the manager. (4) Individual or general wastewater discharge permitting—New connections. Any user required to obtain an individual or general wastewater discharge permit proposing to begin or recommence discharging industrial wastes into the POTW must obtain such permit prior to the beginning or recommencing of such discharge. An application for this individual or general wastewater discharge permit must be filed at least 90 days prior to the date upon which any discharge will begin or recommence, unless the 90-day period is otherwise waived by the manager. (5) Individual or general wastewater discharge permit application contents. All users required to obtain an individual or general wastewater discharge permit must submit a permit application. All or part of the following information may be requested by the manager as part of a permit application: (a) Identifying information. 1. The name and address of the facility, including the name of the operator and owners; 2. Contact information, description of activities, facilities, and plant production processes on the premises; (b) Environmental permits. A list of any environmental control permits held by or for the facility; (c) Description of operations. 1. A brief description of the nature and average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications (SIC) of the operation(s) carried out by the industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes; 2. Types of wastes generated and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; 3. Number and type of employees and proposed or actual hours of operation; 4. Type and amount of raw materials processed (average and maximum per day); 5. Site plans; floor plans; mechanical and plumbing plans; details to show all sewers, floor drains, and appurtenances by size, location, and elevation; and all points of discharge; (d) Time and duration of discharges; (e) The location for monitoring all wastes covered by the permit; (f) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula, as set out in 40 CFR 403.6(e); (g) Measurement of pollutants. 1. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources; 2. The results of sampling and analysis identifying the nature and concentration and/or mass, where required by the standard or by the manager, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations or mass shall be reported where required. The sample shall be representative of daily operations; 3. In cases where the standard requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the manager or the applicable standards to determine compliance with the standard; 4. Sampling and analysis shall be pursuant with section 70-91(10) and (11); (h) Any request to be covered by a general permit based on subsection (8) of this section; and (i) Any other information as may be deemed necessary by the manager to evaluate the individual or general wastewater discharge permit application. Incomplete or inaccurate applications will not be processed and will be returned to the industrial user for revision. (6) Application signatories and certification. (a) All individual or general wastewater discharge permit applications, industrial user reports, and certification statements must contain the certification statement in section 70-91(14)(a) and be signed by an authorized representative of the industrial user. (b) If the designation of an authorized representative of the industrial user is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the user, a new written authorization satisfying the requirements of this section must be submitted to the manager prior to or together with any reports to be signed by an authorized representative of the industrial user. (7) Individual or general wastewater discharge permit decisions. The manager will evaluate the data furnished by the industrial user and reserves the right to require additional information. Within 90 days of receipt of a complete individual or general wastewater discharge permit application, the manager will determine whether or not to issue an individual or general wastewater discharge permit to the applicant. The manager may deny any application for an individual or general wastewater discharge permit where it reasonably appears that the applicant's proposed wastewater, if discharged into the POTW, would interfere with the operation of the POTW or otherwise be incompatible with the POTW; interfere with reuse of sludge from the POTW; or pass through the POTW, inadequately treated, into the receiving waters of the state. (8) Wastewater discharge permitting—General permits. (a) At the discretion of the manager, general permits may be used to control SIU discharges to the POTW if the following conditions are met. All facilities to be covered by a general permit must: 1. Involve the same or substantially similar types of operations; 2. Discharge the same types of wastes; 3. Require the same effluent limitations; 4. Require the same or similar monitoring; and 5. In the opinion of the manager, are more appropriately controlled under a general permit than under individual wastewater discharge permits. (b) To be covered by the general permit, the SIU must file a written request for coverage that identifies its contact information, production processes, the types of wastes generated, the location for monitoring all wastes covered by the general permit, and any other information the manager deems appropriate. (c) The manager will retain a copy of the general permit, documentation to support manager's determination that a specific SIU meets the criteria in subsection (8)(a)1.—5. of this section and applicable state regulations, and a copy of the user's written request for coverage for three years after the expiration of the general permit. (d) The manager may not control an SIU through a general permit where the facility is subject to production-based categorical pretreatment standards or categorical pretreatment standards expressed as mass of pollutant discharged per day or for IUs whose limits are based on the combined waste stream formula set out in 40 CFR 403.6(e) and section 70-8(2)(c).

(Ord. No. 12:009, § 2, 3-20-2012)