§ 70-92 — Compliance monitoring
Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 70-92
Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/66a2080c-8460-4096-8786-a4529c550773
Sec. 70-92. - Compliance monitoring.
(1) Right of entry—Inspection and sampling. The manager shall have the right to enter the facilities of any industrial user to ascertain whether the purpose of this division and any individual or general permit or order issued hereunder is being met and whether the industrial user is complying with all requirements thereof. Industrial users shall allow the manager ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. (a) Where an industrial user has security measures in force which require proper identification and clearance before entry into its premises, the industrial user shall make necessary arrangements with its security personnel so that, upon presentation of suitable identification, personnel from CWL will be permitted to enter without delay, for the purposes of performing their specific responsibilities. (b) The manager shall have the right to locate on the industrial user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations. (c) The manager may require the industrial user to install monitoring equipment as necessary and in accordance with subsection (3) of this section. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the industrial user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated regularly and periodically to ensure accuracy. (d) Any temporary or permanent obstruction to safe and easy access to the industrial facility to be inspected and/or sampled shall be promptly removed by the industrial user at the written or verbal request of the manager and shall not be replaced. The costs of clearing such access shall be borne by the industrial user. (e) Unreasonable delays in allowing authorized CWL personnel access to the industrial user's premises shall be a violation of this division. (2) Search warrants. If the manager has been refused access to a building, structure, property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this division; or that there is the need to inspect and/or sample as part of a routine inspection and sampling program of CWL designed to verify compliance with this division or any permit or order issued hereunder; or to protect the overall public health, safety, and welfare of the community; then upon application by the manager through the CWL attorney, the applicable court of the city or of the state shall issue a search and/or seizure warrant, describing therein the specific location subject to the warrant. The warrant shall specify what may be searched and/or seized on the property described and shall contain any other information required by applicable law. Such warrant shall be served at reasonable hours by the manager in the company of a uniformed police officer of the city or as otherwise allowed or required by applicable law. In the event of an emergency affecting public health and safety, the manager may authorize inspections and sampling without the issuance of a warrant. (3) Location of monitoring facility. The location of the monitoring facility shall provide ample room in or near the monitoring facility to allow accurate sampling and preparation of samples and analysis and, whether constructed on public or private property, should be provided in accordance with the manager's requirements and all applicable local construction standards and specification. Such facilities shall be constructed and maintained in such a manner as to enable the manager to perform independent monitoring activities.
(Ord. No. 12:009, § 2, 3-20-2012)
Ask a question about Jonesboro law
Corpus searches the Jonesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.
