§ 70-98 — Affirmative defenses to discharge violations
Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 70-98
Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/8c3e61b4-0992-4b78-88fd-224c71c9640a
Sec. 70-98. - Affirmative defenses to discharge violations.
(1) Upset. (a) For the purposes of this section, "upset" means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the industrial user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. (b) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical pretreatment standards if the requirements of subsection (1)(c) of this section are met. (c) An industrial user wishing to establish the affirmative defense of upset shall demonstrate through properly signed, contemporaneous operating logs or other relevant evidence that: 1. An upset occurred, and the industrial user can identify the causes(s) of the upset; 2. The facility was at the time of upset being operated in a prudent and workmanlike manner, in compliance with applicable operation and maintenance procedures; and 3. The industrial user has submitted the following information to the manager or authorized representative of the manager within 24 hours of becoming aware of the upset (if this information is provided orally, a written submission must also be provided within five days): a. A description of the indirect discharge and cause of noncompliance; b. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and c. Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. (d) In any enforcement proceeding, the industrial user seeking to establish the occurrence of an upset shall have the burden of proof. (e) Industrial users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. (f) The industrial user shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility, until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of electric power of the treatment facility is reduced, lost, or fails. (2) Prohibited discharge standards. An industrial user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general prohibitions listed in section 70-87(1)(a) and specific prohibitions listed in section 70-87(1)(b)3.—13. if the user can prove that it did not know or have reason to know that its discharge, alone or in conjunction with discharges from other sources, would cause pass through or interference and, that either: (a) A local limit exists for each pollutant discharged, and the industrial user was in compliance with each limit directly prior to and during the pass through or interference; or (b) No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the POTW was regularly in compliance with its NPDES permit, and in the case of interference was in compliance with applicable sludge use and/or disposal requirements. (3) Bypass. (a) Definitions. 1. "Bypass" means the intentional diversion of waste streams from any portion of an industrial user's treatment facility. 2. "Severe property damage" means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. (b) An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if for essential maintenance or to assure efficient operation. These bypasses are not subject to the provision of subsections (3)(c) and (d) of this section. (c) Notification of bypass. 1. If an industrial user knows in advance of the need for a bypass, the IU shall submit prior notice to the manager, at least ten days before the date of the bypass if possible. 2. An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the manager within 24 hours from the time it becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The manager may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (d) Enforcement action against or approval of a bypass. 1. Bypass is prohibited, and the manager may take enforcement action against an industrial user for a bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; b. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. The industrial user submitted notices as required under subsection (3)(c) of this section. 2. The manager may approve an anticipated bypass, after considering its adverse effects, if such bypass meets the conditions listed in subsection 1. above. _____
(Ord. No. 12:009, § 2, 3-20-2012)
Ask a question about Jonesboro law
Corpus searches the Jonesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.
